| Course | OL 640 Franchising |
|---|---|
| Module | Module 6 |
| Paper type | graduate discussion post on how a franchisor should select its first franchisees |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 640 Module 6
Module Six Discussion
Choosing the First Franchisees
Second Haul has received 23 inquiries for its first six Columbus territories. Two candidates sum up the choice. One is an investor with $1.2 million in liquid assets who owns two restaurant franchises and wants to hire a general manager. The other is a former roofing crew leader, a man in his late thirties with $95,000 in savings, a strong credit score and a plan to drive a truck himself for the first two years.
Jambulingam and Nevin (1999) examined how franchisors' selection criteria, including prospective franchisees' attitudes, experience and financial capability, related to outcomes franchisors care about, and found that some criteria predicted franchisee behaviors such as cooperation and less opportunistic conduct better than others. Clarkin and Swavely (2006), surveying franchisors, found that they weighed personal characteristics, such as work ethic and willingness to follow the system, alongside financial capability. Grace and Weaven (2011) found that franchisees' satisfaction with the relationship depended on the value they received from the franchise and the risk they perceived in their investment, which suggests that owners who invest a larger share of their own wealth will watch closely what the system delivers.
Our feasibility work showed that a franchised territory hits $650,000 in year two only when its owner spends the first year on a truck and builds local donation partnerships personally. An absentee owner paying a manager would erase most of the margin. That points to the roofing crew leader, provided he can finance the investment, which an SBA-backed loan could cover.
All candidates meet the same financial minimums: $75,000 in liquid assets and $250,000 in net worth. All commit to operating the business for the first two years. Finalists spend a paid day working a route in a company territory, and our crew leaders' view counts. Every candidate is scored on the same sheet, and the reasons for each decision are written down, which protects both fairness and the company.
Which of the two would you choose for Second Haul's first territory, and what would change your mind?
References
Clarkin, J. E., & Swavely, S. M. (2006). The importance of personal characteristics in franchisee selection. Journal of Retailing and Consumer Services, 13(2), 133-142. https://doi.org/10.1016/j.jretconser.2005.08.008
Grace, D., & Weaven, S. (2011). An empirical analysis of franchisee value-in-use, investment risk and relational satisfaction. Journal of Retailing, 87(3), 366-380. https://doi.org/10.1016/j.jretai.2010.06.001
Jambulingam, T., & Nevin, J. R. (1999). Influence of franchisee selection criteria on outcomes desired by the franchisor. Journal of Business Venturing, 14(4), 363-395. https://doi.org/10.1016/S0883-9026(98)00023-8
What the OL 640 Module 6 instructions ask for
In Module 6, OL 640 asks how franchisors should choose franchisees. Expect to identify the qualities a franchise system needs in its owners, propose criteria and a selection process and apply them to candidates, real or hypothetical. Posts that rely on research about selection and later franchisee behavior are stronger than those listing desirable traits. It helps to consider the fit between an owner's goals and the system's model, for example whether the system needs owner-operators or can work with investors who hire managers, and to remember that the first franchisees shape a young system's reputation. Fair, consistent criteria also matter legally. Replies should press classmates on which criterion they would bend for an otherwise strong candidate.
How this OL 640 Module 6 discussion example is built
The sample considers Second Haul Junk Removal, an imagined Pittsburgh franchisor choosing its first owners for Columbus. Among 23 inquiries are an investor with $1.2 million in liquid assets who wants to hire a general manager and a former roofing crew leader with $95,000 in savings who plans to run a truck himself. Jambulingam and Nevin's study of how selection criteria related to franchisee behavior, Clarkin and Swavely's survey of the personal characteristics franchisors weigh and Grace and Weaven's research on franchisees' satisfaction with the relationship frame the choice. The post proposes minimum financial requirements, an owner-operator commitment for the first two years and a paid working day in a company territory, and asks classmates whom they would choose.
Where the OL 640 Module 6 rubric puts the points
The franchisee-selection discussion in OL 640 rewards criteria tied to the system's model, accurate use of research on selection and franchisee outcomes, a practical and consistent process, attention to the importance of early franchisees and replies that challenge classmates' choices. Posts that test candidates in real working conditions tend to be most convincing. Credit falls for selecting on money alone, for criteria that could not be applied consistently, for ignoring fair-treatment and anti-discrimination obligations or for replies that simply endorse a classmate's pick without probing which criterion they would relax. Posts that explain why the system's economics favor one type of owner, rather than stating a preference, earn the stronger marks.
OL 640 Module 6 help: the mistakes that cost points
Describe what the system needs from an owner, based on how the business makes money: does it need someone working in the business daily or can an absentee owner succeed? Set financial minimums based on the initial investment and working capital. Add personal criteria with evidence behind them, such as relevant experience and willingness to follow a system. Design a process that tests candidates in real conditions, not just in interviews. Apply criteria consistently and document decisions. Consider why early franchisees matter so much to a young system. Read research on selection and franchisee outcomes. Close by asking OL 640 classmates which candidate they would choose, and in replies ask what would change their mind.
Get OL 640 Module 6 written to your instructions
Tell us about the franchise system and the candidates or criteria in question, and paste the OL 640 Module 6 prompt. We draft a post that weighs selection criteria with franchising research, proposes a practical selection process and closes by asking OL 640 classmates which candidate they would choose. Your first OL 640 selection post is free, with delivery in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 640 papers and related MS Organizational Leadership samples
- OL 640 Module 1 Discussion: Why Firms Franchise
- OL 640 Module 2 Disclosure Document Assignment: Franchise Disclosure Document Analysis
- OL 640 Module 3 Milestone One: Franchise Feasibility
- OL 640 Module 4 Discussion: Territories and Encroachment
- OL 640 Module 5 Milestone Two: Franchise System Design
- OL 640 Module 7 Milestone Three: Franchisor-Franchisee Relationship and Quality Control
- OL 640 Module 8 Discussion: Conflict in Franchise Systems
- OL 640 Module 9 Final Project: Franchise Plan
- OL 640 Module 10 Discussion: Franchising as Entrepreneurship
- MKT 660 Module 9 Discussion: Ethics of Nonprofit Storytelling and Imagery
- MKT 610 Module 8 Sales Promotion, Publicity and Trade Selling Assignment: Sales Promotion, Public Relations and Personal Selling
- FIN 550 Module 8 Working Capital Assignment: The Cash Conversion Cycle and Holiday Tins
- BMB 515 Module 8 Marketing and Retail Assignment: A Release Plan From Preorder to Vinyl
OL 640 Module 6 questions, answered
Where can I find a free OL 640 Module 6 Discussion sample?
The full OL 640 Module 6 post is on this page: how a junk removal franchisor should choose its first franchisees.
How do franchisors select franchisees?
Usually by financial qualification, relevant experience and personal characteristics such as work ethic and willingness to follow the system, often with interviews and site visits.
Do selection criteria predict franchisee success?
Research finds that criteria such as attitudes, experience and fit relate to later franchisee behaviors franchisors value, such as cooperation and lower opportunism.
Should a franchise accept absentee investors?
It depends on the model; systems that rely on hands-on service often require owners to operate the business, at least in the early years.
Why are a franchise system's first owners so important?
They shape the system's reputation, provide the results future buyers will examine and test whether the model works away from the founder.