| Course | MKT 620 Consumer Behavior and Marketing |
|---|---|
| Module | Module 6 |
| Paper type | graduate milestone analyzing reference groups, family decision making, word of mouth and cultural influences on the target consumers |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 620 Module 6
Neighbors, Spouses and the Church Parking Lot: Social Influences on Safe Room Buyers
[Student Name]
Southern New Hampshire University
MKT 620: Consumer Behavior and Marketing
Milestone Two: Social, Group and Cultural Influences
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Neighbors, Spouses and the Church Parking Lot: Social Influences on Safe Room Buyers
Introduction
The previous assignments showed that intenders at Red Dirt Safe Rooms want a safe room and stall on confidence and timing. But people do not make a $5,000 decision about their family's safety alone. This milestone examines the people and groups around them: neighbors, partners, churches, schools and teams, and the regional culture of living with tornadoes. It uses installation records mapped by street, the survey from Milestone One and 15 follow-up interviews with intenders.
Neighbors and Peer Effects
When the company's 9,000 installations are mapped by address, they are not scattered evenly. They cluster: on some streets, five or six of fifteen homes have one, while nearby streets have none. Among buyers in the past three years, 38 percent had at least one earlier Red Dirt installation within a quarter mile, compared with 17 percent of random addresses in the same ZIP codes.
Bollinger and Gillingham (2012), studying the spread of rooftop solar panels in California with a method designed to separate true peer influence from neighborhood similarity, found that at the average number of owner-occupied homes in a ZIP code, each additional installation raised the probability of another adoption in that ZIP code by 0.78 percentage points. Safe rooms are even more visible to neighbors than solar panels in one sense: they are installed by a crew with a truck in the driveway, and neighbors are invited to shelter in them during warnings. Several interviewees said a neighbor had offered them space in a safe room, and they felt awkward relying on someone else's.
Marketing response: offer recent buyers a simple neighbor open house, with their permission, and a modest thank-you for referrals, and target quiet-season outreach to streets near recent installs.
Partners and Family Decisions
In the survey, only 41 percent of intenders said their partner agreed they should buy now. In the interviews, disagreement took a consistent form. One partner, often the one who handled the children during warnings, pushed for a safe room; the other was unconvinced, either about the cost or about the need. Of the 15 interviewed intenders, 9 described this split, and none of those 9 had bought. Among the 12 recent buyers interviewed for Module 2, all but one said both partners agreed before signing.
Marketing response: invite both partners to the home assessment, address the unconvinced partner's specific concern, usually cost or whether an interior room is good enough, and leave a short written summary for the household to discuss.
Churches, Schools and Teams
Berger (2014) reviewed research showing that people share information to manage the impressions others have of them, regulate their own emotions, seek and give useful information, bond socially and persuade others, and that these motives shape what is shared and with whom. Safe rooms come up in conversation in particular settings: church fellowship after storm-season sermons, school pickup lines after a warning disrupted the night, youth baseball games in spring. Interviewees described these as places where they learned who had a shelter and what it was like.
Anderson (1998) found that both very satisfied and very dissatisfied customers talk more than others, in an asymmetric U-shape, with the dissatisfied somewhat more vocal than the satisfied, though by less than commonly assumed. A single bad installation story at a church supper can travel as far as several good ones, which makes post-installation service part of the company's reputation in these networks.
Marketing response: offer free safety talks for church and school groups on tornado preparedness in general, not sales pitches, and treat every complaint as a priority, with a named person who calls back the same day.
Regional Culture
Oklahoma has a deep culture of living with tornadoes. Many residents grew up watching storms from the porch, and some take quiet pride in not panicking. Four of the interviewed intenders, all men, said their partner's concern was understandable but that they themselves had never needed to shelter. That attitude is not ignorance; it is a cultural norm about toughness and experience. It blocks purchases when it belongs to the partner who controls the budget.
The norm also has a generational side. Younger parents in the survey were more likely than older homeowners to say they would rather shelter early than wait to see a storm, and several older interviewees said their own parents had never had anything but a storm cellar that flooded. Marketing response: avoid messages that imply fear or weakness. Frame the safe room as practical preparation, like a generator or a good roof, and feature buyers who share the region's matter-of-fact attitude toward storms.
How the Influences Combine
The influences rarely act alone. In the interviews, the clearest buying stories combined two or three of them. A mother who had pushed for a safe room for two springs finally persuaded her husband after a neighbor across the street had one installed and invited the family to shelter there during a night warning; sitting in someone else's safe room with their children, the husband said, made the decision for him. Another couple heard about safe rooms at church, saw one at a friend's house and bought after a storm warning disrupted their son's baseball tournament. Conversely, the stalled intenders often described a single influence pulling the other way: a partner who saw sheltering as overreaction, or a church friend whose installation had a leaking door.
These stories suggest that the company's best opportunity lies where influences overlap, on streets that already have installs, among families active in groups where shelters are discussed and in households where the hesitant partner can see a safe room in use rather than hear about one.
Which Influence Matters Most
Of the four influences, the household decision and the neighbor effect matter most. The first explains why intenders stall; the second offers a way to reach them through people they trust. The final plan should rely on both, and it should measure them: referral sources on every order and partner attendance at every assessment.
References
Anderson, E. W. (1998). Customer satisfaction and word of mouth. Journal of Service Research, 1(1), 5-17. https://doi.org/10.1177/109467059800100102
Berger, J. (2014). Word of mouth and interpersonal communication: A review and directions for future research. Journal of Consumer Psychology, 24(4), 586-607. https://doi.org/10.1016/j.jcps.2014.05.002
Bollinger, B., & Gillingham, K. (2012). Peer effects in the diffusion of solar photovoltaic panels. Marketing Science, 31(6), 900-912. https://doi.org/10.1287/mksc.1120.0727
What the MKT 620 Module 6 instructions ask for
Milestone Two in MKT 620 commonly asks you to analyze the social and cultural influences on your target consumers: reference groups, opinion leaders, family and household decision making, word of mouth, social class, subculture and culture. Expect to identify which influences matter most for your product, explain how they work using consumer research and say how marketers can respond. A strong milestone uses evidence of influence, such as clusters of purchases, interview accounts or reviews, rather than listing every type of influence in turn. It recognizes that influence can block purchases as well as encourage them and proposes marketing that works through trusted people rather than around them. Evidence from even a small number of interviews about who said what to whom makes the analysis concrete.
How this MKT 620 Module 6 milestone two example is built
The sample analyzes social influences on Red Dirt Safe Rooms' intenders. Installation records mapped by street show buyers clustering, with a new install raising the chance of another within a quarter mile. Interviews show that couples who disagree rarely buy, with one partner often treating sheltering as overreaction. Churches, schools and youth sports teams spread information, and a regional culture of pride in weathering storms works against sheltering for some. Bollinger and Gillingham's study of peer effects in solar panel adoption, Berger's review of word of mouth and Anderson's finding that unhappy customers talk more than happy ones explain the influences, and each ends with a marketing response.
Where the MKT 620 Module 6 rubric puts the points
The second MKT 620 milestone is usually graded on identification of the most relevant social and cultural influences, evidence that they operate, explanation with consumer research, attention to influences that block purchase, marketing implications and research and writing. Top submissions focus on a few influences with evidence, explain the mechanism and propose responses that respect how influence works in the community. Submissions lose credit for marching through every influence category without evidence, treating culture as demographics, ignoring family decision dynamics or proposing to manufacture influence in ways that would damage trust. Showing how influences interact, for example how a neighbor's install can tip a divided couple, strengthens the analysis.
MKT 620 Module 6 help: the mistakes that cost points
Choose the three or four influences that matter most for your consumers, and find evidence for each: purchase patterns, interview comments, reviews or survey answers. Explain how each works using research. Consider family and household roles: who starts the decision, who pays, who can veto. Look for influences that block purchase, such as group norms or cultural attitudes, not only ones that help. For each influence, propose a marketing response that works with trusted people and genuine conversation. Be careful with tactics such as paid testimonials, which can backfire if they seem staged. End by saying which influence the final plan should rely on most and why the evidence points there.
Get MKT 620 Module 6 written to your instructions
Upload the MKT 620 Milestone Two guidelines with your consumer profile. We analyze reference groups, family roles, word of mouth and cultural influences on your consumers with evidence and research, and turn each influence into a marketing response. Your opening Milestone Two is written at no cost and generally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 620 papers and related MS in Marketing samples
- MKT 620 Module 1 Discussion: Why Consumers Buy, and Why They Do Not
- MKT 620 Module 2 Consumer Decision Process Assignment: The Consumer Decision Process
- MKT 620 Module 3 Milestone One: Target Consumer Profile
- MKT 620 Module 4 Discussion: Perception and the Availability of Risk
- MKT 620 Module 5 Motivation and Attitudes Assignment: Consumer Motivation and Attitudes
- FIN 700 Module 8 Financing and Risk Assignment: Paying for the Deal and Testing a Bad Year
- MKT 555 Module 5 Content Evaluation Assignment: Constructing and Evaluating Social Media Content
- MGT 550 Module 1 Discussion: Why a Laundry Needs Managers Who Can Talk
- MKT 610 Module 4 Discussion: Choosing a Message Appeal
MKT 620 Module 6 questions, answered
Where can I find a free MKT 620 Module 6 Milestone Two sample?
This page carries the complete MKT 620 Milestone Two analyzing neighbor, family, church and cultural influences on tornado safe room buyers.
What are reference groups in consumer behavior?
Groups whose views and behavior consumers use as a guide, such as neighbors, coworkers, church members or friends, which can encourage or discourage a purchase.
What are peer effects in product adoption?
The tendency for people to adopt a product after others nearby have done so; research on solar panels found each additional installation in a ZIP code raised the chance of another.
How does family decision making affect big purchases?
Major household purchases often involve more than one person, and disagreement between partners can delay or block a purchase even when one is convinced.
Do unhappy customers talk more than happy ones?
Research found an asymmetric U-shape: very dissatisfied and very satisfied customers both talk more, with dissatisfied customers somewhat more vocal, though the gap is smaller than commonly assumed.