| Course | MKT 500 Marketing Strategies |
|---|---|
| Module | Module 1 |
| Paper type | graduate milestone choosing an existing corporation and researching its history, products, markets, finances and competitors as the base for a new product plan |
| Length | About 1,180 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 500 Module 1
A Plow Maker That Lives by the Snowfall: Researching Wolf River Plow Works for a New Product Plan
[Student Name]
Southern New Hampshire University
MKT 500: Marketing Strategies
Milestone One: Corporation Selection and Research
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
A Plow Maker That Lives by the Snowfall: Researching Wolf River Plow Works for a New Product Plan
Why This Corporation
The strategic marketing plan in this course will be written for Wolf River Plow Works, a composite manufacturer of snow and ice control equipment in Shawano, Wisconsin. I chose it for three reasons. Its business is narrow enough to analyze in a single term, its sales problem is visible in its own numbers and it already owns something a new product could use: a network of dealers who know the people responsible for clearing snow across the northern United States. A company with no problem gives a new product plan nothing to solve, and a company with no assets gives it nothing to build on. Wolf River has both.
Company History
The company was founded in 1961 by Arne Halvorsen, a welder who built a plow frame for a county highway truck after the county's purchased plow cracked in its first winter. Within ten years the shop was building plows for counties across northeastern Wisconsin. In the 1980s it added salt and sand spreaders, and in 1997 it bought a small dump body maker in Wausau. The founder's granddaughter, Kari Halvorsen-Lind, became president in 2019. The family still owns all of the shares, and the company has never borrowed heavily, which gives it room to invest but also a habit of caution.
Products and Sales
Wolf River sells four product lines. Truck plows, from straight blades for pickups to wing plows for highway trucks, are the oldest and largest. Spreaders, both tailgate and hopper models, are second. Dump bodies sell steadily all year, and a small parts and service business supplies blades, cutting edges and hydraulic parts to existing owners.
Sales by product line, last fiscal year
| Product line | Sales ($ millions) | Share of sales | Trend over four years |
|---|---|---|---|
| Truck plows | 54.3 | 46% | Flat, swings with snowfall |
| Spreaders | 29.5 | 25% | Up slightly |
| Dump bodies | 21.2 | 18% | Flat |
| Parts and service | 13.0 | 11% | Up steadily |
| Total | 118.0 | 100% | Flat |
The table hides the most important fact about the business: plow sales depend on the weather. In the snowiest of the last six winters, plow sales were 24 percent above the six-year average; in the mildest, they were 23 percent below it. Dealers order plows in late summer based on the previous winter, so a mild winter leaves them holding stock, and the following year's orders fall. The plant runs overtime from August to December and has idle capacity from February through May. Total revenue has stayed between $112 million and $121 million for four years while costs for steel, labor and hydraulic parts have risen, so margins have narrowed.
Customers and Channels
Wolf River's customers are the people and organizations responsible for clearing snow: county and municipal public works departments, state highway districts, private snow removal contractors and owners of fleets such as utilities. Public buyers purchase through bids and cooperative purchasing contracts, often a year ahead. Contractors buy through dealers, usually when they buy a new truck.
The company reaches almost all of these buyers through 210 independent truck-equipment dealers in 14 states and three Canadian provinces. Dealers install plows and spreaders on new trucks, service them and carry parts. The relationship is old and loyal; 61 dealers have carried Wolf River for more than 25 years. This network is the company's strongest asset. A dealer's recommendation often decides which plow a contractor buys, and dealers hear first when a customer has a problem the current products do not solve.
Financial Position
Because the company is privately held, its figures come from the family's annual letter to dealers and from interviews with managers rather than public filings. Gross margin has fallen from about 29 percent five years ago to 25 percent last year, mostly because steel and hydraulic cylinders cost more and plow prices could not rise as fast in a market where dealers compare brands line by line. Operating profit was about $7.4 million, roughly 6 percent of sales. The balance sheet is strong: the company carries little debt and holds enough cash to fund a product launch of a few million dollars without outside money.
The pattern inside the year matters as much as the annual total. About 70 percent of plow and spreader shipments leave the plant between August and December. Parts sales peak in January and February, during storms. From March to June the plow lines run short weeks, and managers have kept skilled welders on staff by building dump bodies ahead of orders. Any new product that sells in summer and fall, or that can be built in spring for winter delivery, would use labor the company is already paying for. The parts and service line, the only line growing every year, also shows that customers will pay for support after the sale when the dealer provides it.
Competitors
The snowplow market in North America is led by a few large brands owned by bigger equipment groups, which spend far more on advertising and have dealers in nearly every snowbelt county. Wolf River competes on build quality, faster parts delivery and its standing with county highway departments in the upper Midwest. It is weakest with private contractors in the Northeast, where the larger brands dominate. A growing group of lower-priced imported plows for pickups and utility vehicles is sold online, which puts pressure on the lightest part of the range.
What the Research Suggests
Kohli and Jaworski (1990), drawing on 62 field interviews with managers, framed market orientation as work the whole firm does: collecting what it can learn about what buyers want now and will want later, passing that knowledge between departments and then acting on it. Wolf River does the first part well through its dealers but does little with what it hears. Dealers have reported for several winters that hospitals, universities and city sidewalk crews ask for small plows for utility vehicles, and the company has never answered.
Day (1994) argued that firms that sense their markets well, through organized ways of learning about customers, rivals and channel members, are better able to anticipate change than firms that react to it. Wolf River's dealer meetings and service records are a sensing system it has not yet used on purpose. Cooper and Kleinschmidt (1987), studying 203 new products, found that product superiority was the factor most strongly linked to commercial success and that careful work before development, defining the product and its market, mattered more than luck or market conditions. That finding sets the standard for the next milestone: a new product from Wolf River must be clearly better for a specific buyer, not simply something the plant could build.
Conclusion
Wolf River Plow Works is a sound, conservative company with one weather-driven market, idle capacity in spring, a loyal dealer network and unanswered requests from customers it has never served. Those facts point toward a new product that sells to different buyers through the same dealers, uses the plant when it is quiet and does not rise and fall with truck plow orders alone. The next milestone proposes that product.
References
Cooper, R. G., & Kleinschmidt, E. J. (1987). New products: What separates winners from losers? Journal of Product Innovation Management, 4(3), 169-184. https://doi.org/10.1111/1540-5885.430169
Day, G. S. (1994). The capabilities of market-driven organizations. Journal of Marketing, 58(4), 37-52. https://doi.org/10.1177/002224299405800404
Kohli, A. K., & Jaworski, B. J. (1990). Market orientation: The construct, research propositions, and managerial implications. Journal of Marketing, 54(2), 1-18. https://doi.org/10.1177/002224299005400201
What the MKT 500 Module 1 instructions ask for
Milestone One in MKT 500 usually asks you to choose an existing corporation and research it as the foundation for a strategic marketing plan for a new product or service. Expect to describe the company's history, products or services, customers and markets, size and financial position, competitors and recent performance, and to explain why it is a good candidate for a new offering. Strong submissions treat this as research rather than a company brochure: they show where sales come from, which way they are heading and what the firm does well that a new product could draw on. The choice matters, because a corporation with no visible need or capacity for a new product makes every later milestone harder to argue.
How this MKT 500 Module 1 milestone one example is built
The sample chooses Wolf River Plow Works, a composite plow and spreader maker in Shawano, Wisconsin, founded in 1961 and still family held, with 520 employees and $118 million in sales. It breaks revenue into four lines, shows that truck plows bring in 46 percent of sales and swing by up to a quarter between mild and snowy winters, and notes four years of flat total revenue. The dealer network of 210 independent truck-equipment shops is identified as the firm's strongest asset. Kohli and Jaworski's work on market orientation, Day's market-sensing capability and Cooper and Kleinschmidt's research on what separates winning products from losers explain why this firm needs and can support a new product.
Where the MKT 500 Module 1 rubric puts the points
Graders of the first MKT 500 milestone usually look at the choice of corporation and how it is justified, the depth and accuracy of the company research, the analysis of markets, customers and competitors, the link to a possible new product and the use of sources and APA style. The strongest papers present figures, such as sales by product line or region, and interpret them instead of copying an annual report. Papers lose marks for picking a company too large to analyze in a semester, for histories that run for pages without reaching the present, for missing competitors and for citing only the company's own website. A short closing statement of what the company lacks makes the case for the plan ahead.
MKT 500 Module 1 help: the mistakes that cost points
Choose a corporation whose products and customers you can actually research, preferably a firm whose own numbers reveal a weak spot, such as stalled revenue, dependence on a single product or a market that is getting smaller. Keep the history to a paragraph and spend the space on the present. Break revenue into lines, regions or customer groups, and show which way each is moving. Name the main rivals and what they do better. Describe how the company reaches customers, since the channel will shape any new product. Finish with the strengths a new product could use and the gaps it could fill, and keep a file of every source, because later milestones will reuse them. Note any facts you could not confirm rather than guessing them.
Get MKT 500 Module 1 written to your instructions
Send your MKT 500 Milestone One guidelines and the corporation you are considering. We research its history, product lines, customers, finances and rivals, explain why it suits a new product plan and cite every fact. Your opening milestone is written free and usually arrives within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 500 papers and related MS in Marketing samples
- MKT 500 Module 2 Milestone Two: New Product Proposal
- MKT 500 Module 3 Milestone Three: Mission Statement Analysis
- MKT 500 Module 4 Milestone Four: Environmental Analysis
- MKT 500 Module 5 Milestone Five: SWOT Analysis
- MKT 500 Module 6 Milestone Six: Customer Research and Marketing Objectives
- MKT 500 Module 7 Milestone Seven: Segmentation, Targeting and Positioning
- MKT 500 Module 8 Milestone Eight: Marketing Mix and Global Entry
- MKT 500 Module 9 Milestone Nine: Implementation, Evaluation and Control
- MKT 500 Module 10 Final Project: Strategic Marketing Plan
- BMB 655 Module 7 Discussion: Songwriter Advances as Loans With a Twist
- SPT 608 Module 4 Discussion: Fireworks, Bobbleheads and the Gate
- SPT 510 Module 2 Social Class Assignment: The Price of Playing
- QSO 560 Module 3 Descriptive Statistics Assignment: Lead Times and Rates by Channel
MKT 500 Module 1 questions, answered
Where can I find a free MKT 500 Module 1 Milestone One sample?
The full MKT 500 Milestone One on this page researches a composite Wisconsin snowplow maker as the corporation for a new product marketing plan, with figures and sources.
How do I choose a company for the MKT 500 marketing plan?
Pick an existing corporation you can research in depth, with a clear reason to add a product, such as flat sales or reliance on one market, and enough public information for every milestone.
What should company research include in a marketing plan?
History in brief, products and their share of sales, customers and markets, financial trend, competitors, channels and the strengths and gaps that a new product could build on.
What is market orientation?
A company-wide habit of gathering information about customers and competitors, sharing it across departments and acting on it, which research links to better business performance.
Why does a seasonal company need new products?
When sales depend on one season or one condition, such as snowfall, a new product that sells to other buyers or in other conditions can steady revenue and use idle capacity.