| Course | MKT 668 Services Marketing |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment analyzing one service failure and designing a recovery response and a recovery system based on research on justice and complaint handling |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 668 Module 5
A Torn Ear in Play Group Three: Recovery for Biscuit and a Recovery System for Foothills Dog Lodge
[Student Name]
Southern New Hampshire University
MKT 668: Services Marketing
Service Recovery Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
A Torn Ear in Play Group Three: Recovery for Biscuit and a Recovery System for Foothills Dog Lodge
Introduction
Most service failures at Foothills Dog Lodge are small: a dog sent home muddy, a billing error, a long line. A dog injury is different, because it touches what owners trust the lodge with most. This assignment examines one such failure, the lodge's response and why it fell short, and then designs a recovery for this case and a system for the future. Injuries in group play are uncommon but not rare: the four lodges logged 61 minor incidents last year, about one per 1,800 dog-days.
The Failure
Biscuit, a three-year-old beagle, has attended the Nampa lodge twice a week for a year. One afternoon a larger dog grabbed his ear during play, leaving a small tear. The handler separated the dogs, cleaned the wound and put Biscuit in a quiet room. She wrote "ear scrape" on the paper feeding sheet. No one called his owner, Renee. At pickup, the evening clerk handed Biscuit over; Renee saw dried blood on his ear and asked what happened, and the clerk said she did not know. Renee took Biscuit to her veterinarian that evening, where the tear was cleaned again and glued, at a cost of $186.
The Lodge's Response
Renee posted a one-star review that night. Two days later the lodge manager emailed an apology, said the incident had been "a normal part of group play" and refunded the $38 day. The veterinary bill was not mentioned. Renee replied asking which dog was involved and whether it would be in Biscuit's group again; the manager did not answer for a week.
Why It Failed
Tax et al. (1998) found that customers judge complaint handling on three kinds of justice: the outcome they receive, the procedures used to reach it and the way people treat them along the way, and that most of the complaining customers they studied were unhappy with how their complaint had been handled. They also found that good prior experiences only partly cushioned a poorly handled complaint, which matters for a customer of one year. The lodge's response failed on all three. The outcome, $38, was smaller than Renee's own cost and did not cover the bill. The procedure failed at every step: she was not told when it happened, the clerk had no information and the follow-up took two days, with her question ignored for a week. The treatment, calling an injury "a normal part of group play," dismissed her concern.
Smith et al. (1999), testing failure and recovery scenarios with restaurant and hotel customers, found people preferred recovery resources that matched the kind of failure they had suffered, in amounts that matched its size. Biscuit's injury was a failure of care and of communication. Money matters, but what Renee most lacked was information and assurance that the lodge took her dog's safety seriously. A refund answers the wrong failure.
What Should Have Happened
A recovery matched to the failure
| Time | Action | Who | Kind of justice |
|---|---|---|---|
| Within 15 minutes | Call Renee: what happened, how Biscuit is, what was done | Lodge manager | Procedure, treatment |
| At the call | Offer to pay for a veterinary visit; offer to bring Biscuit to the vet or have Renee collect him | Lodge manager | Outcome |
| At pickup | Manager meets Renee in person, with the incident report | Lodge manager | Treatment |
| Within 2 days | Pay the veterinary bill; refund the day; explain what changes in play group assignment | Lodge manager | Outcome, procedure |
| Within 1 week | Follow-up call to ask about Biscuit; offer a free assessment to place him in a better group | Handler and manager | Treatment |
The cost of this response, about $260, is far less than losing a customer worth roughly $3,900 a year, and less than the cost of the review.
The Recovery System
An incident protocol sets four levels, from a minor scrape to an injury needing a veterinarian, each with a required action and time limit. Any injury requires a call to the owner within 15 minutes and an entry in the incident record on the shared tablet, which pickup staff see. Lodge managers may pay veterinary bills up to $500 and offer credits without approval. Every incident is recorded with the dogs involved, the group, the handler's dog count and the time. Once a month the operations director reviews all incidents across the four lodges for patterns, such as groups that are too large or dogs that should not be grouped together, and changes assignments.
Second Failures
Maxham and Netemeyer (2002), following complaining customers over 20 months during which they experienced two failures, found that a good recovery after one failure could leave customers more satisfied than before, but that this effect did not appear after a second failure, and that two poor recoveries in a row did lasting damage. The lodge must therefore treat any customer who has had one incident as a priority: their dog's profile is flagged, their group is reviewed and any second incident triggers a call from the operations director.
Conclusion
Training and Authority
A protocol works only if the people on shift can carry it out. Handlers will be trained to treat minor wounds, record them on the tablet and alert the manager at once, and evening clerks will be trained to read the incident record before every pickup so no owner hears about an injury from the dog. Managers will practice the first call in short role plays each quarter, because tone matters as much as content: the owner should hear concern, facts and a plan, in that order. Giving managers authority to pay bills and offer credits without approval removes the delay that turned Biscuit's case from an accident into a grievance. The lodge will also stop describing injuries as normal in any message to owners. Incidents can be uncommon and still deserve a full explanation.
Conclusion
Biscuit's injury was a small wound and a large failure of communication. The recovery system makes sure owners hear about incidents from the lodge, quickly and from someone who knows, and that each incident teaches the business something.
References
Maxham, J. G., & Netemeyer, R. G. (2002). A longitudinal study of complaining customers' evaluations of multiple service failures and recovery efforts. Journal of Marketing, 66(4), 57-71. https://doi.org/10.1509/jmkg.66.4.57.18512
Smith, A. K., Bolton, R. N., & Wagner, J. (1999). A model of customer satisfaction with service encounters involving failure and recovery. Journal of Marketing Research, 36(3), 356-372. https://doi.org/10.1177/002224379903600305
Tax, S. S., Brown, S. W., & Chandrashekaran, M. (1998). Customer evaluations of service complaint experiences: Implications for relationship marketing. Journal of Marketing, 62(2), 60-76. https://doi.org/10.1177/002224299806200205
What the MKT 668 Module 5 instructions ask for
The Module 5 assignment in MKT 668 commonly asks you to analyze a service failure and design a recovery. Expect to describe the failure, evaluate how the business responded, explain customers' reactions using concepts such as distributive, procedural and interactional justice and propose both an immediate recovery and a lasting recovery system. A strong assignment fits the recovery to the kind and severity of the failure rather than defaulting to a refund, addresses how quickly and by whom the customer is contacted, explains what front-line employees may do on their own and includes a way to learn from failures so they recur less often. Price the recovery and compare it with the value of the customer at risk.
How this MKT 668 Module 5 service recovery assignment example is built
The sample examines a failure at the composite Foothills Dog Lodge. Biscuit, a three-year-old beagle, suffered a small tear to his ear during afternoon play. The handler cleaned it but no one called his owner, Renee, who learned at pickup from a clerk who could not say what had happened. The lodge later refunded the $38 day and sent an apology email. The paper shows why that response failed on outcome, procedure and treatment, proposes what should have happened and builds a recovery system: an incident protocol, authority for managers to act, tracking of every incident and a monthly review. Smith, Bolton and Wagner, Tax, Brown and Chandrashekaran and Maxham and Netemeyer support it. It also plans for second failures, where research shows recoveries lose their effect.
Where the MKT 668 Module 5 rubric puts the points
Recovery assignments in MKT 668 are generally assessed on a clear account of the failure, a sound evaluation of the response using justice concepts, a recovery matched to the failure, a recovery system with protocols, authority and learning, use of research and writing quality. Excellent work considers the customer's emotions and the relationship as well as the money. Submissions lose credit for proposing a bigger refund as the whole answer, ignoring how and when the customer was told, giving front-line staff no authority or offering no way to prevent the next failure. A timeline with owners for each recovery step shows the plan can work in practice.
MKT 668 Module 5 help: the mistakes that cost points
Describe the failure from the customer's point of view: what happened, when they learned of it and how they were treated. Evaluate the response under three kinds of justice: what they received, how the process worked and how they were treated by people. Use research to explain why a response matched to the failure works better than a generic one. Write the recovery you would have offered, step by step. Then build a system: who acts, within what time, with what authority, how incidents are recorded and how the business learns. Note what happens if the same customer suffers a second failure. Write the first phone call word for word; it sets the tone for everything after.
Get MKT 668 Module 5 written to your instructions
Upload the MKT 668 Module 5 directions with details of the failure you are analyzing. We judge the response against the justice customers expect, design a recovery fitted to the failure and build a recovery system, with services research behind each step. Your first recovery paper is free and generally done in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 668 papers and related MS in Marketing samples
- MKT 668 Module 1 Discussion: What Makes a Service Different
- MKT 668 Module 2 Service Quality Gaps Assignment: Service Quality Gaps Analysis
- MKT 668 Module 3 Milestone One: Service Blueprint and Customer Journey
- MKT 668 Module 4 Discussion: The Servicescape and Physical Evidence
- MKT 668 Module 6 Milestone Two: Pricing and Managing Demand and Capacity
- MKT 668 Module 7 Discussion: Front-Line Employees and Service Climate
- MKT 668 Module 8 Customer Experience Measurement Assignment: Measuring Service Quality and Customer Experience
- MKT 668 Module 9 Discussion: Self-Service Technology in Services
- MKT 668 Module 10 Final Project: Services Marketing Plan
- ACC 610 Module 4 Discussion: Level 3 and the Limits of Fair Value
- BMB 655 Module 5 Catalog Valuation Assignment: What a 600-Song Catalog Is Worth
- ACC 693 Module 4 Discussion: Personal Phones, Private Email and the Employer's Reach
- ACC 550 Module 5 Milestone Two: An Activity-Based Model for Retail and Bulk Channels
MKT 668 Module 5 questions, answered
Where can I find a free MKT 668 Module 5 service recovery sample?
This page has the complete MKT 668 Module 5 assignment, analyzing a composite dog daycare's response to an injury and designing a recovery system.
What is service recovery?
The actions a business takes to respond to a service failure and restore the customer's satisfaction and trust.
What are the three kinds of justice in service recovery?
Distributive justice concerns the outcome received, procedural justice the process and timing and interactional justice how the customer is treated by people.
Is a refund enough to recover a service failure?
Often not; research found customers prefer recovery that matches the type and size of the failure, including an explanation and apology when the failure was about care or treatment.
What is the service recovery paradox?
The finding that a customer can feel better about a business after a well-handled failure than before it, which research suggests does not hold after a second failure.