| Course | OL 620 Total Rewards |
|---|---|
| Module | Module 5 |
| Paper type | graduate milestone designing incentive and pay-for-performance programs for different employee groups, with costs and compliance |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 620 Module 5
Paying for Results at Prairie Junction Cooperative
[Student Name]
Southern New Hampshire University
OL 620: Total Rewards
Milestone Two: Incentives and Pay for Performance
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Paying for Results at Prairie Junction Cooperative
Introduction
Milestone One built one pay structure for Prairie Junction Cooperative and set base pay at the market median for most jobs, with a premium for applicators, CDL propane drivers and grain merchandisers. This milestone designs the variable pay that sits on top: what the co-op will pay for results, to whom and how, at what cost and with what safeguards.
Principles
Three principles guide the design. Incentives should match how the work is done: most of the co-op's work is done in crews, so most incentives are team or co-op-wide. Employees must be able to influence what is measured. And no incentive may reward speed or volume in a way that could compromise safety in work involving grain bins, chemicals or propane. The two legacy co-ops also bring different expectations: former Cottonwood employees are used to profit sharing and will judge the new system by whether it continues, while former Blue Earth employees have never had variable pay and may see it as uncertain. The design therefore keeps profit sharing for everyone and adds smaller, more predictable incentives that employees can see themselves earning during the season.
Research Behind the Design
Nyberg et al. (2016), following 11,939 employees over five years, found that both merit pay and bonus pay, and their trends over several years, were positively associated with employees' future performance, with effects that depended on characteristics of the employee, the job and the pay system. Garbers and Konradt (2014), combining 146 studies, found a positive average effect of individual incentives and a larger effect of team incentives, with team rewards distributed equitably, by contribution, outperforming rewards split equally. Larkin et al. (2012) warned that paying individuals for their own results brings hidden costs, as people measure themselves against coworkers and overrate their own output, which can make team-based, seniority-based and flatter pay more effective than economic models predict.
The Programs
Incentive programs by employee group
| Program | Who | Measures | Payout | Expected annual cost |
|---|---|---|---|---|
| Co-op profit sharing | All employees | Local net savings above 4% of sales | Up to 5% of pay | About $1,520,000 at target |
| Harvest team incentive | Elevator crews (about 120 people) | Bushels handled per labor hour, grading accuracy, zero recordable injuries | Up to $1,200 per person, shared by hours worked | About $110,000 |
| Applicator incentive | Certified applicators (34) | Acres applied without misapplication complaints, equipment care | Up to $2,500 per person | About $68,000 |
| Propane safety and service bonus | CDL drivers (41) | Zero preventable incidents, on-time delivery, customer complaints | Up to $400 per quarter | About $49,000 |
| Performance step | All employees | Sustained performance rating of "strong" or above for two years | One step (about 3%) in range | About $310,000 a year |
Guardrails
The harvest incentive pays nothing to any crew with a recordable injury or a confined-space or bin-entry violation during the season, which removes any reward for rushing. The applicator incentive measures acres applied without complaints, not acres alone, and any misapplication confirmed by the state agriculture department cancels the payout. Propane drivers earn the bonus only with zero preventable incidents, so on-time delivery cannot be bought with risk. Office and farm-store employees, whose individual output is harder to separate and measure, share in profit sharing and the performance step rather than individual bonuses, consistent with Larkin and colleagues' caution about individual incentives where comparisons are easy and outputs hard to measure.
Merit and the Performance Step
Rather than individual merit percentages that vary widely, employees move through their ranges by steps: one step a year for satisfactory performance until midpoint, and an extra performance step for sustained strong performance. This keeps pay growth predictable and explainable, important after a merger in which many employees distrust how pay was set, while still connecting pay to performance as Nyberg and colleagues' findings support.
How Payouts Will Be Communicated
People cannot aim for a target they cannot read. Every plan gets a one-sheet summary, written in English and Spanish without jargon, with a sample calculation for a typical worker at target. Elevator crews will see their harvest measures updated weekly on a board at each site, applicators will receive a mid-season statement of acres applied and complaints and propane drivers will get a quarterly scorecard. Profit-sharing results will be reported at each location's annual meeting along with the co-op's financial results, so employees see how local savings turn into their payout. Supervisors will be trained to explain each plan before the season begins, not after the checks arrive.
Reviewing the Plans
Each plan will be reviewed after its first full season against three questions: did the measured results improve, did safety or quality suffer anywhere and did employees understand and trust the plan? The harvest incentive will be compared with the previous two harvests at the same sites, adjusting for crop size. Any plan that fails to improve its target results after two seasons will be redesigned or dropped, and the savings returned to base pay.
Costs
At target payouts, variable pay costs about $2.06 million a year, or 5.4 percent of the $38 million payroll, of which profit sharing is the largest piece and is paid only in years when local savings exceed the threshold. At maximum payouts the total would be about $2.5 million. The team and safety incentives together cost less than 0.6 percent of payroll and target the groups with the highest turnover. Replacing a certified applicator costs the co-op about $9,000 and a CDL driver about $7,500, so halving turnover in those two groups would save roughly $80,000 a year, about two thirds of what their incentives cost, before counting the value of experienced people on the road and in the field.
Compliance
Under the Fair Labor Standards Act, nondiscretionary bonuses, those promised in advance for meeting set criteria, must be included in nonexempt employees' regular rate when overtime is calculated. The harvest, applicator and propane incentives all qualify, and payroll will recalculate overtime for the periods in which they were earned. Profit sharing paid as a percentage of total earnings, including overtime, satisfies the regular-rate rules. Incentive measures and payouts will be reviewed annually for differences by sex and race within comparable groups to stay consistent with the Equal Pay Act and Title VII.
Conclusion
The variable pay design rewards what the co-op needs, safe and accurate work done in crews, while keeping individual competition out of jobs where it would do harm.
References
Garbers, Y., & Konradt, U. (2014). The effect of financial incentives on performance: A quantitative review of individual and team-based financial incentives. Journal of Occupational and Organizational Psychology, 87(1), 102-137. https://doi.org/10.1111/joop.12039
Larkin, I., Pierce, L., & Gino, F. (2012). The psychological costs of pay-for-performance: Implications for the strategic compensation of employees. Strategic Management Journal, 33(10), 1194-1214. https://doi.org/10.1002/smj.1974
Nyberg, A. J., Pieper, J. R., & Trevor, C. O. (2016). Pay-for-performance's effect on future employee performance: Integrating psychological and economic principles toward a contingency perspective. Journal of Management, 42(7), 1753-1783. https://doi.org/10.1177/0149206313515520
What the OL 620 Module 5 instructions ask for
Milestone Two of the OL 620 final project asks students to design the variable pay and pay-for-performance elements of the total rewards strategy. Expect to choose incentive types suited to different employee groups, such as individual, team or organization-wide plans, define the measures and payout formulas, link the design to the organization's goals and estimate costs. Strong submissions match the incentive to how the work is done, since interdependent work calls for different rewards than independent work, test each plan for behaviors it might encourage by accident and address legal requirements such as including nondiscretionary bonuses in overtime calculations. Research on incentives should inform both whether to use them and how to design them.
How this OL 620 Module 5 milestone two example is built
The sample designs variable pay for Prairie Junction Cooperative, an imagined southern Minnesota farm co-op with about 640 employees. It keeps co-op-wide profit sharing, funded at up to 5 percent of pay when local net savings exceed a threshold, and adds a harvest team incentive for elevator crews based on bushels handled, grading accuracy and zero recordable injuries, a season-end incentive for certified applicators based on acres applied without misapplication complaints, a quarterly safety and service bonus for propane drivers and a performance step within each pay range. Using Nyberg, Pieper and Trevor's study of merit and bonus pay, Garbers and Konradt's meta-analysis of individual and team incentives and Larkin, Pierce and Gino's account of the psychological costs of individual pay for performance, it costs each plan, tests for unintended effects and reviews FLSA rules.
Where the OL 620 Module 5 rubric puts the points
Rubrics for OL 620 Milestone Two usually reward incentive designs matched to the work of each employee group, clear measures and payout formulas, alignment with organizational goals, realistic costs, analysis of unintended consequences, attention to legal requirements such as overtime regular-rate rules and research support. The strongest OL 620 second milestones explain why each group gets the type of incentive it does. Points are lost for a single individual bonus applied to everyone, for measures employees cannot influence, for incentives that reward speed in safety-sensitive work, for payouts with no cost estimate or for overlooking the FLSA treatment of nondiscretionary bonuses.
OL 620 Module 5 help: the mistakes that cost points
For each employee group, describe how the work is done: alone or in teams, with outcomes that can be measured or not. Choose an incentive type that fits: team or organization-wide plans where work is interdependent, individual plans only where individual results are measurable and separable. Define the measures, the threshold for payout and the formula, and make sure employees can influence what is measured. Ask what behavior each plan might encourage that you do not want, especially around safety, and add guardrails. Estimate the cost at expected and maximum payouts. Check the FLSA treatment of bonuses for nonexempt employees. Support the design with research on incentives, team rewards and pay for performance.
Get OL 620 Module 5 written to your instructions
Send the OL 620 incentive milestone prompt, the graded pay-structure milestone and a short note on each employee group. We design incentive and pay-for-performance programs for each group, define measures and payout formulas, cost them, test them for unintended effects and review FLSA treatment, backed by research. We write the first OL 620 Milestone Two at no charge, generally within forty-eight hours. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 620 papers and related MS Organizational Leadership samples
- OL 620 Module 1 Discussion: Compensation Philosophy
- OL 620 Module 2 Job Evaluation Assignment: Job Analysis and Job Evaluation
- OL 620 Module 3 Milestone One: Compensation Philosophy and Pay Structure
- OL 620 Module 4 Discussion: Pay Transparency
- OL 620 Module 6 Discussion: Employee Benefits Design
- OL 620 Module 7 Milestone Three: Benefits Strategy and Total Rewards Communication
- OL 620 Module 8 Discussion: Pay Equity
- OL 620 Module 9 Final Project: Total Rewards Strategy
- OL 620 Module 10 Discussion: The Limits of Money in Total Rewards
- CSR 610 Module 8 Compliance Program Assignment: Building a Program That Works
- INT 640 Module 4 Competitor Analysis Assignment: The British Modular Makers That Failed
- HRM 630 Module 2 Quality Assessment Paper: Defining Quality for Sixteen Languages
- MGT 600 Module 10 Final Project: The Integrated Resource Plan
OL 620 Module 5 questions, answered
Where can I find a free OL 620 Module 5 Milestone Two sample?
The complete OL 620 Milestone Two is on this page: profit sharing, team incentives and pay for performance for a farm cooperative's different employee groups.
Do financial incentives improve performance?
A meta-analysis of 146 studies found positive effects for individual incentives and larger effects for team incentives, especially when team rewards were divided equitably.
What is the difference between merit pay and a bonus?
Merit pay adds permanently to base pay based on performance; a bonus is a one-time payment that must be earned again, which keeps fixed costs lower.
Do bonuses count toward overtime pay?
Under the FLSA, nondiscretionary bonuses, such as those promised for meeting set criteria, must be included in a nonexempt employee's regular rate when calculating overtime.
What are the downsides of individual pay for performance?
Research points to psychological costs, such as harmful social comparisons and overconfidence, that can undermine cooperation, especially in interdependent work.