OL 630 Module 6 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 630 Module 6 Discussion sample examines founder traits and persistence, and how an entrepreneur can tell commitment from stubbornness. SNHU OL 630 (OL-630) takes up the psychology of entrepreneurs in Module 6 of this MS Organizational Leadership course. The founder is planning Curbside Tread Co., a composite Columbus mobile tire startup, and has said he will keep the household service going even if demand stays weak. The post uses research on owner traits that fit the daily work of running a firm, on the psychology of entrepreneurship and on why underperforming firms persist, proposes stop-or-change triggers and asks classmates how they decide when to persist.

CourseOL 630 Entrepreneurship and Small Business Management
ModuleModule 6
Paper typegraduate discussion post on entrepreneurial personality, persistence and when to keep going or stop
LengthAbout 370 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 630 Module 6

1

Module Six Discussion

Persistence or Stubbornness?

Customer testing showed fleets are Curbside Tread Co.'s best customers and households a weaker second line. I have said I will keep household service going even if demand stays weak, because household callers at the dealership were the reason I started. A classmate asked last week whether that is persistence or stubbornness. It is a fair question.

What this page is doingThe decision.
2

Rauch and Frese (2007) pooled studies of business owners and found that traits suited to an owner's actual work, a strong drive to achieve, confidence in one's own competence, a habit of taking initiative and openness to new ways, had more to do with whether people started and succeeded in business than traits unrelated to that work. Frese and Gielnik (2014), reviewing the psychology of entrepreneurship, emphasized that such traits operate through actions, planning and learning, not as fixed destiny. Persistence helps when it keeps a founder acting and learning; it hurts when it stops learning.

What this page is doingWhat research says about founder traits.
3

Gimeno et al. (1997) found that whether a struggling business survived depended not only on its economic performance but on the owner's threshold of acceptable performance, which was lower for owners with fewer alternatives, more psychic income from owning the business and other personal reasons to continue. My attachment to the household customers is exactly that kind of psychic income. I also have fewer alternatives than I would like to admit: after leaving the dealership, going back would mean starting over in seniority, which could make me tolerate poor results longer than a founder with an easy way back.

What this page is doingWhy owners keep going too long.
4

Before launch I will write down two triggers and give them to my adviser. If household installations average fewer than eight a week after six months, or cost more to acquire than they earn in three visits, I will drop household service and put the van hours into fleets. If the whole business has not reached break-even by month 18, we will meet to decide whether to change the model or close. My adviser, a retired dealership owner with no money in the business, will review both triggers with me every quarter.

What this page is doingMy triggers.
5

What evidence would make you change course on your own idea, and who would you trust to hold you to it?

What this page is doingYour view.
6

References

Frese, M., & Gielnik, M. M. (2014). The psychology of entrepreneurship. Annual Review of Organizational Psychology and Organizational Behavior, 1, 413-438. https://doi.org/10.1146/annurev-orgpsych-031413-091326

Gimeno, J., Folta, T. B., Cooper, A. C., & Woo, C. Y. (1997). Survival of the fittest? Entrepreneurial human capital and the persistence of underperforming firms. Administrative Science Quarterly, 42(4), 750-783. https://doi.org/10.2307/2393656

Rauch, A., & Frese, M. (2007). Let's put the person back into entrepreneurship research: A meta-analysis on the relationship between business owners' personality traits, business creation, and success. European Journal of Work and Organizational Psychology, 16(4), 353-385. https://doi.org/10.1080/13594320701595438

What the OL 630 Module 6 instructions ask for

The sixth OL 630 discussion asks students to reflect on the entrepreneur as a person: the traits and habits associated with starting and succeeding in business, and how founders decide when to persist and when to change course. Expect to apply research on entrepreneurial personality and psychology to yourself or the founder you are studying, and to a real decision. Graduate posts should avoid romantic ideas of the never-quit founder and engage with evidence that persistence helps in some conditions and harms in others. Concrete decision rules, such as triggers agreed in advance, make the post useful. Replies should ask classmates what evidence would make them change course.

How this OL 630 Module 6 discussion example is built

The sample considers the founder of Curbside Tread Co., an imagined mobile tire service in Columbus, Ohio, who has said he will keep offering household installations even if demand stays weak, because those customers first inspired the idea. Rauch and Frese's finding that traits tied to an owner's real daily work forecast starting and succeeding better than general traits, Frese and Gielnik's review of the psychology of entrepreneurship and Gimeno, Folta, Cooper and Woo's finding that a struggling firm's survival depends on the owner's own threshold of acceptable performance, not only on results, frame the question. The post proposes written triggers set before launch, for changing the household service and for the business as a whole, and asks classmates how they decide when to persist.

Where the OL 630 Module 6 rubric puts the points

For the sixth OL 630 discussion, credit usually goes to accurate use of research on entrepreneurial traits and persistence, honest application to the founder's own situation, a balanced view of when persistence helps and when it harms, concrete decision rules and replies that test classmates' thinking. Standout OL 630 posts turn self-knowledge into a practical safeguard. Posts lose credit for celebrating persistence uncritically, for treating personality as fate, for describing traits without connecting them to a decision or for replies that encourage without asking what evidence would change a classmate's mind. Graders in this OL 630 module also reward a founder who names an outside person to review the triggers, since self-judged thresholds tend to slide.

OL 630 Module 6 help: the mistakes that cost points

Choose a real decision you or your founder face where persistence is in question. Read research on which traits relate to entrepreneurial success, noting that traits fitted to the actual work of an owner count for more than general ones, and on why owners sometimes keep underperforming businesses going. Ask what personal reasons, such as pride, identity or few alternatives, might make you persist past the point that evidence supports. Set specific triggers in advance: measures, thresholds and dates that will prompt a change. Decide who you will ask for an outside view. Close by asking OL 630 classmates what evidence would make them change course, and in replies ask who holds them to it.

Get OL 630 Module 6 written to your instructions

Paste the OL 630 Module 6 prompt and a note on the decision you are weighing about your venture. Our writers set studies of founder personality, persistence and survival thresholds against your decision, proposes concrete triggers for changing course and invites OL 630 classmates to share how they decide. The first post on this topic is free and returned in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 630 papers and related MS Organizational Leadership samples

OL 630 Module 6 questions, answered

Where can I find a free OL 630 Module 6 Discussion sample?

The full OL 630 Module 6 post is on this page: a mobile tire founder asks whether his plan to persist is commitment or stubbornness.

Is there an entrepreneurial personality?

Only loosely. Traits that fit what owners actually do, like a drive to achieve and confidence in one's own ability, track with founding and success better than general personality does.

Why do some failing businesses keep going?

Research finds survival depends partly on the owner's personal threshold for acceptable performance, which is lower for owners with fewer alternatives or strong attachment.

How should a founder decide when to change course?

Set measurable triggers before launch, review them on a schedule and ask an adviser who has no stake in the original idea to weigh in.

Is persistence good for entrepreneurs?

It helps when progress is being made and the evidence is unclear, and harms when it keeps resources in a business or product the evidence has already rejected.