| Course | MKT 665 Digital Story Telling and Branding |
|---|---|
| Module | Module 9 |
| Paper type | graduate discussion post on whether a brand story may imply an origin that does not apply to every product, with attention to law, trust and audience reaction |
| Length | About 330 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 665 Module 9
Module Nine Discussion
"Made in Titusville" and the Blades from Abroad
Sales wants "Made in Titusville" printed on every Oil Creek package before the holidays. The chef's and carving knives are forged, ground and sharpened in Titusville. The steak and paring knives, about 30 percent of units, have blades stamped by a supplier in Taiwan; they are ground, handled and sharpened here. I would not print the claim on those.
The Federal Trade Commission (1998) says an unqualified Made in USA claim is acceptable only when all or virtually all of the product is made in the United States, and that a significant part, such as a blade, made abroad generally rules the claim out. A knife's blade is not a minor input. "Made in Titusville" implies more than "Made in USA," not less.
Verlegh and Steenkamp (1999), combining dozens of country-of-origin studies, found origin had its largest effect on how people judged quality, and they noted it carries emotional and symbolic weight as well. That is exactly why sales wants the line. Delmas and Burbano (2011) traced misleading green claims to weak enforcement, market pressure from rivals and customers and to organizational habits that let marketing run ahead of the facts. Origin claims are tempted by the same forces.
Thompson et al. (2006), drawing on critics of Starbucks, showed how opponents turn a brand's own emotional story against it and spread the parody widely. One forum post with a photo of a Taiwanese stamping mark would retell the campaign as a lie, and Earl's real work would be doubted along with the false label.
Chef's and carving knives: "Forged, ground and sharpened in Titusville, Pennsylvania." Steak and paring knives: "Blades stamped in Taiwan; ground, handled and sharpened in Titusville." A two-minute video would show both lines. The second label is longer and still true, and the truth is part of what the brand sells.
How would you label a product that is made in two countries, and would you still tell its story?
References
Delmas, M. A., & Burbano, V. C. (2011). The drivers of greenwashing. California Management Review, 54(1), 64-87. https://doi.org/10.1525/cmr.2011.54.1.64
Federal Trade Commission. (1998). Complying with the Made in USA standard. https://www.ftc.gov/business-guidance/resources/complying-made-usa-standard
Thompson, C. J., Rindfleisch, A., & Arsel, Z. (2006). Emotional branding and the strategic value of the doppelgänger brand image. Journal of Marketing, 70(1), 50-64. https://doi.org/10.1509/jmkg.70.1.050.qxd
Verlegh, P. W. J., & Steenkamp, J.-B. E. M. (1999). A review and meta-analysis of country-of-origin research. Journal of Economic Psychology, 20(5), 521-546. https://doi.org/10.1016/S0167-4870(99)00023-9
What the MKT 665 Module 9 instructions ask for
The ninth MKT 665 discussion frequently asks you to consider ethics and honesty in brand storytelling, often through claims about origin, heritage, sustainability or social purpose. Expect to judge a specific claim your brand might make, explain whether it is accurate, legal and fair to the audience and recommend what to say instead. Strong posts examine the facts behind the claim, refer to applicable standards such as the Federal Trade Commission's rules, weigh how audiences react when they discover a misleading claim and propose precise alternatives that keep the story's strength. They also recognize the commercial pressure behind the proposal. Propose the exact wording you would print, since the discussion turns on specific labels.
How this MKT 665 Module 9 discussion example is built
The sample considers a proposal to print "Made in Titusville" on all packaging at the composite Oil Creek Cutlery Company. Chef's and carving knives are forged, ground and sharpened in Titusville, but the blades of steak and paring knives, about 30 percent of units, are stamped by a supplier in Taiwan and finished in Pennsylvania. The post argues that the claim fails the Federal Trade Commission's "all or virtually all" standard and would invite an online counter-story that undoes the campaign. It draws on Verlegh and Steenkamp on country-of-origin effects, Delmas and Burbano on why firms make misleading claims and Thompson, Rindfleisch and Arsel on critics' counter-stories, and proposes labels for each line. The post closes by asking how classmates would label a product made in two countries.
Where the MKT 665 Module 9 rubric puts the points
This discussion is generally assessed on a clear judgment about a specific claim, accurate use of legal or industry standards, use of research on origin, trust or misleading claims, a constructive alternative, and replies that test classmates' reasoning. Strong posts take the commercial case seriously before rejecting or reshaping it. Posts lose credit for vague appeals to honesty with no standard, ignoring the facts of the supply chain, treating legal compliance as the only test or offering no alternative wording. Replies that suggest a precise label for a classmate's product add the most. Posts that show how a false claim could be exposed, and what it would cost, are the strongest.
MKT 665 Module 9 help: the mistakes that cost points
State the claim and the facts behind it: where each part is made, by whom and what share of the product it represents. Check the claim against any legal standard that applies, such as the Federal Trade Commission's rules on origin and environmental claims. Then ask how a well-informed customer would feel on learning the facts, and how critics might retell the story online. Recognize why the company wants the claim, and offer wording that keeps as much of the story's strength as the facts allow. Close with a question about where classmates would place the line between simplicity and accuracy. Write both labels out in full and check each word against where the work is done.
Get MKT 665 Module 9 written to your instructions
Bring the MKT 665 Module 9 prompt and the claim your brand is weighing. We test it against the law, the evidence on origin and trust and the risk of public backlash, then suggest wording that stays true and ask classmates a question to open the replies. We write the first post free, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 665 papers and related MS in Marketing samples
- MKT 665 Module 1 Discussion: Why Stories Persuade
- MKT 665 Module 2 Brand Story Audit Assignment: Brand Story Audit
- MKT 665 Module 3 Milestone One: Brand Narrative and Target Audience
- MKT 665 Module 4 Discussion: Brand Authenticity in Digital Storytelling
- MKT 665 Module 5 Story Development Assignment: Developing a Brand Story for Video
- MKT 665 Module 6 Milestone Two: Storytelling Content Plan Across Channels
- MKT 665 Module 7 Discussion: Customers' Stories and Brand Communities
- MKT 665 Module 8 Story Measurement Assignment: Measuring a Storytelling Campaign
- MKT 665 Module 10 Final Project: Digital Storytelling Campaign
- OL 620 Module 2 Job Evaluation Assignment: Job Analysis and Job Evaluation
- SPT 700 Module 7 Discussion: Teenagers with Whistles
- OL 665 Module 5 Milestone Two: Leadership Strategies and Communication Practices
- OL 640 Module 6 Discussion: Franchisee Selection
MKT 665 Module 9 questions, answered
Where can I find a free MKT 665 Module 9 Discussion sample?
The full MKT 665 Module 9 post on this page explains why a composite knife maker should not print "Made in Titusville" on knives with blades made abroad.
When can a product be labeled Made in USA?
Under the Federal Trade Commission's standard, an unqualified claim is acceptable only when nearly every part of the product is made in the United States; otherwise a qualified claim must explain the foreign content.
Does country of origin affect what customers think?
A meta-analysis found that country of origin affects perceived quality more strongly than attitude or purchase intention, and that it carries emotional and symbolic meaning too.
What happens when a brand story is found to be misleading?
Critics can build and spread counter-stories that mock the brand, which may damage trust in all its claims, including true ones.
How can a brand describe a product made in several places?
With precise, qualified wording that names what is done where, such as "ground, handled and sharpened in Titusville with blades from Taiwan."