| Course | OL 620 Total Rewards |
|---|---|
| Module | Module 3 |
| Paper type | graduate milestone presenting a compensation philosophy, market analysis and pay structure with grades, ranges and a plan to move employees into the new structure |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 620 Module 3
One Pay Structure for Prairie Junction Cooperative
[Student Name]
Southern New Hampshire University
OL 620: Total Rewards
Milestone One: Compensation Philosophy and Pay Structure
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
One Pay Structure for Prairie Junction Cooperative
Introduction
Eighteen months after the merger, Prairie Junction's 640 employees are still paid under the old Blue Earth or Cottonwood rules, and the same job can pay more than two dollars an hour differently depending on which legacy co-op an employee came from. Module 2 built a single job ladder of twelve grades. This milestone sets out the co-op's compensation philosophy, analyzes the market, builds the pay structure and plans the transition, with compliance checks for wage and hour and equal pay law.
Compensation Philosophy
Prairie Junction will pay base salaries and wages at the market median for most jobs and at about the 75th percentile for certified custom applicators, CDL propane drivers and grain merchandisers, whose skills are scarce and whose turnover has been highest. Variable pay will come through co-op-wide profit sharing. Benefits will be competitive but chosen by what employees value most, as Milestone Three will address. Pay will reward skill, certification and sustained performance, and the co-op will explain how each employee's pay is set.
Market Analysis
Forty benchmark jobs covering about 70 percent of employees were matched to three sources: a national agricultural cooperative compensation survey, a regional Minnesota employer survey and published wage data for the region's nonmetropolitan counties. Each match was judged on duties, not titles; nine matches were rated weak and given less weight. Where sources disagreed, the agricultural survey was weighted 50 percent, the regional survey 35 percent and public wage data 15 percent.
Rynes et al. (1989) asked 400 compensation administrators to set pay for jobs with matched current rates, market rates and job evaluation points and found that market survey rates had the greatest influence on the pay they assigned, with no evidence in their design that job gender biased the decisions. Prairie Junction follows the same practice, setting midpoints from market data while using job evaluation to place jobs the surveys do not cover.
The Pay Structure
Selected grades in the new structure (hourly equivalents)
| Grade | Example jobs | Minimum | Midpoint | Maximum | Range spread |
|---|---|---|---|---|---|
| 2 | Farm store sales associate | $15.10 | $17.40 | $19.60 | 30% |
| 4 | Accounting specialist | $19.30 | $22.20 | $25.10 | 30% |
| 6 | Grain elevator operator | $21.90 | $25.70 | $29.50 | 35% |
| 8 | Agronomist, applicator, propane driver | $26.80 | $32.10 | $37.50 | 40% |
| 10 | Location manager | $34.00 | $42.50 | $51.00 | 50% |
Three scarce jobs, certified applicator, CDL propane driver and grain merchandiser, carry a market premium of 8 percent above their grade's range, reviewed every two years, rather than being placed in a higher grade, so the premium can be removed if their labor markets ease.
Pay Differences Within Grades
Shaw (2014), reviewing research on pay dispersion, concluded that differences in pay are less harmful when they are explained by legitimate factors such as skill, experience or performance than when they are not. Shaw et al. (2002) found that dispersion was associated with better workforce performance when paired with individual incentives and independent work, while compression worked better where work was interdependent and individual incentives were absent. Much of the co-op's work, at elevators and agronomy centers during harvest and planting, is highly interdependent. Within grades, the structure therefore keeps differences modest and tied to explainable factors: certifications, years in the job and a simple step for sustained performance, rather than wide individual merit swings.
Reconciling the Ladder and the Market
Job evaluation and the market agree for most jobs but not all. Grain merchandisers scored at grade 7 on the point-factor plan, yet the market pays them well above grade 7's midpoint because grain trading skills are scarce and merchandisers' decisions affect margins across the whole co-op. Rather than distort the factor plan, the structure handles this through the market premium. The opposite problem appears for accounting specialists, who scored at grade 4 while the regional survey shows them closer to grade 5. Because this job is held mostly by women at both legacy co-ops, the committee will revisit how the responsibility factor treats financial accuracy before the grade is final, so the structure does not carry forward an undervaluation of that work.
Communicating the Structure
Each worker gets a single sheet listing grade, range and where his or her rate falls within it, along with a short explanation of how grades and ranges were set. Supervisors will be trained to answer questions, and a monthly drop-in session will run during the first six months. Explaining the structure matters as much as building it, since the merger has left many employees convinced that pay is arbitrary.
Transition Plan
Placing employees in the new ranges finds 112 below their range minimum, mostly former Blue Earth employees, and 64 above maximum, mostly former Cottonwood employees in lower grades. Those below minimum will be raised to the minimum in two steps, half on January 1 and half the following year, at a cost of about $410,000 a year when complete. Those above maximum will keep their current pay, will receive annual increases as lump sums rather than additions to base pay and will be offered paths to higher-graded jobs where they qualify. No employee's pay will be cut. Together with market adjustments for the three premium jobs, the transition costs about 1.6 percent of the co-op's $38 million payroll in year one.
Compliance Review
The Fair Labor Standards Act requires overtime for nonexempt employees and limits exemptions to jobs meeting duties and salary tests. Both legacy co-ops classified grain merchandisers and location assistant managers as exempt; a review found assistant managers spend most of their time on nonexempt work, so the co-op will move them to hourly status with time-and-a-half after forty hours. Whether any agricultural overtime exemptions apply to particular grain or farm-supply work depends on specific facts and will be confirmed with counsel rather than assumed. Under the Equal Pay Act, a woman and a man doing substantially the same work at one establishment must receive the same rate unless seniority, merit, output or another factor besides sex explains the gap, so after placement HR will compare pay by sex within each grade and job, explain any differences by documented factors and correct those it cannot explain. Minnesota's pay transparency requirements for job postings will be addressed in Module 4.
Conclusion
The new structure gives every Prairie Junction employee a place on one ladder, ties pay to the market where the market can be measured and treats both legacy groups fairly in the move.
References
Rynes, S. L., Weber, C. L., & Milkovich, G. T. (1989). Effects of market survey rates, job evaluation, and job gender on job pay. Journal of Applied Psychology, 74(1), 114-123. https://doi.org/10.1037/0021-9010.74.1.114
Shaw, J. D. (2014). Pay dispersion. Annual Review of Organizational Psychology and Organizational Behavior, 1, 521-544. https://doi.org/10.1146/annurev-orgpsych-031413-091253
Shaw, J. D., Gupta, N., & Delery, J. E. (2002). Pay dispersion and workforce performance: Moderating effects of incentives and interdependence. Strategic Management Journal, 23(6), 491-512. https://doi.org/10.1002/smj.235
What the OL 620 Module 3 instructions ask for
Milestone One of the OL 620 final project typically asks students to set out a compensation philosophy and build the base pay structure for the case organization. Expect to state the organization's pay position and mix, analyze the external market using salary survey data matched to benchmark jobs, combine market data with internal job evaluation to form grades, set midpoints and range widths and plan how current employees will move into the new structure. Compliance with wage and hour and equal pay law belongs here too. Strong submissions show their market matching and calculations, explain how they reconciled conflicts between job evaluation and market rates, cost the transition and treat employees whose pay falls outside new ranges fairly.
How this OL 620 Module 3 milestone one example is built
The sample builds the pay structure for Prairie Junction Cooperative, an imagined southern Minnesota farm co-op formed by merging two co-ops with different pay systems. It states a philosophy of matching the market median for most jobs and leading it for applicators, CDL propane drivers and grain merchandisers, matches 40 benchmark jobs to agricultural and regional surveys and combines the results with Module 2's point-factor grades into twelve grades with midpoints at the market median and range spreads from 30 to 50 percent. It plans a two-year transition that brings 112 employees up to their range minimums and freezes 64 above maximum, costing about 1.6 percent of payroll, reviews FLSA exemptions and checks the structure for equal pay, using research on market data, pay dispersion and interdependent work.
Where the OL 620 Module 3 rubric puts the points
OL 620 Milestone One is generally scored on a clear compensation philosophy tied to strategy, sound market analysis with matched benchmark jobs, a defensible combination of market and internal data, correctly built grades, midpoints and ranges, a costed and fair transition plan, attention to FLSA and Equal Pay Act compliance and use of compensation research. The strongest OL 620 first milestones show the math and the judgment behind it. Marks are lost for survey data with no job matching, for ranges with no stated spread or midpoint logic, for transition plans that cut pay without considering retention, for ignoring exempt status or for structures never checked for pay differences by sex or race.
OL 620 Module 3 help: the mistakes that cost points
Begin with a one-paragraph philosophy: pay position by job group, the mix of base, variable pay and benefits and what pay rewards. Match benchmark jobs to survey jobs by duties, not titles, and note the quality of each match. Where job evaluation and market data disagree, explain which you followed and why. Build grades from the job evaluation, set midpoints from market data and choose range spreads that widen for higher grades. Place current employees in the new structure and count who falls below minimum and above maximum; cost raising the first group and decide how to treat the second. Review exempt classifications under the FLSA and check the structure for differences by sex. Show your calculations in tables.
Get OL 620 Module 3 written to your instructions
Share the OL 620 Milestone One guidelines, your job evaluation work and any market data you have. We write the compensation philosophy, match benchmark jobs to surveys, build grades, midpoints and ranges, cost the move into the new structure and review FLSA and Equal Pay Act compliance, with research behind each choice. The first OL 620 Milestone One is free, delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 620 papers and related MS Organizational Leadership samples
- OL 620 Module 1 Discussion: Compensation Philosophy
- OL 620 Module 2 Job Evaluation Assignment: Job Analysis and Job Evaluation
- OL 620 Module 4 Discussion: Pay Transparency
- OL 620 Module 5 Milestone Two: Incentives and Pay for Performance
- OL 620 Module 6 Discussion: Employee Benefits Design
- OL 620 Module 7 Milestone Three: Benefits Strategy and Total Rewards Communication
- OL 620 Module 8 Discussion: Pay Equity
- OL 620 Module 9 Final Project: Total Rewards Strategy
- OL 620 Module 10 Discussion: The Limits of Money in Total Rewards
- MGT 510 Module 2 Culture Assessment Assignment: Artifacts, Values and What No One Says
- MGT 605 Module 4 Pricing Assignment: Labor, Equipment and Materials for Concrete
- ACC 550 Module 5 Milestone Two: An Activity-Based Model for Retail and Bulk Channels
- MKT 618 Module 4 Discussion: Correlation, Causation and Marketing Data
OL 620 Module 3 questions, answered
Where can I find a free OL 620 Module 3 Milestone One sample?
The complete OL 620 Milestone One is on this page: a compensation philosophy, market analysis and pay structure for a merged farm cooperative.
How do you build a pay structure?
Group jobs into grades using job evaluation, set each grade's midpoint from market data and set a range around it, typically wider for higher grades.
What is a range spread?
The width of a pay range, expressed as the difference between maximum and minimum divided by the minimum, often 30 to 50 percent depending on the grade.
What are red-circled employees?
Employees paid above the maximum of their new range; employers often freeze or slow their increases rather than cut pay.
Should pay be based on job evaluation or market data?
Most employers combine them, using market data to set pay levels and job evaluation to place jobs the market does not cover and to keep internal relationships fair.