MKT 500 Module 2 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This MKT 500 Module 2 Milestone Two sample proposes the new product a strategic marketing plan will take from concept to market. SNHU MKT 500 (MKT-500) asks MS in Marketing students in Milestone Two to name a product or service their chosen corporation could add and to show why it deserves development. The memo proposes the Walkway, a 60-inch battery-electric plow with an optional brine sprayer for small utility vehicles, aimed at crews who clear sidewalks at hospitals, universities and city centers before dawn. It explains the need dealers keep reporting, what the product does better than existing options, how it fits a composite Wisconsin plow maker's plant and dealers and what development would cost.

CourseMKT 500 Marketing Strategies
ModuleModule 2
Paper typegraduate milestone proposing a new product for the chosen corporation, describing the concept, the customer need, the fit with the company and the case for development
LengthAbout 880 words, 5 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 500 Module 2

1

Memorandum

To: Kari Halvorsen-Lind, President

From: Product Marketing

Date: October 13, 2026

Re: Proposal to develop the Walkway battery-electric sidewalk plow

 

Recommendation

I recommend that Wolf River Plow Works develop the Walkway, a battery-electric plow and brine sprayer for the small utility vehicles used to clear sidewalks, paths and parking ramps, for launch in the fall of 2028. The product answers a need our dealers have reported for at least four winters, sells to buyers we do not reach today through the dealers we already have and would be built in the months when our plant is least busy. Development would cost about $1.4 million over 18 months.

What this page is doingLeads with the decision requested.
2

The Customer Problem

Hospitals, universities, city downtown districts and large apartment owners must clear miles of sidewalk before people arrive, often between 3 a.m. and 6 a.m. They use utility task vehicles, small four-wheel vehicles with a cargo bed, fitted with light plows. Three problems come up again and again in what dealers hear from these crews. First, the gasoline engines that power most of these vehicles and their plow pumps are loud enough to draw complaints from patients, residents and students sleeping a few yards away. Second, many campuses are replacing gasoline utility vehicles with electric ones, and operators are told not to run plow hydraulics from the vehicle's drive battery because it shortens range and voids some warranties. Third, crews spread far more rock salt on walkways than they need, and both facility managers and local governments are under pressure to cut chloride runoff into lakes and streams.

Dealers have passed these comments on in their annual surveys since 2022. Last year, 37 of our 210 dealers said at least one customer had asked for a quiet or electric sidewalk plow, and 12 said they had lost a sale because they had nothing to offer.

What this page is doingShows the need in the buyers' terms.
3

The Product

The Walkway is a 60-inch steel plow, narrow enough for most sidewalks, mounted on a quick-attach frame that fits the leading brands of utility vehicles. It carries its own sealed lithium battery pack and electric hydraulic pump, so it does not draw on the vehicle's power and runs almost silently. One charge lifts and angles the blade for a full eight-hour shift. An optional 50-gallon sprayer applies salt brine before a storm, which keeps snow from bonding to the pavement and lets crews use much less dry salt. The plow and sprayer would sell through our dealers for about $9,800 and $3,400.

What this page is doingDescribes what the Walkway is and does.
4

What Crews Use Now

Sidewalk crews have four choices today, and each falls short somewhere. Walk-behind snow blowers are cheap and quiet enough but slow, and supervisors say they cannot clear a hospital campus with them before the morning shift. Gasoline utility vehicles with conventional plows are fast but loud, and their pumps idle the whole time the vehicle runs. Compact tractors with front blades are powerful but too wide for many walks and expensive to own. Contract snow removal moves the problem to someone else, but contractors bill by the hour and cannot promise to arrive at a given building by 5 a.m. on every storm night. The Walkway is meant to keep the speed of a utility vehicle while removing the noise and the battery drain, and the sprayer adds something none of these options offer.

What this page is doingCompares the Walkway with today's options.
5

Why It Can Succeed

Henard and Szymanski (2001), in a meta-analysis of 24 possible predictors of new product performance, found that product advantage, market potential, meeting customer needs, skilled work before development and dedicated resources had the strongest effects on average. The Walkway is built around a specific need we can document, its advantage over gasoline units is easy to demonstrate in a few seconds of listening and the market of institutions with sidewalk crews is large and still growing as electric vehicles spread.

Cooper and Kleinschmidt (1987) found that product superiority was the leading factor in commercial success and that early definition of the product and market was the most critical step. Before engineering begins, I propose that we interview sidewalk crew supervisors and facility managers, an approach supported by Griffin and Hauser (1993), whose data suggested that talking one at a time with 20 to 30 buyers turns up nearly all of the needs a larger sample would, and that a two-hour group session yields little more than a pair of hour-long individual interviews. Those interviews will set the battery size, blade width and price before we commit tooling money.

What this page is doingConnects the concept to research on new products.
6

Fit and Cost

The Walkway uses our existing skills in blade fabrication, hydraulics and powder coating. It can be built in our Shawano plant from February to July, when plow lines run at about 60 percent of capacity. Our dealers already sell and service plows and know the facilities staff at many hospitals and universities through spreader sales. The new parts are the battery pack and electric pump, which we would buy from a supplier and test ourselves.

Estimated development cost

ItemCost
Engineering and prototypes$520,000
Battery and pump supplier qualification$180,000
Tooling and fixtures$410,000
Field testing, two winters$140,000
Dealer training and launch materials$150,000
Total$1,400,000
What this page is doingShows how the product uses what the company has.
7

Risks and Next Steps

The main uncertainties are price, battery performance in extreme cold and whether facility buyers will purchase through truck-equipment dealers. I recommend approving $180,000 now for customer interviews, a market survey and a working prototype, with the full budget decided after the customer research milestone.

What this page is doingNames what is still uncertain.
8

References

Cooper, R. G., & Kleinschmidt, E. J. (1987). New products: What separates winners from losers? Journal of Product Innovation Management, 4(3), 169-184. https://doi.org/10.1111/1540-5885.430169

Griffin, A., & Hauser, J. R. (1993). The voice of the customer. Marketing Science, 12(1), 1-27. https://doi.org/10.1287/mksc.12.1.1

Henard, D. H., & Szymanski, D. M. (2001). Why some new products are more successful than others. Journal of Marketing Research, 38(3), 362-375. https://doi.org/10.1509/jmkr.38.3.362.18861

What the MKT 500 Module 2 instructions ask for

The second MKT 500 milestone typically asks you to propose a new product or service for the corporation you researched and to explain the reasoning behind it. Expect to describe the concept, the customer problem it solves, the target buyers in broad terms, how it differs from what is already available and how it fits the company's capabilities, brand and channels. Some versions also ask for a rough estimate of cost or market size. A strong proposal ties the product to evidence about customers rather than to what the company would like to sell, and it is specific enough that a reader can picture the product, the buyer and the moment of use. Showing that the product draws on existing strengths makes later milestones far easier to argue.

How this MKT 500 Module 2 milestone two example is built

The sample is a memo to the composite company's president proposing the Walkway: a 60-inch plow for utility task vehicles with its own lithium battery and electric hydraulic pump, plus an optional 50-gallon brine sprayer. It describes the request dealers have heard for several winters, from hospitals, universities and downtown districts that clear walks before 6 a.m. near patients, residents and sleeping students. The memo explains why gasoline units are too loud and why the electric vehicles many campuses now buy should not power a plow from their drive batteries. Cooper and Kleinschmidt, Henard and Szymanski, and Griffin and Hauser support the case, and the memo estimates development at $1.4 million.

Where the MKT 500 Module 2 rubric puts the points

For this MKT 500 product proposal, marks usually depend on how clearly the concept is described, how well the customer need is supported, how the product differs from existing options, its fit with the corporation's strengths and channels, the realism of costs and the use of research and APA style. High-scoring proposals describe the buyer and the moment the product is used, cite evidence of demand and admit what is still uncertain. Proposals lose marks when the product could come from any company, when the need is assumed rather than shown, when competitors are ignored or when the idea depends on the firm doing something it has never done, such as selling direct to consumers without a plan.

MKT 500 Module 2 help: the mistakes that cost points

Start from a problem your corporation's customers already have, not from a product you like. Describe the product in plain terms: what it is, who uses it, when and why it is better than what they use now. Show the evidence of need you have, such as complaints, requests, trends or sales of related products, and be honest about what you still need to learn. Explain how the product uses the company's plant, skills, brand or channels. Give a rough development cost and timeline. Keep the target buyers broad for now, since a later milestone will narrow them. Write it as a memo to a decision maker, with a recommendation in the first paragraph.

Get MKT 500 Module 2 written to your instructions

Share the MKT 500 Milestone Two prompt and a line on your corporation. We propose a new product or service that fits what the company already does well, define the customer need, compare it with what buyers use now and estimate development costs, with research behind the choice. We draft your first Milestone Two at no cost, usually inside forty-eight hours. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 500 papers and related MS in Marketing samples

MKT 500 Module 2 questions, answered

Where can I find a free MKT 500 Module 2 Milestone Two sample?

This page includes the full MKT 500 Milestone Two memo proposing a battery-electric sidewalk plow as the new product for a composite snowplow maker, with research and cost estimates.

How do I pick a new product for the MKT 500 marketing plan?

Look for a need your corporation's customers or channel partners already report, then choose a product that solves it using the company's existing strengths, brand or distribution.

What makes new products succeed?

Meta-analysis points to product advantage, market potential, meeting customer needs, skilled work before development and dedicated resources as the strongest predictors of new product performance.

How long should the MKT 500 new product proposal be?

Most versions run two to four pages; follow your guidelines, and make sure the concept, the need, the fit and a rough cost are all covered.

What is the voice of the customer?

Customer needs gathered in the customers' own words, usually through interviews, and then organized and ranked so that product decisions reflect what buyers actually want.