OL 620 Module 2 Job Evaluation Assignment Example

Reviewed by Portia Lambrick, MBA

This OL 620 Module 2 Job Evaluation Assignment sample designs a job analysis and point-factor job evaluation process to build one internal job hierarchy. SNHU OL 620 (OL-620) asks MS Organizational Leadership students to build this internal foundation before turning to market pay. The organization is Prairie Junction Cooperative, a composite Minnesota farm co-op whose merger left 180 job titles for about 70 distinct jobs. The paper plans job analysis across grain, agronomy and propane sites, builds a point-factor plan with weighted compensable factors, scores eight benchmark jobs and groups them into grades, using research on biases and reliability in job analysis.

CourseOL 620 Total Rewards
ModuleModule 2
Paper typegraduate assignment designing a job analysis and point-factor job evaluation process to build an internal job hierarchy
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 620 Module 2

1

From 180 Titles to One Ladder: Job Evaluation at Prairie Junction Cooperative

[Student Name]

Southern New Hampshire University

OL 620: Total Rewards

Job Evaluation Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe job titles, factor weights and point scores in this OL 620 paper are invented.
2

From 180 Titles to One Ladder: Job Evaluation at Prairie Junction Cooperative

Introduction

Prairie Junction Cooperative inherited 180 job titles from the two co-ops that merged to form it, Blue Earth Valley and Cottonwood Farmers. Many describe the same work: Blue Earth's "grain operations specialist" and Cottonwood's "elevator hand" do much the same job, at pay rates that differ by more than a dollar an hour. Before the co-op can set pay against the market, it needs to know what its jobs are and how they rank against one another. This paper plans job analysis, chooses a job evaluation method, builds a point-factor plan, applies it to eight benchmark jobs and shows the resulting grade structure.

What this page is doingFrames the task.
3

Job Analysis Plan

Information will come from three sources. A structured questionnaire, completed by two incumbents and the supervisor for each title, will record tasks, time spent, equipment, certifications and hazards. Analysts from HR will interview each supervisor to resolve differences. And analysts will observe work at a grain site during harvest, an agronomy center during spring application and a propane route in winter, because the jobs change dramatically by season.

Morgeson and Campion (1997) listed the ways job data go wrong because of how people think and how they want to be seen, including incumbents presenting their jobs favorably, groups converging on inflated ratings and raters simplifying complex jobs or relying on stereotypes. Dierdorff and Wilson (2003), combining 46 studies, found that incumbents' ratings were the least reliable of the sources examined, and that task-level data, once corrected for scale length and number of raters, were more reliable than ratings of broad work activities. The plan responds by collecting task-level data, combining incumbent, supervisor and analyst views and asking about time and importance, the scales that research found most reliable.

What this page is doingGathers accurate job information.
4

Choosing a Method

Ranking would be quick but cannot handle 70 jobs consistently or explain why one job outranks another. Classification into predefined grades would fit a government agency more than a co-op whose jobs span grain handling, chemical application, fuel delivery, retail and finance. Market pricing alone would anchor every job to survey data that cover only about half of the co-op's jobs. Scoring every job on weighted factors is slower, yet it yields a ladder the co-op can defend and explain, and it can be combined with market data in Milestone One.

What this page is doingJustifies point-factor evaluation.
5

Compensable Factors

Compensable factors and weights

FactorWhat it measuresWeightLevels
Knowledge and certificationEducation, licenses (CDL, pesticide applicator, grain grading) and experience required40%6
Responsibility for safety and assetsConsequences of error for people, product, equipment and money30%5
Physical effortLifting, climbing, sustained exertion15%4
Working conditionsExposure to dust, chemicals, heights, weather and confined spaces15%4

The weights reflect what both legacy co-ops said they valued: certified skill and safe handling of grain, chemicals and fuel. Leaders from both co-ops reviewed draft weights in a half-day session, and the main debate was over physical effort, which elevator supervisors wanted weighted higher; the final 15 percent was a compromise that keeps knowledge and responsibility, the factors most tied to the co-op's results, in front. Working conditions carry real weight because elevator and propane work exposes people to hazards that office work does not.

What this page is doingDefines what the co-op pays for.
6

Scoring Benchmark Jobs

Benchmark job scores (maximum 1,000 points)

Benchmark jobKnowledgeResponsibilityEffortConditionsTotalGrade
Farm store sales associate806050302202
Grain elevator operator1601801201305906
Feed mill operator1601501101105305
CDL propane delivery driver2402401001207008
Certified custom applicator280240901407508
Accounting specialist20012030203704
Grain merchandiser32024030206107
Agronomist36021060807108

Grades are set at intervals of about 80 points, producing twelve grades for the co-op's 72 jobs. The remaining 64 jobs will be scored by the same committee and slotted into these grades over the next two months.

What this page is doingApplies the plan.
7

How Many Jobs, and Which Are Benchmarks

Analysts grouped the 180 titles into 72 jobs by comparing questionnaire results: titles were combined when at least 80 percent of their tasks and time matched and they required the same certifications. Some combinations were easy, such as the six titles both co-ops used for farm store cashiers and stockers. Others took judgment. Blue Earth's "agronomy technician" mixed field scouting with custom application, while Cottonwood split those duties into two jobs; the analysts kept two jobs and assigned each technician to the one that matched most of his or her time. The eight benchmark jobs were chosen because they span the full range of grades, exist at both legacy co-ops, employ enough people to matter and have clear matches in salary surveys, which will be needed in Milestone One.

What this page is doingExplains the job list.
8

Who Will Do the Scoring

An evaluation committee of six, two supervisors from each legacy co-op, an HR analyst and an employee from the farm stores, will score every job after training on the factor definitions. Each member scores independently first; the committee then discusses differences of more than one level and records the reason for the final score. Using several raters with mixed backgrounds and recording reasons is the plan's main defense against the inflation and conformity problems described above.

What this page is doingBuilds a credible process.
9

Testing the Hierarchy

A panel of six supervisors from both legacy co-ops will review the benchmark results. Two concerns have already surfaced. The accounting specialist, a job held mostly by women at both co-ops, scores below the feed mill operator because the plan weights physical effort and conditions, although the specialist's errors can cost the co-op money. The panel will test whether the responsibility factor captures financial accuracy adequately. And the grain merchandiser scores below jobs that the market pays less, which the market analysis in Milestone One will need to address.

What this page is doingChecks results and bias.
10

Keeping Job Information Current

Sanchez and Levine (2012) described how job analysis has shifted toward broader work analysis that recognizes changing, team-based and flexible work. The co-op's jobs are changing too: precision agriculture is adding data work to agronomy, and automated grain systems are changing elevator work. Job information will be reviewed every two years and whenever a job's duties change substantially.

What this page is doingPlans for change.
11

Conclusion

The point-factor plan gives Prairie Junction a single, explainable ladder for jobs that the merger left tangled. Combined with market data in Milestone One, it will support a pay structure employees from both legacy co-ops can understand.

What this page is doingSummarizes.
12

References

Dierdorff, E. C., & Wilson, M. A. (2003). A meta-analysis of job analysis reliability. Journal of Applied Psychology, 88(4), 635-646. https://doi.org/10.1037/0021-9010.88.4.635

Morgeson, F. P., & Campion, M. A. (1997). Social and cognitive sources of potential inaccuracy in job analysis. Journal of Applied Psychology, 82(5), 627-655. https://doi.org/10.1037/0021-9010.82.5.627

Sanchez, J. I., & Levine, E. L. (2012). The rise and fall of job analysis and the future of work analysis. Annual Review of Psychology, 63, 397-425. https://doi.org/10.1146/annurev-psych-120710-100401

What the OL 620 Module 2 instructions ask for

The Module 2 assignment in OL 620 asks students to establish internal equity through job analysis and job evaluation. Expect to explain how information about jobs will be gathered, choose a job evaluation method and justify it, define and weight compensable factors if you use a point-factor plan, apply the plan to benchmark jobs and show the resulting hierarchy. Strong papers explain the trade-offs among methods, such as ranking, classification, point-factor and market pricing, choose factors that reflect what the organization actually values and acknowledge the judgment and potential bias involved. Graders expect benchmark scoring to be shown, not just described, and the hierarchy to make sense to people who know the work.

How this OL 620 Module 2 job evaluation assignment example is built

The sample designs job evaluation for Prairie Junction Cooperative, an imagined southern Minnesota farm co-op formed by merging two co-ops whose 180 job titles cover about 70 distinct jobs. It plans job analysis through a structured questionnaire, interviews with supervisors and site observation during harvest and spring application, and it guards against the self-promotion and groupthink that Morgeson and Campion warned can skew job data, along with the unreliable incumbent ratings documented by Dierdorff and Wilson, to design safeguards. A point-factor plan with four factors, knowledge and certification, responsibility for safety and assets, physical effort and working conditions, is weighted for the co-op's work and applied to eight benchmark jobs, from grain elevator operator to agronomist, producing a twelve-grade ladder. Sanchez and Levine's review informs a plan to keep job information current.

Where the OL 620 Module 2 rubric puts the points

OL 620 job evaluation papers are usually graded on a sound job analysis plan, a justified choice of evaluation method, well-defined and sensibly weighted compensable factors, correct application to benchmark jobs, a coherent resulting hierarchy, awareness of bias and reliability problems and clear APA writing. The strongest OL 620 papers show the scoring and explain why the hierarchy fits the organization's values. Points are lost for factor definitions too vague to score, for weights with no rationale, for skipping benchmark scoring, for ignoring the risk that job titles rather than duties drive scores or for missing the possibility that factors themselves undervalue some kinds of work.

OL 620 Module 2 help: the mistakes that cost points

Start with the jobs: list titles and group duplicates by what people actually do, not what they are called. Plan job analysis with more than one source, such as questionnaires, interviews and observation, since each has blind spots. Choose a method and explain why; point-factor plans take more work but are easier to defend. Pick three to five compensable factors that reflect what the organization pays for, define each with levels and weight them. Score a set of benchmark jobs that span the organization and show the points. Check the hierarchy with people who know the work, and watch for factors that undervalue work done mostly by one group. Explain how job information will be kept current.

Get OL 620 Module 2 written to your instructions

Send the OL 620 Module 2 directions and a list of the jobs you need to evaluate. We plan the job analysis, choose and weight compensable factors, score benchmark jobs, group them into grades and explain the method's strengths and limits with research on job analysis accuracy. Your first OL 620 job evaluation paper is free and returned in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 620 papers and related MS Organizational Leadership samples

OL 620 Module 2 questions, answered

Where can I find a free OL 620 Module 2 job evaluation sample?

This page holds the complete OL 620 Module 2 paper: a point-factor job evaluation plan for a merged farm cooperative's 180 job titles.

What is a point-factor job evaluation?

A method that rates each job on defined compensable factors, such as skill, responsibility, effort and working conditions, and sums weighted points to rank jobs.

What are compensable factors?

The characteristics of jobs an organization chooses to pay for, such as required knowledge, responsibility, physical effort and working conditions.

Who gives the most reliable job analysis ratings?

A meta-analysis found job incumbents gave less reliable ratings than trained analysts or technical experts, so combining sources improves accuracy.

What is the difference between job analysis and job evaluation?

Job analysis gathers information about what a job involves; job evaluation uses that information to judge each job's relative worth to the organization.