MKT 635 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 635 Module 1 Discussion sample asks what a business website is for and how its success should be judged. SNHU MKT 635 (MKT-635) begins its MS in Marketing course on websites and search marketing with that question. The post introduces Bluegrass Arbor Works, a composite family tree care company in Lexington, Kentucky, whose owner wants a more modern-looking site. It argues that the website's one job is to turn a homeowner's search, often a worried one after a storm, into a call or a quote request, so it should be judged by being found and by converting visitors, not by looks, and it asks classmates to name their own site's one job.

CourseMKT 635 Websites and Search Engine Marketing/ Search Engine Optimization
ModuleModule 1
Paper typegraduate discussion post on what a website is for, how to judge it and how search fits into that purpose
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 635 Module 1

1

Module One Discussion

A Website's One Job Is the Phone Call

I will follow Bluegrass Arbor Works, a composite family tree care company in Lexington, Kentucky. It has 22 employees, three certified arborists and about $3.8 million in sales from removals, pruning, stump grinding, tree health treatments and emergency storm work. Its website was built in 2014. About 80 percent of visits come from phones, and most new customers call rather than fill out the form. The owner's view is that the site "looks dated" and needs a redesign.

What this page is doingThe company and its site.
2

I think the redesign starts from the wrong question. A homeowner who searches "tree fell on house Lexington" at midnight, or "oak tree pruning cost" on a spring Saturday, wants one thing: to reach someone competent and trustworthy. The site's job is to turn that search into a call or a quote request. Looking modern helps only if it serves that job.

What this page is doingThe site's one job.
3

Palmer (2002), across three studies of corporate websites, developed measures of download delay, navigability, content, interactivity and responsiveness and found them associated with site performance, measured as user satisfaction, likelihood of return and frequency of use. None of those is about style. A large survey by Bart et al. (2005) showed that trust online is built differently depending on what a site sells: navigation matters most for information-heavy sites, while brand strength matters most for high-involvement purchases. Hiring someone to cut down a 70-foot oak next to the house is high involvement, so certifications, reviews and visible local identity will matter. Hauser et al. (2009) showed that matching a site's look and feel to how visitors think can raise purchase intentions, a reminder that the storm-night visitor and the spring planner need different paths.

What this page is doingWhat research says matters.
4

Two measures: does the site appear for the searches homeowners make, and what share of visitors call or request a quote? Everything else, including the new look, should be judged by whether it moves those two numbers.

What this page is doingHow I would judge it.
5

If your organization's website had only one job, what would it be, and how would you know it was doing it?

What this page is doingOne job each.
6

References

Bart, Y., Shankar, V., Sultan, F., & Urban, G. L. (2005). Are the drivers and role of online trust the same for all web sites and consumers? A large-scale exploratory empirical study. Journal of Marketing, 69(4), 133-152. https://doi.org/10.1509/jmkg.2005.69.4.133

Hauser, J. R., Urban, G. L., Liberali, G., & Braun, M. (2009). Website morphing. Marketing Science, 28(2), 202-223. https://doi.org/10.1287/mksc.1080.0459

Palmer, J. W. (2002). Web site usability, design, and performance metrics. Information Systems Research, 13(2), 151-167. https://doi.org/10.1287/isre.13.2.151.88

What the MKT 635 Module 1 instructions ask for

The opening MKT 635 discussion usually asks what makes a website effective, often by introducing the organization whose site you will work on. Expect to describe the site's audience and purpose, judge it against that purpose and explain how search engines fit in. Strong posts define the site's main job in terms of a business outcome, such as calls, orders or applications, rather than appearance, name the measures that would show whether it succeeds and use research on usability and trust instead of opinions about design. Add one or two numbers about the site's traffic or leads so peers can test your claims.

How this MKT 635 Module 1 discussion example is built

The sample introduces Bluegrass Arbor Works, a composite Lexington, Kentucky, tree care company with 22 employees and three certified arborists, whose website was built in 2014. About 80 percent of visits come from phones, most leads arrive by phone and the owner wants the site to look more modern. The post argues that the site's job is to turn searches into calls and quote requests, especially after storms, and that it should be judged by search visibility and conversion. Palmer's website performance measures, Bart, Shankar, Sultan and Urban's work on what drives online trust in different kinds of sites and Hauser and colleagues' website morphing research support the argument.

Where the MKT 635 Module 1 rubric puts the points

The first MKT 635 discussion is commonly graded on a clear statement of the website's purpose, application to a specific organization, appropriate measures of success, the studies cited and what replies bring to peers. Posts that score well define the site's job as a business result, choose measures that track it and explain how search connects visitors to that result. Posts lose marks when they judge sites by color and style alone, list features without a purpose, ignore mobile visitors or reply to classmates without engaging their sites. A reply that suggests a measure a classmate has not considered, such as calls from the site, adds real value, as does one that spots a mobile problem the classmate missed.

MKT 635 Module 1 help: the mistakes that cost points

Choose an organization whose website you can study closely. Describe who visits it and why, using any data you can find, even rough figures. State the site's main job in one sentence as a business outcome. Then name two or three measures that would show whether it does that job, such as calls, form submissions or bookings, and how visitors reach it, such as search. Use research on usability or trust to explain what makes sites succeed. Avoid judging design by taste. Close by asking classmates what their sites' one job is, and reply with a measure they could add. A site with two competing jobs usually does neither well, so push gently when a classmate lists several.

Get MKT 635 Module 1 written to your instructions

Paste the MKT 635 Module 1 prompt and the website you will study. We define the site's main job, choose the measures that show whether it does that job and support the argument with research on website design and trust, ending with a question peers can test. Your opening post costs nothing; expect it in a couple of days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 635 papers and related MS in Marketing samples

MKT 635 Module 1 questions, answered

Where can I find a free MKT 635 Module 1 Discussion sample?

The complete MKT 635 Module 1 post on this page defines what a composite tree care company's website is for and how to judge whether it works.

What makes a business website effective?

Doing its main job, such as producing calls or orders, which depends on being found in search, loading quickly, being easy to navigate and earning visitors' trust.

How should a small business measure its website?

By business outcomes such as calls, quote requests or sales from the site, along with how visitors find it, rather than visits or time on site alone.

What builds trust in a website?

Research found the drivers vary by kind of site; navigation matters most for information-heavy sites, while privacy, fulfillment and brand strength matter more where risk or involvement is high.

Does website design affect business results?

Studies of corporate sites found design elements such as download speed, navigation, content and responsiveness were associated with user satisfaction, return visits and use.