OL 640 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 640 Module 4 Discussion sample examines how a franchisor should design territories and avoid encroaching on its franchisees. SNHU OL 640 (OL-640) turns to territories in Module 4 of its MS Organizational Leadership course on franchising. The franchisor is Second Haul Junk Removal, a composite Pittsburgh company planning its first franchised territories in Columbus, Ohio. The post weighs evidence that nearby same-brand units cut franchisees' revenues, that new chains granting exclusive territories survived longer and that franchisor and franchisee goals for coverage rarely match, proposes a territory design based on drive time and households and asks classmates how they would balance growth and fairness.

CourseOL 640 Franchising
ModuleModule 4
Paper typegraduate discussion post on designing franchise territories and preventing encroachment
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 640 Module 4

1

Module Four Discussion

Drawing Territories Without Cannibalizing Them

Second Haul plans to sell its first franchised territories in Columbus, Ohio, a metro area with about 900,000 households. The temptation is to draw small territories and sell many of them. The risk is that owners end up competing with each other, or with us, for the same customers.

What this page is doingThe Columbus map.
2

Kalnins (2004), using revenue data from Texas hotels in the 1990s, provided systematic evidence that when franchisors approved new same-brand hotels near existing franchisees, the incumbents' revenues fell, confirming what franchisees had long complained about. Zeller et al. (1980), modeling market penetration in franchise systems, showed that the franchisor's goal of maximum coverage and the franchisees' goal of protected sales coincide only in limited circumstances. Azoulay and Shane (2001), studying 170 new franchise contracts and interviewing founders, found that new chains that adopted exclusive territories were more likely to survive, and that founders who failed often lacked an understanding of why such contract terms matter.

What this page is doingWhat encroachment does.
3

Divide Columbus into six exclusive territories of about 150,000 households, drawn so a truck can reach any address within 25 minutes of the territory's center. Owners get a right of first refusal on any adjacent territory and on new territories created if the metro area grows. Second Haul will not reserve national accounts; commercial customers with sites in several territories will be served by each local owner, with the call center splitting the booking. Online bookings go to the owner whose territory contains the address.

What this page is doingMy proposal.
4

Six territories may leave some demand unserved in the first years. I would rather have owners who grow into their territories than owners who fight over customers. If a territory's owner cannot meet demand, shown by unanswered booking requests over two quarters, the owner can add a truck or, as a last step, agree to split the territory and keep the first right to buy the new one.

What this page is doingThe trade-off.
5

How would you balance a franchisor's growth with each owner's room to grow, and what would your rule do if a market grew faster than expected?

What this page is doingYour view.
6

References

Azoulay, P., & Shane, S. (2001). Entrepreneurs, contracts, and the failure of young firms. Management Science, 47(3), 337-358. https://doi.org/10.1287/mnsc.47.3.337.9771

Kalnins, A. (2004). An empirical analysis of territorial encroachment within franchised and company-owned branded chains. Marketing Science, 23(4), 476-489. https://doi.org/10.1287/mksc.1040.0082

Zeller, R. E., Achabal, D. D., & Brown, L. A. (1980). Market penetration and locational conflict in franchise systems. Decision Sciences, 11(1), 58-80. https://doi.org/10.1111/j.1540-5915.1980.tb01125.x

What the OL 640 Module 4 instructions ask for

The Module 4 discussion in OL 640 is about territories: how much area or how many customers a franchisee gets, whether the territory is exclusive and what the franchisor may do inside it. Expect to propose a territory design for a specific market and explain it with research on encroachment and territorial rights. Good posts recognize the tension: franchisors gain from more units and wider coverage, while each franchisee gains from less competition nearby, including from the same brand. Specific design choices, such as the basis for drawing boundaries, rights to adjacent areas and how national accounts or online sales are handled, carry more weight than general statements about fairness. Replies should ask classmates how their design would handle a market that grows faster than expected.

How this OL 640 Module 4 discussion example is built

The sample considers how Second Haul Junk Removal, an imagined Pittsburgh company preparing to franchise, should divide the Columbus, Ohio, metro area. Kalnins's study of Texas hotels, which found that franchisors' approval of new same-brand units nearby reduced incumbent franchisees' revenues, Azoulay and Shane's finding that new franchise chains adopting exclusive territories were more likely to survive and Zeller, Achabal and Brown's model showing that franchisor and franchisee goals for market penetration coincide only in limited circumstances frame the choice. The post proposes exclusive territories of about 150,000 households drawn on 25-minute drive times, a right of first refusal on adjacent areas and no reserved national accounts, then asks classmates how they would balance growth and fairness.

Where the OL 640 Module 4 rubric puts the points

Credit in the fourth OL 640 discussion follows a clear territory proposal for a specific market, accurate use of research on encroachment and exclusive territories, recognition of the competing interests of franchisor and franchisee, specific rules for adjacent areas, growth and reserved channels and replies that test classmates' designs. Proposals with a defensible basis for drawing boundaries tend to do best. Points slip for vague promises of protection, for ignoring how online and national account sales cross territory lines, for territories so large owners cannot serve them or for replies that praise a design without asking what happens when a market outgrows it.

OL 640 Module 4 help: the mistakes that cost points

Pick the market and decide what a territory should be based on: population, households, businesses or drive time, depending on how the service is delivered. Size territories so one owner can serve them well and still grow. Decide whether they are exclusive and what the franchisor reserves, such as national accounts or online sales. Plan for growth: rights of first refusal, rules for adding units and how to handle owners who under-serve their area. Read research on encroachment and exclusive territories so your choices rest on evidence. Name the trade-off you are accepting. Close by asking OL 640 classmates how they would balance system growth with owners' room to grow, and in replies ask what their rule does when a market booms.

Get OL 640 Module 4 written to your instructions

Paste the OL 640 Module 4 prompt and the market where territories must be drawn. We write a post that sets out territory options, weighs research on encroachment and exclusive territories, proposes a design that balances system growth with owners' room to grow and asks OL 640 classmates how they would strike the balance. The first territory post is free and ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 640 papers and related MS Organizational Leadership samples

OL 640 Module 4 questions, answered

Where can I find a free OL 640 Module 4 Discussion sample?

The full OL 640 Module 4 post is on this page: how a junk removal franchisor should draw territories in Columbus without encroaching on owners.

What is encroachment in franchising?

When a franchisor places a new unit of the same brand, or sells through other channels, close enough to an existing franchisee to take some of its customers.

Should franchise territories be exclusive?

Research on new franchise chains found those offering exclusive territories were more likely to survive, likely because owners invest more when protected.

How are franchise territories drawn?

Usually by population, households or businesses, or by drive time for service businesses, sized so one owner can serve the area well and still grow.

What is a right of first refusal in franchising?

A franchisee's right to be offered an adjacent or new territory before the franchisor sells it to someone else.