| Course | MKT 500 Marketing Strategies |
|---|---|
| Module | Module 7 |
| Paper type | graduate milestone segmenting the market for the new product, choosing target segments on stated criteria and writing a positioning statement and marketing strategy |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 500 Module 7
Campus Crews First, Contractors Later: Segmenting, Targeting and Positioning the Walkway
[Student Name]
Southern New Hampshire University
MKT 500: Marketing Strategies
Milestone Seven: Segmentation, Targeting and Positioning
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Campus Crews First, Contractors Later: Segmenting, Targeting and Positioning the Walkway
Introduction
Milestone Six found that interest in the Walkway differs sharply by type of organization: universities showed the most, hospitals nearly as much and other institutions much less. This milestone uses that finding to segment the market, choose targets and write the position that the marketing mix in Milestone Eight will carry out.
Segmentation and Differentiation
Smith (1956) drew the line that marketers still use: one strategy shapes the product and its marketing to fit groups of buyers whose wants differ, while the other tries to pull demand toward one product by making it seem different from rivals'. Dickson and Ginter (1987) later argued that the two had been widely misread as alternatives. Segmentation, in their account, describes a market in which demand varies among groups, and differentiation describes changing how buyers perceive a product; a firm can and usually should do both. The Walkway plan does both: it serves particular groups whose needs differ from road plow buyers, and it tries to make the Walkway look clearly unlike the other ways those groups clear sidewalks.
Bases for Segmentation
The customer research tested several possible bases: region, organization size, ownership of electric vehicles and type of organization. Type of organization predicted needs and buying process best. Universities care about residence-hall quiet hours and emissions targets and often buy through cooperative contracts. Hospitals care most about patient quiet and fall claims and buy through centralized purchasing. Contractors care about price and speed and buy through dealers. Size and electric-vehicle ownership mattered within each type but did not separate the groups as clearly. The plan therefore segments by organization type, using size as a second filter.
The Six Segments
Segments in the launch region (Wisconsin, Minnesota, Michigan, Illinois, Iowa)
| Segment | Estimated organizations | Main need | How they buy |
|---|---|---|---|
| University and college grounds departments | 340 | Quiet near residence halls; meet emissions goals; clear before 7 a.m. | Cooperative contracts and dealers |
| Hospital facilities teams | 410 | Quiet near patients; fewer falls; reliable on the worst nights | Central purchasing, often by bid |
| Downtown improvement districts | 120 | Clear long blocks of public walk before businesses open | Small budgets, local dealers |
| Large apartment and condominium owners | 900 | Low cost; few complaints from residents | Property managers, often contract instead |
| Municipal sidewalk crews | 260 | Speed over long distances; durability | Public bids, existing Wolf River relationships |
| Snow removal contractors | 1,500 | Price, speed, many sites in one night | Dealers, quick decisions |
Choosing Targets
The planning team rated every segment against the same yardsticks, with 5 as the best mark. Size and growth estimate sales potential. Fit asks how well the Walkway's main benefits, quiet operation, electric compatibility and brine, match the segment's needs. Reachability asks whether Wolf River's dealers and a cooperative contract can reach the buyers. Competitive intensity is scored in reverse, so a less crowded segment scores higher.
Segment scores (1 = weak, 5 = strong)
| Segment | Size and growth | Fit | Reachability | Competition (reverse) | Total of 20 |
|---|---|---|---|---|---|
| Universities | 3 | 5 | 4 | 4 | 16 |
| Hospitals | 3 | 5 | 3 | 4 | 15 |
| Downtown districts | 2 | 4 | 3 | 3 | 12 |
| Apartment owners | 4 | 2 | 2 | 3 | 11 |
| Municipal crews | 2 | 3 | 5 | 2 | 12 |
| Contractors | 5 | 2 | 4 | 1 | 12 |
Universities are the primary target. In the survey they led on interest, on electric fleets already in the garage and on enthusiasm for the brine sprayer, and they can be reached through cooperative contracts as well as dealers. Hospitals are the secondary target: their needs fit just as well, but central purchasing and bidding make them slower to reach, so the plan begins with hospitals that dealers already serve.
Contractors are the largest segment and the one most often suggested by dealers, which makes deferring them a deliberate choice. They value price and speed above quiet, they have the most alternatives, including imported blades, and the larger plow brands own their loyalty. Selling to them first would push the Walkway into a price fight it cannot win. They become a target once the product has a track record and a lower-cost model is possible. Municipal crews are close to Wolf River already and will be offered the Walkway through existing accounts, but they are not a launch focus.
Positioning
Kalafatis et al. (2000), studying how firms in a business market positioned themselves, found that buyers' perceptions rested mainly on hard criteria, such as product quality, and on relationship factors, such as personal contact, with geographic coverage and breadth of offering also playing a part, and that buyers who knew a company better perceived its position more clearly. That finding suggests the Walkway's position should rest on a measurable product claim and on the dealer relationship, and that demonstrations matter because most target buyers do not yet know Wolf River.
The positioning statement for the launch is: "For university and hospital grounds teams who must clear walks before people arrive, the Walkway is the battery-powered sidewalk plow that clears quietly in the dark, runs a full shift on its own power and costs less over five winters than a gasoline plow, because it carries its own cold-rated battery and treats walks with brine before the storm, backed by a local dealer who services it overnight if needed."
How buyers are likely to see the options
| Option | Noise at 5 a.m. | Five-winter cost | Speed on long walks |
|---|---|---|---|
| Walkway | Very low | Lowest of the powered options | High |
| Gasoline utility plow | High | Middle | High |
| Imported blade, no power unit | Depends on vehicle | Low purchase, higher salt and labor | Middle |
| Walk-behind blower | Middle | Low purchase, highest labor | Low |
The map shows the Walkway alone in the quiet, high-speed, low-lifetime-cost corner. A larger rival could match the quiet with its own electric model, but not quickly match the combination of brine, cold-rated battery and overnight dealer service.
The Strategy That Follows
The position commits the plan to a few choices. Price must be justified by lifetime cost, not set against imported blades. The channel must include dealers who can service at night and a cooperative contract universities already use. Promotion must let buyers hear the plow, since quiet is the claim most easily shown and least easily believed on paper. Milestone Eight sets out those choices in detail.
References
Dickson, P. R., & Ginter, J. L. (1987). Market segmentation, product differentiation, and marketing strategy. Journal of Marketing, 51(2), 1-10. https://doi.org/10.1177/002224298705100201
Kalafatis, S. P., Tsogas, M. H., & Blankson, C. (2000). Positioning strategies in business markets. Journal of Business & Industrial Marketing, 15(6), 416-437. https://doi.org/10.1108/08858620010349501
Smith, W. R. (1956). Product differentiation and market segmentation as alternative marketing strategies. Journal of Marketing, 21(1), 3-8. https://doi.org/10.1177/002224295602100102
What the MKT 500 Module 7 instructions ask for
The seventh MKT 500 milestone generally asks you to segment the market for your new product, select one or more target segments and explain how the product will be positioned against competitors. Expect to name the bases you used to divide the market, describe each segment, state the criteria for choosing targets, justify your choice and write a positioning statement that covers the buyer, the category being competed in, the main benefit and the reason to believe it. Many versions also ask for the overall marketing strategy the position implies. A strong milestone shows why the chosen segments are better than the others, not only that they are attractive, and keeps the position narrow enough that a buyer would remember it.
How this MKT 500 Module 7 milestone seven example is built
The sample divides the sidewalk-clearing market into six segments by type of organization, which proved to predict needs and buying behavior in the customer research: university grounds departments, hospital facilities teams, downtown improvement districts, large apartment owners, municipal sidewalk crews and snow removal contractors. It scores each on size, growth, fit with the Walkway, reachability through dealers and competitive intensity, chooses universities first and hospitals second and explains why contractors wait. A positioning statement and a map of quietness against lifetime cost follow. Smith on segmentation and differentiation, Dickson and Ginter's clarification of both and Kalafatis, Tsogas and Blankson on business-market positioning support the choices.
Where the MKT 500 Module 7 rubric puts the points
Milestone Seven is typically graded on meaningful segmentation bases, clear segment descriptions, explicit targeting criteria and a justified choice, a distinctive and credible positioning statement and its link to the overall strategy, plus research and writing. Strong papers score segments in a table, explain why some attractive segments are left for later and write a position a competitor could not simply copy. Weak papers segment by demographics that do not predict behavior, choose every segment, write a position that claims everything, such as best quality at the lowest price, or describe a strategy that ignores the positioning. Showing how the position will guide the marketing mix makes the next milestone easier to write.
MKT 500 Module 7 help: the mistakes that cost points
Choose segmentation bases that predict how customers buy and what they need, not only who they are; for business products, type of organization, size and buying process often work well. Describe each segment in a sentence or two with its size. Set criteria before you choose, such as size, growth, fit, reachability and competition, and score each segment in a table. Pick one or two targets and explain why the others wait. Draft the position as one sentence a salesperson could repeat: the buyer, the category, the payoff and the proof. Check that a competitor could not make the same claim. Then say what the position means for price, channel and promotion.
Get MKT 500 Module 7 written to your instructions
Send the MKT 500 Milestone Seven guidelines with your customer findings. We segment the market, score the segments on clear criteria, choose targets, write a positioning statement and a perceptual map and explain the strategy with research. A first targeting milestone costs nothing and is normally delivered in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 500 papers and related MS in Marketing samples
- MKT 500 Module 1 Milestone One: Corporation Selection and Research
- MKT 500 Module 2 Milestone Two: New Product Proposal
- MKT 500 Module 3 Milestone Three: Mission Statement Analysis
- MKT 500 Module 4 Milestone Four: Environmental Analysis
- MKT 500 Module 5 Milestone Five: SWOT Analysis
- MKT 500 Module 6 Milestone Six: Customer Research and Marketing Objectives
- MKT 500 Module 8 Milestone Eight: Marketing Mix and Global Entry
- FIN 610 Module 5 Inventory Assignment: EOQ, Safety Stock and the Spring Build
- ACC 620 Module 2 Lease Accounting Assignment: A Terminal Lease and a Tractor Lease Side by Side
- MGT 701 Module 1 Discussion: Finding the Critical Issue
- ACC 645 Module 6 Milestone Two: A Whistleblower and Backdated Contracts
MKT 500 Module 7 questions, answered
Where can I find a free MKT 500 Module 7 Milestone Seven sample?
This page has the full MKT 500 Milestone Seven, which segments the sidewalk-clearing market, chooses targets and positions a composite battery-electric plow, with tables and research.
How do I choose a target market for the MKT 500 plan?
Set criteria such as size, growth, fit with the product, ability to reach the segment and competition, score each segment and choose the one or two with the best overall score.
What is a positioning statement?
One or two sentences naming who the product is for, what kind of product it is, the single benefit that matters most and the proof that makes the benefit believable.
What is the difference between segmentation and differentiation?
Segmentation divides a market into groups with different needs and serves them separately; differentiation makes a product stand out from rivals in buyers' minds.
Can the plan target more than one segment?
Yes, but most plans choose a primary target and a secondary one, since resources spread across many segments rarely win any of them.