| Course | HRM 630 Topics in Health Administration |
|---|---|
| Module | Module 8 |
| Paper type | graduate milestone presenting PDSA improvement tests and a measurement plan |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA in Healthcare Management |
| Updated | October 2026 |
Free sample paper for HRM 630 Module 8
Small Tests, Real Numbers: Three PDSA Cycles on Missed Visits and Wait Times at Ridgeline Community Dental Centers
[Student Name]
Southern New Hampshire University
HRM 630: Topics in Health Administration
Milestone Two: Improvement Design and PDSA Tests
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Small Tests, Real Numbers: Three PDSA Cycles on Missed Visits and Wait Times at Ridgeline Community Dental Centers
Introduction
Milestone One set Ridgeline Community Dental Centers' aim: reduce the wait for a first exam from 63 to 21 days within twelve months, with no language group above 28 days. The process analysis and control chart showed that missed appointments, stable around 27 percent and near 40 percent for families preferring Nepali or Swahili, drive much of the lost capacity behind the wait. This milestone uses the Model for Improvement to design changes aimed at the root causes, reports three series of plan-do-study-act cycles, sets out the measurement plan and identifies which changes are ready to spread.
Model for Improvement
Langley et al. (2009) build improvement on three questions, about the result a team wants, the evidence that would prove a change helped and the changes most likely to help, and then on testing those changes in short PDSA loops. The answers here are the aim above; a family of measures described below; and three changes, each matched to a root cause found earlier: reminders patients cannot understand, slots lost to missed visits with no way to refill them, and failed transportation.
Measures
Measures for the improvement work
| Type | Measure | Baseline |
|---|---|---|
| Outcome | Average days from request to first exam, by language | 63 overall, 82 Swahili, 79 Nepali |
| Outcome | Weekly missed appointment rate, by language | 27 percent overall, about 40 percent Nepali and Swahili |
| Process | Reminders delivered in patient's preferred language | 61 percent |
| Process | Missed or canceled new-patient slots refilled | Fewer than 10 percent |
| Process | Rides booked at time of scheduling for patients needing one | Not tracked |
| Balancing | Recall visits completed by month seven | 78 percent |
| Balancing | Scheduler overtime hours per week | 6 |
| Balancing | Same-day emergency visits turned away | 4 per week |
Test 1: Language-Matched Reminders
Cycle 1 plan: for two weeks, send two-way text reminders, three days and one day before each appointment, in the patient's preferred language, for one hygienist's schedule at the clinic with the most Nepali-speaking patients, with a scheduler calling anyone who does not reply. Prediction: misses on that schedule fall from about 31 percent to 22 percent. Do and study: of 140 appointments, 27 were missed, 19 percent, better than predicted; the scheduler spent about forty minutes a day on calls. Translation of the Swahili message was flagged by two families as confusing. Act: adapt the Swahili text with the parent advisory group and expand. Cycle 2: the whole clinic for four weeks; misses fell from 29 to 20 percent, and replies came in fastest from Nepali-speaking families. Cycle 3: a second clinic with mostly Spanish and English speakers for four weeks; misses fell from 26 to 21 percent, a smaller gain, consistent with the larger language gap at the first clinic. Robotham et al. (2016) pooled trials of text and other digital prompts and showed attendance rising when patients received them, and these results fit that evidence.
Test 2: Held Slots and a Wait List
Cycle 1 plan: at a second clinic, hold 20 percent of new-patient exam slots for booking no more than fourteen days ahead, and keep a wait list of new patients willing to come on short notice, texting them in their language when a slot opens. Prediction: the wait for first exam at this clinic falls from 61 to about 45 days in eight weeks. Do and study: the wait fell to 34 days; 18 of an average 26 weekly missed or canceled new-patient slots were refilled from the list. Recall patients seen within seven months stayed at 79 percent. Act: adapt by moving two dentist mornings a month from recall to new-patient exams, and plan a second cycle at the busiest clinic, where demand is higher.
Test 3: Ride Booking at Scheduling
Plan: for four weeks at the first clinic, a community health worker books the patient's Medicaid transportation at the moment the appointment is made, for any family that says it needs a ride, and confirms the ride the day before. Prediction: ride-related misses fall by a third. Do and study: ride-related misses fell from 16 percent of all misses at that clinic to 7 percent, better than predicted, but the community health worker could cover only morning appointments. Act: adapt by training two schedulers to book rides and testing afternoon coverage. A second cycle will also check whether families who needed a ride once keep needing one, since several said they had a car most weeks and lost access only when a relative's shift changed; if so, the question at scheduling may need to become a quick check the day before instead.
What Was Learned
Each test performed at or above its prediction, but the gains were not equal across groups: reminders helped most where language barriers were greatest, which is the point. Taylor et al. (2014), examined published hospital and clinic projects calling themselves PDSA and showed that a large share strayed from the method, often skipping small iterative cycles, predictions or regular data collection. These tests were designed to avoid those failings by starting small, writing predictions and collecting weekly data. None of the balancing measures moved meaningfully, although scheduler call time rose and will need to be built into staffing.
Spread Plan
Language-matched reminders are ready to spread to all five clinics over the next two months, one clinic every two weeks, with the control chart showing whether the network's center line drops. Held slots and the wait list need one more cycle at the busiest clinic before spreading. Ride booking needs a staffing solution for afternoons. The control chart and stratified wait measure will be reviewed monthly by the improvement team. Each new clinic will run its own short first cycle rather than simply copying the procedure, because its language mix, phone habits and staffing differ, and the team expects the reminder wording and the wait list rules to need local adjustment.
Conclusion
Three small tests, each aimed at a cause found earlier, have produced measurable gains without harming recall care. Spreading them clinic by clinic, while watching the control chart and the wait for each language group, gives Ridgeline its best chance of meeting the 21-day aim.
References
Langley, G. J., Moen, R. D., Nolan, K. M., Nolan, T. W., Norman, C. L., & Provost, L. P. (2009). The improvement guide: A practical approach to enhancing organizational performance (2nd ed.). Jossey-Bass.
Robotham, D., Satkunanathan, S., Reynolds, J., Stahl, D., & Wykes, T. (2016). Using digital notifications to improve attendance in clinic: Systematic review and meta-analysis. BMJ Open, 6(10), Article e012116. https://doi.org/10.1136/bmjopen-2016-012116
Taylor, M. J., McNicholas, C., Nicolay, C., Darzi, A., Bell, D., & Reed, J. E. (2014). Systematic review of the application of the plan-do-study-act method to improve quality in healthcare. BMJ Quality & Safety, 23(4), 290-298. https://doi.org/10.1136/bmjqs-2013-001862
What the HRM 630 Module 8 instructions ask for
Milestone Two in HRM 630 usually asks you to design an improvement for the problem analyzed in Milestone One and explain how it will be tested and measured. Expect to state the aim, describe change ideas linked to root causes, plan one or more PDSA cycles, define measures and describe how results will be studied and decisions made about adopting, adapting or abandoning changes. A strong graduate milestone ties every change to a cause identified earlier, starts tests small, writes a prediction before each cycle, includes balancing measures that watch for harm elsewhere, reports results with numbers and uses the learning from one cycle to shape the next rather than treating PDSA as a single pilot.
How this HRM 630 Module 8 milestone two example is built
The sample runs three tests at Ridgeline Community Dental Centers. Two-way text reminders in each patient's preferred language began on one hygienist's schedule, cutting misses from 31 to 19 percent in two weeks, then spread clinic-wide, where the rate fell from 29 to 20 percent. Holding 20 percent of new-patient slots for booking within two weeks, plus a same-day text wait list for cancellations, cut the wait at a second clinic from 61 to 34 days in eight weeks. A community health worker booking Medicaid rides at scheduling halved ride-related misses. Balancing measures, such as recall visits within seven months and scheduler overtime, held steady. Each cycle records its prediction before the test, and the paper reports where results beat or missed it.
Where the HRM 630 Module 8 rubric puts the points
Milestone Two rubrics commonly score the aim, the link between changes and root causes, the design of PDSA cycles, the measurement plan, analysis of results, plans for spread and sustainability and APA style. Exemplary work starts small, writes predictions, uses outcome, process and balancing measures, reports what happened including surprises and adapts the next cycle accordingly. Papers lose points for changes not tied to causes, for one large pilot labeled PDSA, for missing predictions, for omitting balancing measures, for reporting only success and for spread plans that skip testing under different conditions. Reporting a test that disappointed, and what the team changed because of it, usually earns more credit than a string of successes.
HRM 630 Module 8 help: the mistakes that cost points
Write your aim at the top and list your root causes underneath, then put one change idea next to each cause. For each change, plan the smallest useful test, one provider or one day, and write down what you predict will happen before you start. Choose an outcome measure that matches your aim, a process measure that shows whether the change was actually done and a balancing measure that would show harm elsewhere. Report results in numbers, including what did not work. Use what you learned to plan the next cycle at a larger scale. Finish by saying which changes are ready to spread and what still needs testing.
Get HRM 630 Module 8 written to your instructions
Share the HRM 630 Milestone Two guidelines and your root cause findings. We turn causes into change ideas, write PDSA cycles with predictions, report results honestly, set outcome, process and balancing measures and say what is ready to spread. About two days; a first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More HRM 630 papers and related MBA in Healthcare Management samples
- HRM 630 Module 1 Discussion: What Total Quality Means at a Dental Clinic
- HRM 630 Module 2 Quality Assessment Paper: Defining Quality for Sixteen Languages
- HRM 630 Module 3 Discussion: Who the Customers Really Are
- HRM 630 Module 4 Process Analysis Assignment: Mapping and Counting Missed Appointments
- HRM 630 Module 5 Milestone One: The Nine-Week Wait and Its Causes
- HRM 630 Module 6 Discussion: Leading So Staff Speak Up
- HRM 630 Module 7 Statistical Process Control Assignment: A Control Chart on Missed Visits
- HRM 630 Module 9 Discussion: Keeping the Gains
- HRM 630 Module 10 Final Project: The TQM Implementation Plan
- ACC 640 Module 7 Discussion: Testing Every Order With Data Analytics
- ACC 691 Module 2 Revenue Schemes Assignment: Bill-and-Hold and a Stuffed Channel
- CSR 610 Module 8 Compliance Program Assignment: Building a Program That Works
- FIN 610 Module 10 Final Project: Rappahannock's Short-Term Financial Plan
HRM 630 Module 8 questions, answered
Where can I find a free HRM 630 Module 8 Milestone Two sample?
The full HRM 630 Module 8 Milestone Two paper is here on this page, with three PDSA tests on missed visits and wait times at a dental network.
What is a PDSA cycle?
Four linked steps for testing one change: write the test and what you expect, run it on a small scale, compare what happened with what you expected, then keep, modify or drop the change.
What is the Model for Improvement?
An approach from Langley and colleagues built on three questions, about the goal, the evidence that would show progress and the changes worth trying, followed by rapid small tests of those changes.
What is a balancing measure?
An indicator chosen to catch harm a change might cause somewhere else, for instance existing patients waiting longer for cleanings once new-patient slots are protected.
Why start PDSA tests small?
Small tests are quick, cheap and low risk, let teams learn and adjust before spreading, and build confidence that a change works in local conditions.