| Course | OL 620 Total Rewards |
|---|---|
| Module | Module 9 |
| Paper type | graduate final project presenting a complete, costed total rewards strategy that integrates pay structure, incentives, benefits, equity and communication |
| Length | About 1,130 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 620 Module 9
One Cooperative, One Rewards System: A Total Rewards Strategy for Prairie Junction
[Student Name]
Southern New Hampshire University
OL 620: Total Rewards
Final Project: Total Rewards Strategy
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
One Cooperative, One Rewards System: A Total Rewards Strategy for Prairie Junction
Executive Summary
Today the co-op's 640 people are rewarded under two incompatible sets of rules, one from each legacy co-op. This strategy replaces them with one: market-based pay on a single job ladder, variable pay that rewards safe, accurate crew work and the co-op's results, one benefits package shaped by what employees value, corrected pay gaps and a commitment to explain pay openly. It adds about 4 percent of payroll in costs over three years, offset in part by savings in turnover, recruiting and benefits administration.
Revisions From Feedback
Instructor comments asked for clearer treatment of employees who lose under the new system, a test of whether the incentives could encourage unsafe work and a single cost table. The transition protections are now gathered in one section, the incentive guardrails have been tightened and costs appear in one three-year table.
Rewards Philosophy
Gerhart and Milkovich (1990) found that organizations facing similar markets made very different pay choices, especially in variable pay, and that those choices mattered for results. Prairie Junction's choice is to match the market median for most jobs, lead it for the scarce skills that keep grain moving, crops protected and homes heated, reward results through co-op-wide profit sharing and team incentives rather than individual competition and offer benefits employees value enough to stay for.
Base Pay
Seventy-two jobs sit in twelve grades built from a point-factor evaluation, with midpoints at the market median and range spreads widening from 30 to 50 percent. An 8 percent premium, revisited every second year, goes to the three scarce jobs. Employees below their new minimum rise to it over two years; employees above their maximum keep their pay and receive increases as lump sums. Trevor et al. (2012) found that pay differences among interdependent workers helped performance only when they were used to secure valued skills, which is why differences within grades are tied to certifications and steps rather than wide individual discretion.
Variable Pay
Profit sharing pays up to 5 percent of pay when local savings exceed 4 percent of sales. A harvest team incentive rewards elevator crews for bushels handled, grading accuracy and zero recordable injuries; applicators earn a season-end incentive for acres applied without misapplication complaints; propane drivers earn a quarterly bonus for safe, on-time service. Every incentive is canceled by a serious safety violation. Shaw and Gupta (2015), revisiting the evidence on financial incentives, argued that well-designed incentives improve performance more than skeptics claim and that failures usually reflect poor design rather than incentives as such. The design here keeps incentives modest, visible and tied to measures employees can influence.
Benefits
Employees choose between a $1,000-deductible plan and a high-deductible plan with a co-op-funded health savings account; preventive care is free under both. A single 401(k) enrolls employees automatically at 4 percent, rising to 8 percent, with a 100 percent match on the first 5 percent. Paid time off includes a seasonal bank so field staff can take time after harvest. Seasonal workers receive a limited medical plan and sick time, and employees earning under $55,000 receive a childcare stipend. Older former Blue Earth staff get an extra 2 percent retirement deposit for three years.
Equity and Transparency
The first audit found women earning about 6 percent less than men within the same grades after legitimate factors were considered. Unexplained gaps are being corrected, starting pay is now set by position in range and HR reviews raise recommendations before approval. Pay ranges for every grade are published internally once the transition removes below-minimum pay, and every employee receives an annual total rewards statement. Williams et al. (2006) showed that pay satisfaction rests largely on comparison, against peers and against effort given, and that pay satisfaction was linked to commitment and intentions to leave, which is why perceived fairness is part of the design.
Three-Year Cost
Added cost above current spending
| Element | Year 1 | Year 2 | Year 3 |
|---|---|---|---|
| Raising pay to new minimums and market premiums | $610,000 | $820,000 | $830,000 |
| Team and safety incentives | $227,000 | $230,000 | $235,000 |
| Performance steps (above current raises) | $120,000 | $125,000 | $130,000 |
| Benefits package net change | $600,000 | $470,000 | $350,000 |
| Pay equity corrections | $145,000 | $20,000 | $20,000 |
| Communication and administration | $60,000 | $35,000 | $35,000 |
| Total | $1,762,000 | $1,700,000 | $1,600,000 |
Over three years the strategy adds about $5.1 million, roughly 4.4 percent of payroll a year. Profit sharing is excluded because it is paid only from savings above the threshold. Expected offsets include lower turnover in the highest-turnover jobs, worth an estimated $250,000 a year once turnover targets are met, and about $310,000 a year from one benefits carrier and dropping the wellness program, already netted in the benefits line.
Compliance Summary
Exempt classifications were reviewed under the FLSA and location assistant managers reclassified as nonexempt; nondiscretionary incentives are included in overtime calculations. Pay is audited under the Equal Pay Act and Title VII. Job postings carry pay ranges and benefits descriptions under Minnesota law. Retirement and medical plans meet ERISA requirements, the medical offering satisfies the ACA employer requirements and COBRA, FMLA and HIPAA obligations are built into administration.
Measures
Total rewards measures
| Measure | Baseline | Year 3 target |
|---|---|---|
| Applicator and CDL driver turnover | 28% and 24% | 15% each |
| Employees below range minimum | 112 | 0 |
| Unexplained within-grade pay gap by sex | 6% | Under 1% |
| 401(k) participation | 58% | 85% |
| Employees satisfied with pay (survey) | 41% | 60% |
| Employees who understand their total rewards (survey) | 29% | 70% |
Rollout Sequence
The changes arrive in an order chosen to build trust. Pay structure statements and below-minimum raises come first, in January, because they are good news for many and show the system is real. The benefits change follows at open enrollment in the fall, after nine months of explanation. Incentives start with the spring application season and the following harvest, so employees see the measures before any money depends on them. Pay ranges become visible internally once no one sits below minimum.
Risks
Poor harvests would reduce profit sharing just as the new structure raises fixed costs; the strategy therefore relies on profit sharing, not base pay, for most variable cost. Former Cottonwood employees above range maximums may leave as their raises slow; the co-op will monitor their turnover quarterly and offer paths to higher grades. And managers may resist losing discretion over raises; their training and the HR review process are designed to make the new rules routine.
Conclusion
Prairie Junction's members merged two cooperatives to be stronger together. Their employees have spent eighteen months wondering whether the merger was done to them or with them, and the rewards system is where that question gets its most concrete answer. This strategy gives their employees one rewards system that is competitive where it must be, fair everywhere and explained well enough that people can see what they earn.
References
Gerhart, B., & Milkovich, G. T. (1990). Organizational differences in managerial compensation and financial performance. Academy of Management Journal, 33(4), 663-691. https://doi.org/10.5465/256286
Shaw, J. D., & Gupta, N. (2015). Let the evidence speak again! Financial incentives are more effective than we thought. Human Resource Management Journal, 25(3), 281-293. https://doi.org/10.1111/1748-8583.12080
Trevor, C. O., Reilly, G., & Gerhart, B. (2012). Reconsidering pay dispersion's effect on the performance of interdependent work: Reconciling sorting and pay inequality. Academy of Management Journal, 55(3), 585-610. https://doi.org/10.5465/amj.2006.0127
Williams, M. L., McDaniel, M. A., & Nguyen, N. T. (2006). A meta-analysis of the antecedents and consequences of pay level satisfaction. Journal of Applied Psychology, 91(2), 392-413. https://doi.org/10.1037/0021-9010.91.2.392
What the OL 620 Module 9 instructions ask for
OL 620 ends with a capstone in which students merge three revised milestones into one total rewards strategy for the case organization. Expect to state a rewards philosophy tied to the organization's strategy and then present base pay, variable pay, benefits and other rewards as one system, with costs, legal compliance, communication and measures of success. Most guidelines also expect attention to internal equity and fairness, since a strategy that is competitive but inequitable will not hold. The strongest projects show how the parts reinforce each other, explain trade-offs between cost and competitiveness, address employees who lose something in the change and support recommendations with research and data.
How this OL 620 Module 9 final project example is built
The sample presents the strategy for Prairie Junction Cooperative, an imagined southern Minnesota farm co-op with about 640 employees formed by merging two co-ops. It states a philosophy of matching the market for most jobs and leading it for scarce ones, then sets out a twelve-grade pay structure with a market premium for applicators, CDL drivers and merchandisers and a transition in which no one's pay is cut, co-op profit sharing with harvest, applicator and propane incentives, one benefits package with a protected transition for older employees, pay equity corrections and process changes, published ranges and annual total rewards statements. A three-year cost of about 4 percent of payroll above current spending, a compliance summary, risks and measures complete it, with research on pay strategy, pay dispersion, pay satisfaction and incentives.
Where the OL 620 Module 9 rubric puts the points
Graders of the OL 620 capstone look for a rewards philosophy anchored in strategy, pay, incentives and benefits designed as one system, internal equity, legal compliance, a believable multiyear cost, communication, measures, use of milestone comments and research support. The best OL 620 strategies make trade-offs explicit and show who gains and who loses. Projects lose points when the milestones are stacked without integration, when costs are missing or unrealistic, when equity is treated as a footnote, when employees losing benefits are ignored or when communication is an afterthought. A capstone that shows its numbers year by year, rather than one lump estimate, reads as far more credible to the grader.
OL 620 Module 9 help: the mistakes that cost points
Revise each milestone using the grader's comments before combining them. Write the rewards philosophy first and test every later section against it. Present pay, incentives and benefits as one system, explaining how they work together. Total the cost by year, compare it with current spending and show where savings offset increases. Address equity: how internal fairness and pay gaps will be monitored and corrected. Summarize legal compliance in one place. Plan communication, including total rewards statements. Add measures with baselines and targets, and name the risks. Finally, read the whole strategy as an executive would, starting with the first page, and make sure it answers what it will cost and what it will achieve.
Get OL 620 Module 9 written to your instructions
Send the OL 620 capstone prompt, all three milestone drafts with grades and the case company details. We combine and revise them into one total rewards strategy: philosophy, pay structure and transition, incentives, benefits, equity, communication, a multiyear cost, compliance, risks and measures, with research behind the choices. The first OL 620 final project is free and ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 620 papers and related MS Organizational Leadership samples
- OL 620 Module 1 Discussion: Compensation Philosophy
- OL 620 Module 2 Job Evaluation Assignment: Job Analysis and Job Evaluation
- OL 620 Module 3 Milestone One: Compensation Philosophy and Pay Structure
- OL 620 Module 4 Discussion: Pay Transparency
- OL 620 Module 5 Milestone Two: Incentives and Pay for Performance
- OL 620 Module 6 Discussion: Employee Benefits Design
- OL 620 Module 7 Milestone Three: Benefits Strategy and Total Rewards Communication
- OL 620 Module 8 Discussion: Pay Equity
- OL 620 Module 10 Discussion: The Limits of Money in Total Rewards
- ACC 693 Module 8 Link Analysis Assignment: Connecting the Subcontractor to the Manager
- BMB 655 Module 2 Financial Statements Assignment: Reading a Publisher's Statements
- MGT 605 Module 4 Pricing Assignment: Labor, Equipment and Materials for Concrete
- MGT 630 Module 2 Rework Cost Analysis Assignment: What Rework Cost at Pejepscot Commons
OL 620 Module 9 questions, answered
Where can I find a free OL 620 Module 9 Final Project sample?
The complete OL 620 final project is on this page: a costed total rewards strategy for a farm cooperative formed by merger.
What is a total rewards strategy?
An integrated plan for all the rewards an organization offers, pay, incentives, benefits, recognition and development, tied to its strategy, costs and culture.
How do you cost a total rewards strategy?
Estimate each element's cost by year, including transition costs such as raising pay to new minimums, compare the total with current spending and show offsets.
How do you merge two compensation systems?
Build one job hierarchy and pay structure, place employees in it, raise those below minimum over time, avoid cutting pay for those above maximum and communicate the reasons.
Do financial incentives work?
Recent reviews conclude that well-designed financial incentives improve performance more than skeptics have claimed, with design and fit to the work determining results.