OL 620 Total Rewards sample papers, module by module

Reviewed by Portia Lambrick, MBA

OL 620 covers everything an employer gives in return for work, pay, incentives, benefits and the rest, and how to design it so it is fair, affordable, legal and worth something to the people who receive it. The samples follow one cooperative as it builds a single rewards system out of two.

OL 620 is SNHU’s Total Rewards course. It centers on total rewards: compensation philosophy and pay level strategy, job analysis and job evaluation, market pricing and pay structures, pay transparency, merit pay and incentives, team and plant-wide rewards, health and retirement benefits, wellness programs, communicating total rewards, pay equity and the Equal Pay Act, FLSA, ERISA and ACA compliance. Every module below opens a full sample paper or takes a free request for one; searches like "ol 620 module 3", "OL620 sample paper" and "OL 620 milestone example" land on this page.

What OL 620 is really about

OL 620 belongs to SNHU's graduate HR coursework in the MS Organizational Leadership and MBA human resources tracks. Credit goes to rewards decisions that start from strategy and the labor market, rest on sound job evaluation and market data, are tested for fairness and legal compliance and are explained to employees well enough that they value what they receive.

The samples follow Prairie Junction Cooperative, an invented farmer-owned cooperative in southern Minnesota with about 640 employees at 23 grain, agronomy, energy, feed and retail locations, formed 18 months ago by merging two older co-ops. The cooperative, its people and every rate and figure are illustrative.

What OL 620’s modules ask for

Across ten modules, OL 620 commonly asks for discussions on compensation philosophy, pay transparency, benefits choices, pay equity and the limits of money, an assignment on job evaluation, three milestones on a compensation structure, incentives and pay for performance and benefits with total rewards communication, and a final total rewards strategy.

Where students lose points in OL 620

OL 620 papers lose the most credit when pay decisions float free of market data and job evaluation, when incentives reward something other than what the business needs, when benefits are chosen without asking what employees value, when legal requirements under the FLSA, the Equal Pay Act, ERISA and the ACA are skipped and when nothing is costed.

The OL 620 drawers

Module 1

OL 620 Module 1 Discussion example

The opening OL 620 post asks what pay philosophy Prairie Junction Cooperative, a composite Minnesota farm co-op formed from two older co-ops, should adopt when one legacy co-op paid at the market median with rich benefits and the other paid about 8 percent above market with a lean health plan and profit sharing; it uses Gerhart and Milkovich's study of 200 firms showing that organizations differ far more in bonus and long-term incentive decisions than in base pay, Trevor, Reilly and Gerhart's finding that pay differences used to attract and keep valued people helped interdependent team performance while other differences did not and Gupta and Shaw's argument that compensation remains the neglected core of HR research, proposes matching the market for most jobs and leading it for applicators, CDL drivers and grain merchandisers, and asks classmates how their employers chose. Full sample paper, read it free.

Read the sample →
Module 2

OL 620 Module 2 Job Evaluation Assignment example

The second OL 620 assignment designs how Prairie Junction Cooperative will turn 180 job titles inherited from two merged co-ops into about 70 jobs ranked on one ladder: it plans job analysis using questionnaires, interviews and observation at grain, agronomy and propane sites, builds a point-factor plan with four compensable factors weighted for the co-op's work, applies it to eight benchmark jobs and shows the resulting grades, drawing on Morgeson and Campion on the ways self-presentation and mental shortcuts warp job data, Dierdorff and Wilson's meta-analysis showing incumbents give the least reliable ratings and Sanchez and Levine's review of how job analysis is shifting toward work analysis. Full sample paper, read it free.

Read the sample →
Module 3

OL 620 Module 3 Milestone One example

Milestone One builds Prairie Junction Cooperative's pay structure: a written compensation philosophy, a market analysis matching 40 benchmark jobs to agricultural and regional surveys, twelve grades from the job evaluation with midpoints at the market median and range spreads widening from 30 to 50 percent, a separate premium for three hard-to-fill jobs, and a two-year transition that raises 112 employees below minimum, freezes but does not cut 64 employees above maximum and costs about 1.6 percent of payroll, with FLSA exemption review and an Equal Pay Act check; it draws on Rynes, Weber and Milkovich's study of how market data and job evaluation drive pay decisions, Shaw's review of pay dispersion and Shaw, Gupta and Delery's finding that dispersion helps only with individual incentives and independent work. Full sample paper, read it free.

Read the sample →
Module 4

OL 620 Module 4 Discussion example

The fourth OL 620 post considers how Prairie Junction Cooperative, a composite Minnesota farm co-op, should respond to the state's requirement to post pay ranges in job ads at the same moment it is merging two pay systems that pay current employees differently for the same work; it uses Cullen's review showing that transparency between coworkers narrows gaps but can spark counterproductive comparisons and harder employer bargaining, Card, Mas, Moretti and Saez's experiment showing that University of California staff who found themselves below their peers' median turned unhappier and began job hunting and Bamberger and Belogolovsky's lab evidence that pay secrecy can hurt performance, argues for going beyond the legal minimum by publishing every grade's range internally once the transition is fair, and asks classmates how open their employers are. Full sample paper, read it free.

Read the sample →
Module 5

OL 620 Module 5 Milestone Two example

Milestone Two designs how Prairie Junction Cooperative will pay for performance: a co-op-wide profit-sharing pool funded at 5 percent of pay when local net savings exceed a threshold, a harvest team incentive for grain elevator crews based on bushels handled, grading accuracy and zero recordable injuries, a season-end applicator incentive based on acres applied without misapplication complaints, a propane driver safety and service bonus and a performance step within each pay range, with costs, FLSA regular-rate treatment and checks for unintended effects; it draws on Nyberg, Pieper and Trevor's five-year study linking merit and bonus pay to later performance, Garbers and Konradt's meta-analysis showing team incentives work best when shared equitably and Larkin, Pierce and Gino on the psychological costs of individual pay for performance. Full sample paper, read it free.

Read the sample →
Module 6

OL 620 Module 6 Discussion example

The sixth OL 620 post weighs two benefits ideas for Prairie Junction Cooperative, a composite Minnesota farm co-op merging two benefits packages: an insurance broker's pitch for a $180,000 wellness program promising lower health costs, and switching the retirement plan to automatic enrollment; it uses Song and Baicker's randomized trial at 160 worksites, which found a wellness program changed some self-reported behaviors but not health measures, spending or absenteeism over 18 months, Madrian and Shea's study showing automatic enrollment sharply raised 401(k) participation but left many employees at the default rate and Dulebohn and colleagues' review of benefits research, recommends adopting automatic enrollment with an escalating default and declining the wellness program, and asks classmates what benefit their employers offer that employees value most. Full sample paper, read it free.

Read the sample →
Module 7

OL 620 Module 7 Milestone Three example

Milestone Three combines Prairie Junction Cooperative's two legacy benefits packages into one: a choice of two medical plans, one with a health savings account seeded by the co-op, a single 401(k) with automatic enrollment and a 5 percent match, paid time off that works for harvest and planting seasons, a seasonal-worker benefits policy and work-life benefits chosen from an employee survey, costed against both legacy plans and checked against ERISA, the ACA employer mandate, COBRA, FMLA and HIPAA; it adds an annual total rewards statement and a communication plan for the change, drawing on Williams, McDaniel and Nguyen's meta-analysis of what drives pay level satisfaction, Lambert's study linking useful work-life benefits to citizenship behavior and Harris and Fink's model of how benefits shape attitudes and behavior. Full sample paper, read it free.

Read the sample →
Module 8

OL 620 Module 8 Discussion example

The eighth OL 620 post reports what Prairie Junction Cooperative's first pay equity audit found after the merger: women in office and agronomy roles earned about 6 percent less than men in the same grades after controlling for tenure and certifications, largely because of starting pay negotiated at hire and supervisors' discretionary raises at one legacy co-op; it uses Blau and Kahn's review of the U.S. gender wage gap, Castilla's evidence that equal ratings did not bring equal raises for women and minorities and his later field study in which accountability and transparency in pay decisions closed those gaps, recommends correcting unexplained gaps, setting starting pay by range position and reviewing raise decisions, and asks classmates how their employers audit pay. Full sample paper, read it free.

Read the sample →
Module 9

OL 620 Module 9 Final Project example

The OL 620 capstone turns three revised milestones into a single total rewards strategy for Prairie Junction Cooperative, a composite Minnesota farm co-op formed from two co-ops with incompatible pay systems: it states the rewards philosophy, the twelve-grade pay structure with premiums for scarce jobs and a no-cut transition, co-op profit sharing with team and safety incentives, a combined benefits package with a protected transition for older employees, pay equity corrections and process changes, transparency and total rewards statements, a three-year cost of about 4 percent of payroll above today, compliance, risks and measures; it draws on Gerhart and Milkovich on how organizations' pay choices differ, Trevor, Reilly and Gerhart on pay differences in interdependent work, Williams, McDaniel and Nguyen on pay level satisfaction and Shaw and Gupta's updated case that incentives work better than often assumed. Full sample paper, read it free.

Read the sample →
Module 10

OL 620 Module 10 Discussion example

The closing OL 620 post reflects on a term spent rebuilding Prairie Junction Cooperative's rewards system and on what money cannot buy, prompted by an exit interview with a skilled grain merchandiser who left for less pay; it uses Judge and colleagues' meta-analysis finding only a weak relationship between pay level and job satisfaction, Larkin, Pierce and Gino's argument that pay for performance carries psychological costs from comparison and overconfidence and Gupta and Shaw's case that compensation still deserves serious study, concludes that pay buys attention and fairness but not belonging or meaning, commits to two practices and asks classmates what kept them in a job when pay alone would not have. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a OL 620 sample the right way

Read the OL 620 milestones in order and the rewards system comes together piece by piece: first one job ladder and a pay structure tied to the market, then incentives that fit the work, then benefits employees actually value and a way to explain the whole package, so Module 9 can present one costed total rewards strategy. For OL 620 help with your own organization or case, send the guidelines; the first custom sample is free and normally ready in two days.

OL 620 questions, answered

What does OL 620 cover?

Total rewards: compensation philosophy, job evaluation, market pricing, pay structures, incentives, benefits, pay transparency, pay equity and the laws that govern pay and benefits.

What is the OL 620 final project?

A Module 9 total rewards strategy, assembled from the pay structure, incentive and benefits milestones, that sets pay, incentives and benefits, costs them and explains how they will be communicated.

Is Prairie Junction Cooperative a real co-op?

No. Prairie Junction and the two co-ops that formed it are inventions of these OL 620 samples; its employees, pay rates and benefits are illustrative.