Sixty-Three Days to a First Exam: Why New Patients Wait So Long in a Five-Clinic Dental Network
[Student Name]
Southern New Hampshire University
HRM 630: Topics in Health Administration
Milestone One: Problem Statement and Root Cause Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Sixty-Three Days to a First Exam: Why New Patients Wait So Long in a Five-Clinic Dental Network
Introduction
Ridgeline Community Dental Centers' earlier quality assessment and process analysis found two related problems: more than a quarter of appointments are missed, and a first visit for someone new to Ridgeline is roughly two months out. This milestone focuses on the wait, because it determines whether new patients enter care at all and because, as the analysis shows, missed appointments are one of its causes. The paper states the problem, presents data on its size and on who is most affected, analyzes causes with a fishbone diagram and five whys, considers the organizational context and sets an aim.
Problem Statement
In the last fiscal year, new patients at Ridgeline waited an average of 63 days from their first request to a comprehensive exam, and families preferring Swahili or Nepali waited 82 and 79 days. Community health centers in the region report waits of roughly three weeks for new dental patients. During the wait, about 22 percent of new patients who requested an appointment never had a first exam; some went to emergency departments for dental pain. Children who wait miss the window for sealants and fluoride.
Demand and Capacity
Ridgeline received an average of 120 requests a week for new-patient exams across its five clinics. Its scheduling template provides about 110 new-patient exam slots a week. With demand exceeding capacity by about ten a week, the backlog has grown steadily and stood at roughly 1,000 patients at year end, which at 110 exams a week equals the nine-week wait. Capacity looks short by only 9 percent, which suggests that small changes could tip the balance, provided they are the right ones.
Fishbone Analysis
A ninety-minute session with the dental director, two clinic managers, three schedulers, two hygienists and a community health worker produced a fishbone diagram with six branches. Methods: the template reserves 8 percent of slots for new patients; new-patient exams are 90 minutes while recall visits are 60; there is no wait list for cancellations. People: schedulers are measured on chair fill; dentists cover the school sealant program two mornings a week. Policies: recall patients are booked six months ahead at checkout. Technology: the practice management system cannot hold slots for a category of patient. Patients and environment: transportation and work schedules limit which times families can accept. Measurement: the wait for first exam is not tracked monthly. Each suspected cause was then checked against scheduling data.
Suspected causes tested against data
| Suspected cause | Evidence | Supported? |
|---|---|---|
| Too few dentists | Dentist hours unchanged in three years while wait doubled | Partly |
| Recall visits fill the template months ahead | 71 percent of hygiene and exam slots for the next six months already booked by recall patients | Yes |
| Missed new-patient slots not refilled | About 30 new-patient slots a week missed; fewer than 3 refilled | Yes |
| No wait list | No list exists; cancellations offered to whoever calls next | Yes |
| Families refuse offered times | 12 percent of offers declined | Minor |
| School program draws dentists away | 8 dentist mornings a month, planned in advance | Minor |
Five Whys
Why do new patients wait nine weeks? Because demand for new-patient exams exceeds the slots available. Why are there too few slots? Because the template reserves only 8 percent of capacity for new patients and most remaining slots are booked by recall patients. Why do recall patients hold so many slots? Because every patient leaving a cleaning is booked six months ahead by policy, whether or not they will keep the appointment. Why are lost slots not reused? Because no one calls unconfirmed patients, and there is no wait list of new patients to offer a cancellation to. Why has this persisted? Because the wait is not measured monthly and schedulers are rewarded for chair fill, which the current system already achieves on paper. The root causes, then, are a scheduling template and booking policy designed around existing patients, and the absence of a process to refill missed slots. Both are within Ridgeline's control. Neither requires hiring a dentist, which the board cannot fund this year; both require changing rules that staff have followed for so long that they look like facts of nature.
Context
Shortell et al. (1998) argued that continuous quality improvement in clinical settings produced limited results where organizations lacked a supportive culture, leadership commitment and the information systems to track progress, and that these conditions must be built alongside the improvement itself. Kaplan et al. (2010) sifted dozens of studies and concluded that projects tended to succeed where senior leaders backed them, the culture welcomed quality work, data systems could feed results back and clinicians took part. At Ridgeline, the dental director supports the project and the board has asked for access data, which helps. The practice management system's limits and schedulers' chair-fill incentive will hinder it. Kheirkhah et al. (2016) found that longer lead times between scheduling and the appointment were associated with higher no-show rates, which suggests that shortening the wait will also reduce missed visits, creating a reinforcing loop.
Stakeholders
Schedulers will carry most of the change and must help design it. Dentists and hygienists will see their templates altered. Recall patients may find fewer six-month slots available. The Medicaid managed care plans, which score Ridgeline on preventive visits, need to understand any shift toward new patients. And families waiting now, including those preferring Nepali and Swahili, should be represented through the parent advisory group. Their view matters for a practical reason: any new wait list will only work if families can be reached quickly in a language they read when a slot opens the next morning.
Aim Statement
Within twelve months, Ridgeline will reduce the average wait from first request to first exam from 63 to 21 days, with no language group waiting more than 28 days, while holding the share of recall patients seen within seven months at or above its current level.
Conclusion
The nine-week wait is not mainly a shortage of dentists. It results from a scheduling design that gives existing patients first claim on capacity and from the loss of about thirty new-patient slots a week to missed visits that no one refills. Milestone Two will design and test changes aimed at these causes.
References
Kaplan, H. C., Brady, P. W., Dritz, M. C., Hooper, D. K., Linam, W. M., Froehle, C. M., & Margolis, P. (2010). The influence of context on quality improvement success in health care: A systematic review of the literature. The Milbank Quarterly, 88(4), 500-559. https://doi.org/10.1111/j.1468-0009.2010.00611.x
Kheirkhah, P., Feng, Q., Travis, L. M., Tavakoli-Tabasi, S., & Sharafkhaneh, A. (2016). Prevalence, predictors and economic consequences of no-shows. BMC Health Services Research, 16, Article 13. https://doi.org/10.1186/s12913-015-1243-z
Shortell, S. M., Bennett, C. L., & Byck, G. R. (1998). Assessing the impact of continuous quality improvement on clinical practice: What it will take to accelerate progress. The Milbank Quarterly, 76(4), 593-624. https://doi.org/10.1111/1468-0009.00107
What the HRM 630 Module 5 instructions ask for
Milestone One in HRM 630 usually asks you to identify a quality problem in a health organization, describe its scope and impact, analyze its causes with quality tools and set a goal for improvement. Expect a problem statement, background data, analysis using tools such as a fishbone diagram, five whys or flowchart, discussion of stakeholders and context and an aim statement. A strong graduate milestone states the problem in measurable terms, shows how it differs across patient groups, distinguishes symptoms from root causes, uses data to test each suspected cause rather than listing every possibility, and writes an aim that is specific, measurable and time-bound.
How this HRM 630 Module 5 milestone one example is built
The sample states Ridgeline Community Dental Centers' problem as a 63-day average wait for a first exam, 82 days for Swahili-speaking families and 79 for Nepali speakers, against a community health center norm closer to three weeks. Demand and capacity data show about 120 new-patient requests a week against 110 exam slots, so the backlog grows. A fishbone diagram and five whys trace the gap to a scheduling template that reserves only 8 percent of slots for new patients, because recall visits are booked six months ahead, and to about 30 new-patient slots a week lost to missed visits that are never refilled. The aim is a 21-day wait within twelve months.
Where the HRM 630 Module 5 rubric puts the points
Milestone One rubrics commonly score the problem statement, supporting data, root cause analysis using quality tools, attention to stakeholders and context, the aim statement and writing with APA citations. Exemplary work states the problem with numbers, stratifies it by group, tests suspected causes against data, separates causes the organization controls from those it does not and sets an aim with a target and date. Papers lose points for vague problems such as poor access, for fishbone diagrams listing every possible cause without testing any, for root causes that blame patients or staff, for ignoring context and for aims with no number or deadline. A table showing which suspected causes the data supported, and which it did not, is a strong signal of analytical rigor.
HRM 630 Module 5 help: the mistakes that cost points
Write the problem as one sentence with a number, a group and a time period, such as the average wait for a first exam last year. Then show how it varies by group, since that often points to causes. Before drawing a fishbone, collect basic data, like weekly demand and capacity, which can rule causes in or out quickly. Use the fishbone to brainstorm, then the five whys to drill into the two or three causes the data support. Stop when you reach something the organization can change. Consider what in the organization's context will help or hinder change. Write an aim that names the measure, the target and the date.
Get HRM 630 Module 5 written to your instructions
Upload the HRM 630 Milestone One guidelines and the quality problem you have chosen. We state it with data, show who it affects most, dig under it with cause-and-effect tools, weigh the setting and write an aim with a number and a date. About two days; first milestones are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More HRM 630 papers and related MBA in Healthcare Management samples
- HRM 630 Module 1 Discussion: What Total Quality Means at a Dental Clinic
- HRM 630 Module 2 Quality Assessment Paper: Defining Quality for Sixteen Languages
- HRM 630 Module 3 Discussion: Who the Customers Really Are
- HRM 630 Module 4 Process Analysis Assignment: Mapping and Counting Missed Appointments
- HRM 630 Module 6 Discussion: Leading So Staff Speak Up
- HRM 630 Module 7 Statistical Process Control Assignment: A Control Chart on Missed Visits
- HRM 630 Module 8 Milestone Two: Three PDSA Tests and Their Measures
- HRM 630 Module 9 Discussion: Keeping the Gains
- HRM 630 Module 10 Final Project: The TQM Implementation Plan
- ACC 690 Module 8 Debt Modification Assignment: Amending the Term Loan After a Drought
- BMB 515 Module 8 Marketing and Retail Assignment: A Release Plan From Preorder to Vinyl
- ACC 646 Module 2 Fraud Tree Assignment: Sorting the Schemes a Tip Uncovered
- ACC 693 Module 8 Link Analysis Assignment: Connecting the Subcontractor to the Manager
HRM 630 Module 5 questions, answered
Where can I find a free HRM 630 Module 5 Milestone One sample?
The complete HRM 630 Module 5 Milestone One paper is on this page, analyzing the root causes of a nine-week wait for new dental patients.
What is a root cause analysis in health care quality?
A structured search for the underlying causes of a problem, using tools such as fishbone diagrams and five whys, so that fixes address causes rather than symptoms.
How do you write a problem statement for a quality project?
State what is wrong in measurable terms, for whom, where and over what period, with data on its size and impact, without proposing a solution.
What is the five whys technique?
Asking why a problem occurs, then why that cause occurs, about five times, until reaching a cause the organization can change.
What makes a good aim statement?
It names the measure, the target value, the population and the deadline, such as reducing the average wait for a first exam to 21 days within twelve months.