| Course | OL 620 Total Rewards |
|---|---|
| Module | Module 6 |
| Paper type | graduate discussion post evaluating benefits proposals using evidence on wellness programs and retirement plan design |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 620 Module 6
Module Six Discussion
A Wellness Pitch and a Retirement Default
Prairie Junction Cooperative is merging two benefits packages, and two proposals are on my desk. Our insurance broker recommends a $180,000-a-year wellness program, with biometric screenings, health coaching and gift-card incentives, and promises a three-to-one return in lower claims. Separately, only 58 percent of our employees participate in the 401(k) plan, and many of our younger elevator and farm-store employees have never enrolled.
Song and Baicker (2019) randomly assigned 160 worksites of a large U.S. retailer to receive a multicomponent wellness program or not. Eighteen months in, staff at the program sites said more often that they exercised regularly and were working on their weight, but the program produced no significant differences in clinical markers of health, medical spending, absenteeism or job performance. Rosier earlier figures mostly compared volunteers with nonvolunteers, mixing up the program's effect with who signs up. The broker's three-to-one claim rests on that kind of comparison.
Madrian and Shea (2001) compared hires before and after one large firm began enrolling new workers automatically: sign-up jumped, yet a large share of the new savers kept the preset 3 percent rate and the money market fund, choices hardly anyone had made when they had to opt in. Defaults work, which means the default must be chosen carefully. Dulebohn et al. (2009), reviewing research on employee benefits, described the shift from employer-managed toward employee-managed retirement and health plans, which makes plan design and education more important.
Adopt automatic enrollment at 4 percent of pay, rising one point a year to 8 percent, with the co-op's match on the first 5 percent. Decline the wellness program and use part of its cost to eliminate copays for preventive visits and screenings, a benefit every employee can use without a vendor. I would also hold two short sessions at each location during enrollment, since many of our harvest-season hires have never had a retirement account and may not know what the default means for them.
Which benefit do employees at your organization value most, and how did your employer find out?
References
Dulebohn, J. H., Molloy, J. C., Pichler, S. M., & Murray, B. (2009). Employee benefits: Literature review and emerging issues. Human Resource Management Review, 19(2), 86-103. https://doi.org/10.1016/j.hrmr.2008.10.001
Madrian, B. C., & Shea, D. F. (2001). The power of suggestion: Inertia in 401(k) participation and savings behavior. The Quarterly Journal of Economics, 116(4), 1149-1187. https://doi.org/10.1162/003355301753265543
Song, Z., & Baicker, K. (2019). Effect of a workplace wellness program on employee health and economic outcomes: A randomized clinical trial. JAMA, 321(15), 1491-1501. https://doi.org/10.1001/jama.2019.3307
What the OL 620 Module 6 instructions ask for
The sixth OL 620 discussion asks students to examine employee benefits as part of total rewards, often by evaluating a proposed change in health, retirement, wellness or work-life benefits. Expect to describe the proposal, weigh its costs and expected benefits using research and recommend whether and how to adopt it. Graduate posts should be skeptical of vendor claims and look for rigorous evidence, such as randomized trials, where it exists. It helps to consider what the workforce actually values and how plan design, including defaults, shapes behavior. Replies should ask classmates what evidence their employers used when adding or dropping a benefit.
How this OL 620 Module 6 discussion example is built
The sample considers two proposals at Prairie Junction Cooperative, an imagined southern Minnesota farm co-op with about 640 employees and two legacy benefits packages. An insurance broker proposes a $180,000-a-year wellness program with screenings, coaching and incentives, promising a three-to-one return in lower health costs. The co-op is also considering automatic enrollment in its 401(k) plan, which only 58 percent of employees now join. Song and Baicker's randomized trial at 160 worksites, Madrian and Shea's study of automatic enrollment and Dulebohn and colleagues' review of benefits research support a recommendation to adopt automatic enrollment with a default that rises each year and to decline the wellness program in favor of lower out-of-pocket costs for preventive care. The post asks classmates which benefit their employees value most.
Where the OL 620 Module 6 rubric puts the points
For the sixth OL 620 discussion, instructors generally look for a clear description of the benefits decision, accurate use of rigorous evidence, attention to plan design and defaults, consideration of costs and what employees value, a reasoned recommendation and replies that probe classmates' evidence. The strongest OL 620 posts distinguish what a vendor promises from what trials have found. Posts lose credit for accepting return-on-investment claims without evidence, for ignoring how defaults shape choices, for recommending benefits without regard to the workforce's needs or for replies that praise benefits in general. Graders also value posts that note limits of the evidence, such as short follow-up periods.
OL 620 Module 6 help: the mistakes that cost points
Describe the benefits decision and its cost. Find the strongest evidence available: randomized trials where they exist, careful observational studies otherwise, and be wary of vendor case studies. Consider how plan design affects behavior; defaults, matching formulas and enrollment processes often matter more than employees' stated intentions. Ask what your workforce values, using surveys or claims data if you have them. Weigh alternatives that might achieve the same goal at lower cost. Make a recommendation, including how you will measure results. Note the limits of the evidence. Close by asking OL 620 classmates which benefit their employees value most, and in replies ask how they know.
Get OL 620 Module 6 written to your instructions
Paste the OL 620 Module 6 prompt and the benefits decision your organization faces. We weigh the options against research on wellness programs, retirement plan design, health plans or whatever benefit is in question, make a recommendation suited to your workforce and close with a question for OL 620 classmates about what employees value. The first benefits post is free, back in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 620 papers and related MS Organizational Leadership samples
- OL 620 Module 1 Discussion: Compensation Philosophy
- OL 620 Module 2 Job Evaluation Assignment: Job Analysis and Job Evaluation
- OL 620 Module 3 Milestone One: Compensation Philosophy and Pay Structure
- OL 620 Module 4 Discussion: Pay Transparency
- OL 620 Module 5 Milestone Two: Incentives and Pay for Performance
- OL 620 Module 7 Milestone Three: Benefits Strategy and Total Rewards Communication
- OL 620 Module 8 Discussion: Pay Equity
- OL 620 Module 9 Final Project: Total Rewards Strategy
- OL 620 Module 10 Discussion: The Limits of Money in Total Rewards
- MKT 668 Module 5 Service Recovery Assignment: Service Failure and Recovery
- HRM 630 Module 7 Statistical Process Control Assignment: A Control Chart on Missed Visits
- OL 500 Module 5 Discussion: Participation and Empowerment
- ACC 646 Module 4 Discussion: Why a Trusted Superintendent Would Steal
OL 620 Module 6 questions, answered
Where can I find a free OL 620 Module 6 Discussion sample?
The full OL 620 Module 6 post is on this page: a farm cooperative weighs a wellness program pitch and automatic retirement enrollment using research.
Do workplace wellness programs save money?
A randomized trial at 160 worksites found a typical program changed some self-reported behaviors but did not improve health measures, medical spending or absenteeism over 18 months.
Does automatic enrollment increase 401(k) participation?
Yes. A well-known study found participation rose sharply under automatic enrollment, though many employees stayed at the default contribution rate and investment.
How should employers evaluate a benefits proposal?
Look for rigorous evidence, estimate costs and expected effects, consider what employees value and how plan design shapes choices, and plan to measure results.
What is an escalating default in a retirement plan?
An automatic enrollment design in which the default contribution rate rises each year, unless the employee opts out, to help savings grow over time.