MKT 675 Module 2 Claims Substantiation Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 675 Module 2 Claims Substantiation sample audits a company's advertising claims, asking what each tells a reasonable consumer and whether the evidence behind it would satisfy the Federal Trade Commission. SNHU MKT 675 (MKT-675) has MS in Marketing students apply deception and substantiation rules to real claims. The company is Barnaby and Birch, a composite fresh dog food brand. The audit examines five claims, from "human-grade" to "clinically shown to improve digestion in two weeks," sets the implied message beside the evidence on file and recommends keeping two, qualifying one and withdrawing two, with research showing how deception damages trust in later ads.

CourseMKT 675 Ethical and Legal Issues in Marketing
ModuleModule 2
Paper typegraduate assignment auditing a company's advertising claims for deception and substantiation under the FTC Act
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 675 Module 2

1

Human-Grade, Vet-Formulated and Two Weeks: A Claims Audit for Barnaby and Birch

[Student Name]

Southern New Hampshire University

MKT 675: Ethical and Legal Issues in Marketing

Claims Substantiation Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe company's claims, studies and survey were invented for this audit.
2

Human-Grade, Vet-Formulated and Two Weeks: A Claims Audit for Barnaby and Birch

Introduction

The company has grown on the strength of what it says about its food. This audit examines the five claims that appear most often across its website, box inserts, paid social ads and influencer briefs. For each, it identifies the message a reasonable consumer would take, the evidence on file and whether that evidence would satisfy the substantiation standard the Federal Trade Commission applies under Section 5 of the FTC Act, which prohibits deceptive acts or practices in commerce. It ends with a recommendation for every claim.

What this page is doingStates the purpose and scope.
3

The Standard Applied

Under the Commission's deception policy, a claim is deceptive if it is one a reasonable consumer would probably be misled by and if the misleading message matters to the decision to buy. The Commission's substantiation policy adds that an advertiser needs a reasonable basis in hand before it disseminates any objective claim, and that claims about health generally require competent and reliable scientific evidence. Vague praise, such as "dogs love it," is puffery that no one would treat as measurable and needs no proof. Pet food adds its own layer: state feed laws, most of which adopt the model regulations of the Association of American Feed Control Officials, govern terms such as "complete and balanced." That body's guidance also holds that "human-grade" should appear only when every ingredient and the finished product are stored, handled, processed and transported in line with federal rules for human food.

What this page is doingSets out the rules used.
4

The Five Claims

Claims, evidence and verdicts

ClaimMessage a consumer takesEvidence on fileVerdict
"Complete and balanced"Meets a recognized nutrition standard for dogsRecipes formulated to the AAFCO adult maintenance profile; lab analysis of each batchKeep
"Vet-formulated"A veterinarian designed the recipesRecipes written by a board-certified veterinary nutritionist under contractKeep, name her credential
"Human-grade"Made to the same standards as food for peopleIngredients are USDA-inspected, but cooking occurs at a co-packer licensed only for animal feedWithdraw
"Clinically shown to improve digestion in two weeks"A controlled study proved the food causes better digestion within two weeksOnline survey of 1,900 subscribers; 71 percent reported firmer stoolsWithdraw
"The fresh food vets recommend most"Most veterinarians recommend this brand over rivalsPaid panel of 140 veterinarians; 38 percent named the brand first among fresh foodsQualify or withdraw
What this page is doingCompares each claim with its evidence.
5

Human-Grade

The company's beef and vegetables are bought from suppliers that sell to restaurants, and the marketing team believed that made the food human-grade. But the claim describes the whole chain, not the ingredients alone, and the co-packer that cooks and freezes the trays holds only a commercial feed license. A reasonable buyer reads the term as meaning a person could safely eat the finished product, and that message is material, since it is a central reason customers pay four times the price of kibble. The claim should come down from every page and box until production moves to a facility that meets human food rules, and the company can say instead, accurately, that it uses USDA-inspected meats.

What this page is doingExplains the most serious exposure.
6

The Clinical Claim

"Clinically shown" tells a consumer that a clinical study, with dogs assigned to the food and compared with others, proved a result. The evidence is a survey of satisfied subscribers, sent after their third box. It has no comparison group, cannot separate the food from a dog adjusting to any new diet and reached only owners who stayed. It might support "many owners tell us their dogs' digestion improved," with the survey described, but it cannot support a clinical claim or a time frame. Health claims of this kind are the area where regulators have been least tolerant.

What this page is doingExplains why a survey is not a trial.
7

The Veterinarian Claim

The phrase "vets recommend most" implies a broad professional consensus. The panel was small, recruited and paid by the company, and asked respondents to choose among four fresh brands only, and 38 percent chose Barnaby and Birch. That is a plurality within a narrow comparison, not a recommendation over pet foods generally. If kept, the claim must state the comparison and the panel: "In a 2025 survey of 140 veterinarians we commissioned, more chose Barnaby and Birch than any other fresh brand." The team should judge whether that sentence still sells; if not, the claim was doing work the evidence could not.

What this page is doingWeighs a paid survey.
8

Why Weak Claims Cost More Than They Earn

The risk is not only legal. Darke and Ritchie (2007) found that consumers who discovered they had been deceived by one advertisement became distrustful of later advertising, even from different sources, and processed new claims defensively. A subscription brand depends on renewal every two weeks; a customer who learns that "human-grade" meant less than she assumed will discount the next claim, including the true ones. Hunt and Vitell (1986) described how marketers judge a choice by weighing what is owed to the people affected as well as the expected results; here both lines of judgment point the same way, since the misleading claims break a duty of honesty and also put renewals at risk. Darby and Karni (1973) described credence qualities, which buyers cannot verify even after they use a product, and showed why such qualities invite fraud. Whether a food was cooked to human-food standards is one of them: no owner can taste the difference, so the evidence must exist before the claim does.

What this page is doingApplies research on trust.
9

Claims That Pass

Not every claim is a problem, and the audit should say so. "Complete and balanced" is a regulated statement: under the model regulations adopted by most states, it may appear only when a food is formulated to meet a recognized nutrient profile or has passed a feeding trial, and the label must say which. Barnaby and Birch's recipes are formulated to the adult maintenance profile, and each batch is analyzed by an outside laboratory, so the claim is supported, though the label should state that it applies to adult maintenance and not to puppies. "Vet-formulated" is literally true, since a board-certified veterinary nutritionist wrote every recipe. Naming her and her credential makes the claim more specific and more persuasive, and it guards against the implication that a general practice veterinarian simply approved the food.

What this page is doingExplains why two claims stay.
10

Recommendations

Remove "human-grade" and "clinically shown" within two weeks, including from influencer briefs and saved ads. Revise the veterinarian claim with its qualification or drop it. Add the nutritionist's credential beside "vet-formulated." Create a claims file in which every objective claim is listed with its evidence and approved wording, and require that file before any new ad runs.

What this page is doingLists the changes.
11

References

Darby, M. R., & Karni, E. (1973). Free competition and the optimal amount of fraud. Journal of Law and Economics, 16(1), 67-88. https://doi.org/10.1086/466756

Darke, P. R., & Ritchie, R. J. B. (2007). The defensive consumer: Advertising deception, defensive processing, and distrust. Journal of Marketing Research, 44(1), 114-127. https://doi.org/10.1509/jmkr.44.1.114

Hunt, S. D., & Vitell, S. (1986). A general theory of marketing ethics. Journal of Macromarketing, 6(1), 5-16. https://doi.org/10.1177/027614678600600103

What the MKT 675 Module 2 instructions ask for

The Module 2 assignment in MKT 675 asks you to examine specific advertising or labeling claims a company makes and judge whether they are truthful and supported. Expect to quote each claim exactly, explain the message a reasonable consumer would take from it, including implied messages, identify the evidence the company has and assess whether that evidence is adequate for the type of claim. Strong audits distinguish objective claims that require proof from puffery, treat health and scientific claims with the higher standard they demand and consider any industry-specific rules. They end with a recommendation for every claim: keep, qualify or withdraw, with suggested wording where a claim can be fixed.

How this MKT 675 Module 2 claims substantiation assignment example is built

The sample audits five claims made by Barnaby and Birch, a composite Denver company selling fresh dog food by subscription. "Complete and balanced" is backed by formulation to a recognized nutrient profile and stays. "Vet-formulated" is accurate, since a board-certified veterinary nutritionist wrote the recipes, and stays with her credential named. "Human-grade" fails, because the company's co-packer is not a human food facility. "Clinically shown to improve digestion in two weeks" rests on an owner survey with no control group and should be withdrawn. "The fresh food vets recommend most" depends on a survey of 140 veterinarians the company paid for and needs qualification or removal. Darke and Ritchie's research on distrust frames the cost of weak claims.

Where the MKT 675 Module 2 rubric puts the points

Claims audits in MKT 675 are usually graded on accurate identification of each claim's express and implied meaning, correct application of deception and substantiation principles, assessment of the actual evidence, attention to industry rules, clear recommendations and citations and writing. The best audits present claims, evidence and verdicts in a table and give revised wording for claims that can be saved. Papers lose marks for judging claims by tone rather than evidence, treating all claims as puffery, ignoring implied claims, accepting customer testimonials or company-funded surveys as scientific proof or recommending that claims be reviewed without saying what to change.

MKT 675 Module 2 help: the mistakes that cost points

Collect the claims exactly as they appear on the website, packaging and ads. For each, write the message a typical customer would take away, including anything implied. Ask whether the claim is objective and measurable or vague praise no one would test. List the evidence the company actually has: studies, certifications, surveys or none. Judge whether that evidence matches the claim; health and clinical claims need competent and reliable scientific evidence. Check for rules specific to the industry. Then give a verdict for each claim and, where possible, rewrite it so it says only what the evidence supports. Present the results in a table so a reader can see each claim's verdict at a glance.

Get MKT 675 Module 2 written to your instructions

Share the MKT 675 Module 2 brief and the claims your company makes. We identify the express and implied message of each, compare it with the evidence the company holds and the reasonable-basis standard, and recommend which claims stay, which need qualifying and which should go. The first audit is prepared free and is usually ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 675 papers and related MS in Marketing samples

MKT 675 Module 2 questions, answered

Where can I find a free MKT 675 Module 2 claims audit sample?

This page includes the full MKT 675 Module 2 audit of five claims made by a composite fresh dog food company, with a claim-by-claim table.

What is claim substantiation?

The requirement that a company have a reasonable basis for objective advertising claims before making them; health claims generally need competent and reliable scientific evidence.

What is the difference between puffery and a factual claim?

Puffery is vague praise no reasonable consumer would treat as measurable, such as "delicious"; a factual claim can be tested and must be supported.

Can a customer survey support a health claim?

Rarely. A survey of satisfied owners without a control group cannot show that a product caused an improvement.

What is an implied claim?

A message a reasonable consumer takes from an ad even though it is not stated directly, such as a doctor's image implying medical endorsement.