| Course | MKT 675 Ethical and Legal Issues in Marketing |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment assessing a comparative advertising campaign for legal exposure under the Lanham Act and for fairness to competitors and consumers |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 675 Module 5
The Kibble Campaign and the Letter from a Rival: A Comparative Advertising Assessment for Barnaby and Birch
[Student Name]
Southern New Hampshire University
MKT 675: Ethical and Legal Issues in Marketing
Comparative Advertising Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Kibble Campaign and the Letter from a Rival: A Comparative Advertising Assessment for Barnaby and Birch
Introduction
The "Look Inside the Bag" campaign has run for eight weeks on social media and connected television. It is the company's most effective acquisition campaign this year, with new subscriber costs 22 percent below the average. Last week a large pet food maker sent a demand letter calling three of its claims false and disparaging and asking that the ads come down within fourteen days. This paper assesses the claims, the legal exposure and the fairness of the comparison, and recommends what to change.
The Campaign
The lead video opens on a hand pouring brown pellets from a red and gold bag into a bowl. The bag carries no brand name, but its colors, shape and paw-print design closely resemble the rival's best-selling adult formula. A voice says: "Most dog food is processed kibble, cooked at extreme heat that destroys nutrients. Some is made from 4-D meat. Your dog deserves to see what's inside." The camera then moves to a Barnaby and Birch tray of beef and carrots. Static ads repeat the nutrient and 4-D claims beside the same bag.
The Law
Comparative advertising is lawful in the United States, and the Federal Trade Commission has long encouraged truthful comparison because it helps buyers choose. But Section 43(a) of the Lanham Act lets a competitor sue over false or misleading statements of fact in commercial advertising. In general the rival must show that a statement is false or misleading, that it deceives or is likely to deceive a substantial part of the audience, that the deception is material to purchasing, that the ad was in interstate commerce and that the rival has been or is likely to be injured. A literally false statement can be proved from the ad itself. A statement that is true but misleading usually requires evidence, often a consumer survey, of what buyers took from it. Remedies can include an injunction, corrective advertising and damages.
The Claims Tested
Claims, accuracy and exposure
| Claim | What it says or implies | Evidence | Exposure |
|---|---|---|---|
| "Processed kibble" vs fresh food | Kibble is extruded and baked; ours is gently cooked | Accurate; extrusion runs well above the company's cooking temperatures | Low |
| "Cooked at extreme heat that destroys nutrients" | Kibble lacks the nutrients dogs need | Heat does reduce some vitamins, but kibble is fortified after cooking to meet the same nutrient profile | High |
| "Some is made from 4-D meat" | The pictured brand uses meat from dead, dying, diseased or disabled animals | No evidence about the rival's sourcing | High |
| Bag resembling the rival's | The comparison is with that brand | Design choices made the brand identifiable | Raises the other two |
The nutrient claim is the clearest problem. Read plainly, it says kibble leaves dogs without the nutrients they need. Yet the rival's formula, like Barnaby and Birch's own, is labeled complete and balanced under the same nutrient profile, because vitamins lost in cooking are added back. A court could find the claim literally false. The 4-D line is worse in one respect: paired with a recognizable bag, it implies that a particular company feeds dogs meat from diseased animals, and Barnaby and Birch has nothing to support that.
What the Comparison Gains and Risks
Grewal et al. (1997), combining dozens of studies in a meta-analysis, found that comparative ads tended to draw more attention and stronger purchase intentions than noncomparative ads but were also judged less credible as sources. The campaign's low acquisition cost is consistent with the first finding. The second matters for a subscription brand: Darke and Ritchie (2007) found that consumers who discover they were deceived become distrustful of later advertising. Kibble buyers who switch because they were told their old food was nutritionally empty, then learn otherwise from their veterinarian, may question the company's other claims. Jain and Posavac (2004) found that comparisons framed negatively, saying that a rival is worse rather than that the advertiser is better, were judged less credible and provoked more counterarguments. The nutrient and 4-D lines are negative comparisons of exactly that kind.
Responding to the Letter
The company has three realistic responses. It can defend the campaign, which would require evidence it does not have for the nutrient and 4-D claims and would invite a suit seeking a preliminary injunction, with legal costs likely to exceed the campaign's savings within weeks. It can ignore the letter, which leaves the rival free to file and makes the company look careless if the dispute later becomes public. Or it can remove the challenged lines, keep what it can prove and say so in a short reply. Many disputes of this kind end at that stage. Competitors can also take national advertising disputes to the National Advertising Division, the industry's self-regulatory forum, which reviews comparative claims and publishes its decisions; a negative decision there would draw trade press attention the company does not want. The third response protects the campaign's real advantage while removing the claims that create the risk.
Fairness
A fair comparison helps a buyer choose between real differences, and the duty runs to the rival as well: a competitor's reputation is built over decades and can be damaged by one insinuation repeated to millions of viewers. Fresh food and kibble do differ in processing, moisture, ingredients visible to the owner and price. The campaign could make that case honestly. Instead its strongest lines work by frightening owners who have fed kibble for years into believing they harmed their dogs, and by insinuating misconduct by a named rival without evidence. That fails both the consumer and the competitor.
Recommendations
Pull the nutrient and 4-D claims now and reply to the letter confirming their removal, which is likely to resolve it without litigation. Replace the rival-like bag with a plain generic bowl of kibble. Keep the processing comparison, stated precisely: "Most kibble is extruded at high temperatures. Ours is cooked in small batches at lower heat, then frozen." Add claims the company can prove, such as moisture content and named whole-food ingredients. Route all comparative copy through the claims file and the shared lawyer before launch. Finally, test the revised ads against the current ones for four weeks; if acquisition costs rise modestly, the company should accept that as the price of a campaign it can defend in public and in court.
References
Darke, P. R., & Ritchie, R. J. B. (2007). The defensive consumer: Advertising deception, defensive processing, and distrust. Journal of Marketing Research, 44(1), 114-127. https://doi.org/10.1509/jmkr.44.1.114
Grewal, D., Kavanoor, S., Fern, E. F., Costley, C., & Barnes, J. (1997). Comparative versus noncomparative advertising: A meta-analysis. Journal of Marketing, 61(4), 1-15. https://doi.org/10.1177/002224299706100401
Jain, S. P., & Posavac, S. S. (2004). Valenced comparisons. Journal of Marketing Research, 41(1), 46-58. https://doi.org/10.1509/jmkr.41.1.46.25080
What the MKT 675 Module 5 instructions ask for
The Module 5 assignment in MKT 675 asks you to evaluate a comparative or competitive advertising campaign for its legal risk and ethical soundness. Expect to describe the campaign and its claims, explain the law that governs comparisons between competitors, assess each claim's truth, including what it implies, and judge whether the comparison is fair to consumers and rivals. Strong papers explain the elements of a false advertising claim under the Lanham Act, distinguish literally false statements from those misleading by implication, consider what evidence the company would need in court and use research on how comparative ads affect consumers. They close with a revised approach that keeps the competitive advantage without the exposure.
How this MKT 675 Module 5 comparative advertising assignment example is built
The sample assesses Barnaby and Birch's "Look Inside the Bag" campaign, which contrasts its fresh food with "processed kibble," pictures a bag resembling a market leader's and says kibble is "cooked at extreme heat that destroys nutrients" and "made from 4-D meat." The rival's demand letter calls the claims false and disparaging. The paper finds that the comparison of cooking temperatures is accurate, the nutrient claim is false as stated because kibble is fortified to meet the same standards and the "4-D meat" line implies a specific product uses diseased animals with no evidence. Grewal and colleagues' meta-analysis and Darke and Ritchie's work on distrust support a recommendation to compare on provable facts and retire the disparaging lines.
Where the MKT 675 Module 5 rubric puts the points
Comparative advertising papers in MKT 675 are usually graded on an accurate description of the campaign, correct explanation of the governing law, claim-by-claim analysis of truth and implication, consideration of evidence and remedies, ethical judgment about fairness and practical recommendations with citations. The best papers distinguish literal falsity from implied falsity and identify which claims would survive a challenge. Papers lose marks for treating any comparison with a competitor as illegal, assuming that not naming a rival removes all risk, ignoring implied messages, overlooking the company's own evidence gaps or recommending that the campaign be pulled entirely without salvaging what is true.
MKT 675 Module 5 help: the mistakes that cost points
Write out each claim the campaign makes, including what the images and layout imply. For each, ask whether it is literally true, true but misleading or false, and what evidence the company holds. Explain the elements a competitor must prove in a false advertising suit and which claims are most exposed. Note that identifying a rival by look or description can be as clear as naming it. Use research on comparative advertising to discuss what the campaign gains and risks. Then judge fairness: does the comparison help consumers choose, or only frighten them? Recommend a revised campaign that keeps the claims the company can prove. Close by saying which claims survive.
Get MKT 675 Module 5 written to your instructions
Share the MKT 675 Module 5 brief and the comparative campaign you are assessing. We test each statement for truth and implied meaning, explain the competitor's possible claim under federal false advertising law and its elements, weigh fairness to rivals and buyers and recommend a revised comparison. The first assessment is drafted at no cost, typically in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 675 papers and related MS in Marketing samples
- MKT 675 Module 1 Discussion: Ethics Beyond Legal Compliance
- MKT 675 Module 2 Claims Substantiation Assignment: Auditing Health and Quality Claims
- MKT 675 Module 3 Milestone One: Issues Inventory and Stakeholders
- MKT 675 Module 4 Discussion: Influencer Disclosure and Endorsements
- MKT 675 Module 6 Milestone Two: Subscription Pricing and Cancellation
- MKT 675 Module 7 Discussion: Customer Data, Privacy and Personalization
- MKT 675 Module 8 Environmental Claims Assignment: Green Claims and the Green Guides
- MKT 675 Module 9 Discussion: Guilt Appeals and Vulnerable Consumers
- MKT 675 Module 10 Final Project: Marketing Ethics and Compliance Review
- ACC 691 Module 7 Discussion: Why the Auditors Missed It
- FIN 610 Module 10 Final Project: Rappahannock's Short-Term Financial Plan
- FIN 685 Module 7 Discussion: One Grocery Chain Buys a Third of the Coffee
- ACC 693 Module 9 Milestone Three: The Timeline and the Findings
MKT 675 Module 5 questions, answered
Where can I find a free MKT 675 Module 5 comparative advertising sample?
This page includes the full MKT 675 Module 5 assessment of a composite fresh dog food campaign against kibble and a rival's demand letter.
Is comparative advertising legal in the United States?
Yes. Truthful, non-misleading comparison with competitors is allowed and the FTC has long encouraged it, but false or misleading comparisons can be challenged.
What is a Lanham Act false advertising claim?
A suit by a competitor under Section 43(a) alleging that a commercial advertising claim is false or misleading, material to buyers and likely to cause it injury.
What is the difference between literal and implied falsity?
A literally false claim is untrue on its face; an impliedly false claim is technically accurate but conveys a misleading message, usually shown with consumer evidence.
Does not naming a competitor avoid legal risk?
No. If images, colors or descriptions make the rival identifiable, the comparison can still be challenged.