| Course | MKT 620 Consumer Behavior and Marketing |
|---|---|
| Module | Module 1 |
| Paper type | graduate discussion post on the gap between what consumers say they value and what they buy, applied to one product |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 620 Module 1
Module One Discussion
Everyone Wants One; Few Buy One
For this course I will study Red Dirt Safe Rooms, a composite family business in Norman, Oklahoma. Since 2003 it has installed about 9,000 steel safe rooms, which bolt to a garage floor, and below-ground shelters, priced from about $4,200 to $11,500, across Oklahoma, southern Kansas and north Texas. Its customers are homeowners in one of the most tornado-prone regions of the country.
In a short survey the company ran last spring, 78 percent of homeowners in its region agreed that a safe room is a smart thing to own, but only about one in eight said they had one. The sales record shows when the rest decide. In the month after a damaging tornado within about 60 miles, orders roughly triple. Within three or four months they are back to normal. The company's busiest years follow its worst storms.
Gallagher (2014), studying flood insurance across the United States, found that take-up spiked the year after a flood and then declined steadily back to its earlier level, and that even residents of nearby communities that did not flood bought more, at about a third of the rate. People learn from rare events, but they also forget. Safe rooms seem to follow the same curve.
Weinstein (1980) found that people judged negative events as less likely to happen to themselves than to others. Most homeowners can agree that tornadoes are dangerous and still believe theirs will not be the house that is hit. Slovic (1987) showed that ordinary people judge risk less by statistics than by how dreadful, uncontrollable and familiar a hazard feels. Tornadoes are dreadful but also familiar; living with spring warnings every year may make the threat feel routine.
If this is right, Red Dirt's job is not to convince people that safe rooms are good; they already believe it. Its job is to reach them in the quiet months, when the memory has faded and the decision feels optional.
Where have you seen consumers who clearly believe in a product still put off buying it, and what finally moved them?
References
Gallagher, J. (2014). Learning about an infrequent event: Evidence from flood insurance take-up in the United States. American Economic Journal: Applied Economics, 6(3), 206-233. https://doi.org/10.1257/app.6.3.206
Slovic, P. (1987). Perception of risk. Science, 236(4799), 280-285. https://doi.org/10.1126/science.3563507
Weinstein, N. D. (1980). Unrealistic optimism about future life events. Journal of Personality and Social Psychology, 39(5), 806-820. https://doi.org/10.1037/0022-3514.39.5.806
What the MKT 620 Module 1 instructions ask for
The first MKT 620 discussion usually asks why consumer behavior matters to marketers, often by introducing a product, brand or organization you will study and a puzzle about how its customers behave. Expect to describe the consumers, what they do and what they say, and to explain any gap with research rather than assumptions. Strong posts pick a specific, observable behavior, such as buying after an event or abandoning a purchase, and use one or two findings from consumer research to explain it. They avoid treating consumers as rational planners and avoid blaming them for being irrational. A short, concrete introduction of the product leaves room for analysis and for classmates to respond.
How this MKT 620 Module 1 discussion example is built
The sample introduces Red Dirt Safe Rooms, a composite Norman, Oklahoma, business that has installed about 9,000 steel safe rooms and shelters since 2003. In a survey of homeowners, most agree a safe room is a smart purchase, yet few own one, and orders triple in the month after a nearby tornado before falling back. Gallagher's study of flood insurance take-up after floods, Weinstein's work on unrealistic optimism and Slovic's research on risk perception explain the pattern. The post argues the company's problem is not persuading people a safe room is good but reaching them between storms, and it asks classmates where they have seen intention and purchase part ways.
Where the MKT 620 Module 1 rubric puts the points
Grading for the first consumer behavior discussion usually covers a clear behavioral puzzle, application of consumer research to explain it, insight into the specific consumers, implications for marketing and the replies. High-scoring posts describe what consumers actually do with figures where possible and use evidence to explain why. Posts lose credit when they describe the product at length without a behavior to explain, attribute the gap to consumers being lazy or uninformed without evidence, list theories without applying them or reply to classmates with agreement alone. A reply that offers a second explanation for a classmate's puzzle, with the evidence for it, adds the most to the thread.
MKT 620 Module 1 help: the mistakes that cost points
Choose a product whose consumers behave in a way that puzzles the marketer, such as wanting something but not buying it, or buying it only at certain times. Describe the behavior with any figures you have. Then use one to three research findings to explain why consumers act this way, and say what each implies for marketing. Avoid assuming consumers simply lack information; often they have it and act differently anyway. Keep the introduction short. Close by asking peers for a similar gap in their own markets, and in replies offer an explanation they have not considered. A reply that brings in a study the classmate did not use is more useful than one that restates theirs.
Get MKT 620 Module 1 written to your instructions
Paste the MKT 620 Module 1 prompt and the product or brand you will study. We explain the distance between what its consumers say and what they buy, using consumer research rather than common sense, and close by asking peers for the same kind of gap in their own markets. The first post is free and normally ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 620 papers and related MS in Marketing samples
- MKT 620 Module 2 Consumer Decision Process Assignment: The Consumer Decision Process
- MKT 620 Module 3 Milestone One: Target Consumer Profile
- FIN 685 Module 3 Milestone One: Measuring Coffee, Currency, Gas and Rate Exposure
- MGT 701 Module 4 Strategic Analysis Assignment: Internal and External Strategic Analysis
- HRM 630 Module 5 Milestone One: The Nine-Week Wait and Its Causes
- FIN 700 Module 7 Discussion: Should the Company Hedge Natural Gas for Its Kilns?
MKT 620 Module 1 questions, answered
Where can I find a free MKT 620 Module 1 Discussion sample?
The full MKT 620 Module 1 post on this page explains why homeowners who want a tornado safe room often wait until after a nearby storm to buy.
Why do consumers not buy products they say they want?
Common reasons include underestimating personal risk, putting off costly decisions, uncertainty about which option is best and the fading of concern when no recent event keeps it in mind.
What is unrealistic optimism in consumer behavior?
The tendency to believe bad events are less likely to happen to oneself than to others, which can reduce interest in protective products such as insurance or safety equipment.
Why do sales of protective products rise after disasters?
A recent event makes the risk vivid and easy to recall, so people judge it more likely; studies of flood insurance show purchases spike after floods and then decline over the following years.
How do people judge risk?
Research shows ordinary people judge risk by how dreadful, uncontrollable and familiar a hazard feels, not only by statistical probability.