MKT 620 Module 5 Motivation and Attitudes Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 620 Module 5 Motivation and Attitudes sample analyzes what drives consumers toward a purchase, what attitudes they hold and why their intentions do not always become behavior. SNHU MKT 620 (MKT-620) has MS in Marketing students apply motivation and attitude research to the segment they are studying. The segment is intenders at Red Dirt Safe Rooms, a composite Oklahoma safe room maker: homeowners who want a safe room and have not bought one. Survey data on 112 intenders show strong protective motives and positive attitudes, but weak confidence about cost, choice and installation. Research on fear, efficacy and intentions explains why marketing should build confidence rather than fear.

CourseMKT 620 Consumer Behavior and Marketing
ModuleModule 5
Paper typegraduate assignment analyzing the motives and attitudes behind a purchase and the gap between intention and action
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 620 Module 5

1

Fear, Efficacy and the Intention That Fades: Motivation and Attitudes Among Safe Room Intenders

[Student Name]

Southern New Hampshire University

MKT 620: Consumer Behavior and Marketing

Motivation and Attitudes Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe survey of intenders and every figure are composites written for this assignment.
2

Fear, Efficacy and the Intention That Fades: Motivation and Attitudes Among Safe Room Intenders

Introduction

Milestone One identified intenders, homeowners who want a safe room and have priced or requested a quote but not bought, as the segment with the most to gain. This assignment examines why they stall. It analyzes their motives, their attitudes toward safe rooms and toward buying one now and the gap between their intentions and their behavior, using the 112 intenders among the 610 survey respondents and follow-up phone interviews with 15 of them.

What this page is doingDefines the segment and the question.
3

Motives

Asked why they wanted a safe room, intenders gave answers that clustered around three motives. The strongest, named by 84 percent, was protecting children or an older parent. Many described a specific person: a toddler who must be carried, a father who uses a walker. The second, named by 61 percent, was ending the scramble during warnings at night, deciding whether this one is serious, gathering everyone, waiting in a bathroom with a mattress over the tub. The third, named by 33 percent, was peace of mind in general, being able to sleep through a storm watch.

These are deep motives. They are about responsibility for others and about control during a frightening event, and they do not fade between storms in the way attention does. That suggests intenders do not need to be given a reason to want a safe room; they already have one.

What this page is doingDescribes what intenders want.
4

Attitudes

Attitudes among intenders (n = 112), share agreeing

StatementAgree
A safe room would protect my family in a direct hit89%
I would feel calmer during storm season with a safe room86%
I plan to buy a safe room within the next two years71%
I know which type of safe room is right for my home34%
I could pay for a safe room without straining our budget29%
I know how long installation takes and how to arrange it22%
My spouse or partner agrees we should buy one now41%

The table shows the shape of the problem. Beliefs about safe rooms and feelings about them are strongly positive, and stated intentions are high. Confidence about the practical side of buying is low: only about a third know which type is right, fewer than a third feel they can pay without strain and barely a fifth understand installation. Fewer than half say their partner agrees on buying now.

What this page is doingSeparates beliefs, feelings and intentions.
5

Fear and Efficacy

Witte and Allen (2000), in a meta-analysis of fear appeal research, found that strong fear appeals produced the most change when combined with high-efficacy messages, those that made the recommended response seem effective and achievable, and that fear without efficacy could lead to defensive responses such as avoidance. Intenders already have enough fear; 89 percent believe a safe room would protect them in a direct hit. What they lack is efficacy of a particular kind: not doubt that safe rooms work, but doubt that they can choose, afford and arrange one.

Bubeck et al. (2012) reached a similar conclusion in reviewing research on flood mitigation by households: the expected link between risk perception and protective behavior was weak in most studies, and protection motivation theory suggests that coping appraisal, the belief that a measure is effective, affordable and within one's ability, is needed alongside risk perception. Intenders fit that pattern exactly.

What this page is doingExplains why more fear will not help.
6

Intention and Behavior

Webb and Sheeran (2006) pooled 47 experiments that first moved people's intentions and then watched what they did; intentions moved by an effect size of 0.66, yet the behavior that followed moved by just 0.36. Among the reasons were the difficulty of the behavior and the lack of a specific plan. A $5,000 purchase that requires choosing among options, arranging financing and scheduling installation weeks away is exactly the kind of behavior where intentions leak.

The interviews put human detail on the numbers. Several intenders said they had decided many times. One mother said, "Every April I say this is the year." What was missing was not a decision but a path: a clear recommendation for their house, a monthly figure and a date on the calendar.

What this page is doingExplains why plans do not become purchases.
7

Recommendations

The analysis points to three marketing changes, all aimed at confidence rather than motivation. First, replace the general brochure with a five-minute home assessment, by video call or visit, that ends with a single recommended model and the reason for it. Second, quote every safe room as both a total price and a monthly payment, and offer a fixed installation date with the quote. Third, invite both partners to the assessment and give them a one-page summary to discuss. None of these adds fear. Each removes a reason to wait.

What this page is doingTargets the weakest component.
8

The Role of Price in the Attitude Gap

Of all the weak attitude items, affordability has the most room to move. Fewer than a third of intenders said they could pay for a safe room without straining the budget, yet the median household income among them was above $70,000, and most had made purchases of similar size, such as a used car or a new heating system, in the past few years. The difference is how the expense is framed. A furnace replacement is unavoidable and comes with financing at the store; a safe room is optional and arrives as a single price on a quote. In the interviews, three intenders who said a safe room was unaffordable described it as "five thousand dollars," while two buyers who had financed theirs described it as "about ninety a month." The product and the households were similar; the frame was not. A monthly figure, a payment that starts after installation and the option to apply a tax refund or a state rebate if one is available all change how affordable the purchase feels, without changing what it costs.

What this page is doingLooks closer at affordability.
9

Caution

The attitudes come from a survey of people who responded, who may be more motivated than intenders in general, and intentions in a survey are cheap to state. The recommendations should be tested, for example by offering the home assessment to a random half of last year's quote requests and comparing purchases over six months.

What this page is doingNotes what this analysis cannot show.
10

References

Bubeck, P., Botzen, W. J. W., & Aerts, J. C. J. H. (2012). A review of risk perceptions and other factors that influence flood mitigation behavior. Risk Analysis, 32(9), 1481-1495. https://doi.org/10.1111/j.1539-6924.2011.01783.x

Webb, T. L., & Sheeran, P. (2006). Does changing behavioral intentions engender behavior change? A meta-analysis of the experimental evidence. Psychological Bulletin, 132(2), 249-268. https://doi.org/10.1037/0033-2909.132.2.249

Witte, K., & Allen, M. (2000). A meta-analysis of fear appeals: Implications for effective public health campaigns. Health Education & Behavior, 27(5), 591-615. https://doi.org/10.1177/109019810002700506

What the MKT 620 Module 5 instructions ask for

The Module 5 assignment in MKT 620 usually asks you to analyze consumer motivation and attitudes for your product: what needs and goals drive consumers, what they believe and feel about the product, and how attitudes relate to behavior. Expect to apply a motivation framework, describe the components of attitudes such as beliefs, feelings and intentions, and explain how marketing could strengthen or change them. A strong assignment uses evidence about the consumers, separates attitudes toward the product from attitudes toward acting, and explains why positive attitudes may not lead to purchase. It ends with marketing recommendations aimed at the specific component that is weakest.

How this MKT 620 Module 5 motivation and attitudes assignment example is built

The sample analyzes 112 intenders from the Red Dirt Safe Rooms survey, homeowners who want a safe room but have not bought one. Their motives center on protecting children and older parents and on ending the 2 a.m. scramble to an interior bathroom. Their attitudes toward safe rooms are strongly positive, but confidence about cost, choosing the right model and getting it installed is weak. Witte and Allen's fear appeal meta-analysis, Bubeck, Botzen and Aerts's review of protective behavior and Webb and Sheeran's meta-analysis of intention and behavior explain the stall. The assignment recommends marketing that builds confidence and makes action easy, not marketing that adds fear.

Where the MKT 620 Module 5 rubric puts the points

Motivation and attitude assignments in MKT 620 are generally scored on the identification of relevant motives, analysis of attitude components, explanation of the attitude-behavior gap, use of consumer evidence and research, and recommendations aimed at the weakest component, along with writing. Strong papers measure or describe each component separately, show which one blocks action and link the recommendation to it. Papers lose marks for listing motives from a textbook hierarchy without evidence, treating positive attitudes as proof of future purchase, recommending more persuasion when consumers are already persuaded or ignoring the role of perceived ability to act. Separating belief in the product from confidence in buying it shows real insight, especially when the evidence shows which one is weaker.

MKT 620 Module 5 help: the mistakes that cost points

Start with evidence about what your consumers want and why, from interviews, surveys or reviews. Describe their motives in their own terms, not only with a textbook label. Break attitudes into beliefs, feelings and intentions, and look separately at attitudes toward the product and toward taking action now. Identify the weakest component; often consumers like the product but doubt they can afford, choose or arrange it. Use research on the link between intentions and behavior. Then recommend marketing that targets the weak point. Be wary of recommendations that add pressure, since anxious consumers often respond by avoiding the decision. A recommendation that can be tested on part of the market is stronger than one that must be adopted on faith.

Get MKT 620 Module 5 written to your instructions

Send the MKT 620 Module 5 instructions and the consumers you are analyzing. We identify their motives, measure their attitudes, explain why intentions do or do not become purchases and recommend how marketing should respond, using motivation and attitude research. The first assignment is written free of charge, usually inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 620 papers and related MS in Marketing samples

MKT 620 Module 5 questions, answered

Where can I find a free MKT 620 Module 5 motivation and attitudes sample?

The full MKT 620 Module 5 assignment on this page analyzes motives and attitudes of homeowners who want a tornado safe room but have not bought one.

What is the attitude-behavior gap?

The difference between what consumers say they believe or intend and what they actually do, often caused by cost, effort, timing or weak confidence in acting.

Do fear appeals work in marketing?

Research found fear appeals work best when paired with a strong sense that the recommended action is effective and easy; high fear with low efficacy can lead people to avoid the message.

Do intentions predict behavior?

Partly; experimental research found that a large increase in intentions led to only a small-to-medium increase in behavior, so intentions alone are an incomplete guide.

What is efficacy in consumer motivation?

The belief that an action will work and that one is able to carry it out, which research on protective behavior finds is often as important as the perceived threat.