| Course | MKT 635 Websites and Search Engine Marketing/ Search Engine Optimization |
|---|---|
| Module | Module 3 |
| Paper type | graduate milestone researching the searches customers use and auditing a website's search engine optimization, technical health and competitive position |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 635 Module 3
Searching for Tree Work: Keyword Research and an SEO Audit for Bluegrass Arbor Works
[Student Name]
Southern New Hampshire University
MKT 635: Websites and Search Engine Marketing/Search Engine Optimization
Milestone One: Keyword Research and SEO Audit
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Searching for Tree Work: Keyword Research and an SEO Audit for Bluegrass Arbor Works
Introduction
Bluegrass Arbor Works' website must be found before it can turn a search into a call. The usability review in Module 2 fixed what happens once visitors arrive. This milestone asks how they arrive: which searches lead homeowners to tree work, how valuable each is, where the site appears for them today and what is holding it back. It then compares the company with two competitors and ranks the fixes.
Where the Keywords Came From
Keywords were gathered from three sources: the office manager's log of how 200 callers described their problem, the words used in 140 of the company's reviews and competitors' reviews and search suggestions in Lexington. They were then expanded and sized with a keyword tool for the Lexington area. Callers rarely used the company's own terms. Nobody searched for "arboricultural services"; they searched for "tree fell on house," "dead tree removal," "how much to cut down a tree" and "tree trimming near me."
Keyword Groups
Keyword groups, Lexington area
| Group | Example searches | Est. monthly searches | Intent | Map results shown | Value per job |
|---|---|---|---|---|---|
| Storm emergency | tree fell on house, emergency tree removal, tree on power line | 90 to 900, spiking after storms | Urgent, call now | Yes | Very high |
| Removal | tree removal Lexington, dead tree removal, cut down tree | 600 | Hiring soon | Yes | High |
| Pruning and trimming | tree trimming near me, oak tree pruning | 450 | Hiring soon, seasonal | Yes | Medium |
| Stump grinding | stump grinding, stump removal cost | 250 | Hiring soon | Yes | Low to medium |
| Tree health | ash borer treatment, tree dying, arborist near me | 200 | Problem diagnosis | Mixed | Medium, leads to larger jobs |
| Cost questions | how much to remove a tree, tree trimming cost | 300 | Research | No | Indirect |
The storm group is small most months and enormous after a windstorm or ice storm, when the jobs are largest and homeowners call the first credible company they find.
Technical Audit
Phone pages take about six seconds to load. Most pages share the same title, "Bluegrass Arbor Works | Home," so search engines cannot tell them apart. All services sit on one long page, which means the site has no page specifically about tree removal, stump grinding or storm work. Image files are large and unlabeled. The site has no structured information about its location and hours, and two old pages from a former address are still indexed.
On-Page and Local Audit
For "tree removal Lexington," the company does not appear on the first page of organic results or in the map pack, the group of three local listings shown above them. It appears in the map pack for its own neighborhood and two adjacent ones only. Its map listing has the wrong hours, no service categories beyond "tree service" and 46 reviews against competitors' 180 and 320. Directory listings show two different phone numbers.
Competitors
A franchise tree service ranks in the top three organic results and the map pack for most removal and trimming searches, with a page for every service and every surrounding town. A local competitor with fewer staff ranks well for storm searches because it publishes a storm-day page with live availability. Neither displays certified arborists as prominently as they could, which is Bluegrass Arbor Works' natural advantage.
Why Organic Visibility Matters
Berman and Katona (2013) modeled competition for organic and sponsored results and showed that search engine optimization can improve ranking quality when a site's quality is positively related to its value to consumers, and that sponsored links give lower-quality sites a second route to clicks, reducing their incentive to invest in optimization and favoring higher-quality rivals. A company with certified arborists and strong reviews has reason to compete on merit in organic results rather than rely on ads alone.
Yang and Ghose (2010), studying several hundred keywords for a national retailer, found a positive interdependence between organic and paid results: an organic listing was associated with higher click-through on the firm's paid ad for the same keyword, and the reverse. Organic work and paid search should be planned together. Ghose et al. (2014), using about a million hotel search sessions and randomized experiments, found ranking position affected consumers' choices significantly. Being off the first page for "tree removal Lexington" means losing most of those homeowners.
Ranked Fixes
First, create separate pages for storm emergencies, removal, pruning, stump grinding and tree health, each with a unique title. Second, fix speed and mobile layout. Third, correct the map listing, add service categories and request reviews from every customer. Fourth, add location and hours markup and remove old indexed pages. Fifth, publish a plain cost guide that answers the price questions homeowners ask.
What the Audit Means for the Business
The searches in the removal, pruning and storm groups are the ones that bring the company its valuable work. A typical removal job runs between $1,200 and $3,500, and a storm job can exceed $8,000. If the company moved from outside the first page to the map pack and the top five organic results for removal searches, even capturing a small share of the roughly 600 monthly searches would mean several additional jobs a month. Storm searches matter even more: after the ice storm two winters ago, the company's phone rang constantly for a week, but its office manager estimates that half the calls came from existing customers. New customers searching that week found the franchise and the smaller competitor first. Being visible for storm searches before the next storm is worth more than any other fix in this audit.
Limits of the Audit
Keyword tools estimate volumes for a metropolitan area, not for the neighborhoods the company serves best, and storm searches are too irregular to estimate reliably. Rankings vary by the searcher's location and device, so the positions reported here come from searches run at the office and two other addresses. The audit cannot show how many searchers who did find the site went on to call, which is why call tracking appears in the paid search plan.
References
Berman, R., & Katona, Z. (2013). The role of search engine optimization in search marketing. Marketing Science, 32(4), 644-651. https://doi.org/10.1287/mksc.2013.0783
Ghose, A., Ipeirotis, P. G., & Li, B. (2014). Examining the impact of ranking on consumer behavior and search engine revenue. Management Science, 60(7), 1632-1654. https://doi.org/10.1287/mnsc.2013.1828
Yang, S., & Ghose, A. (2010). Analyzing the relationship between organic and sponsored search advertising: Positive, negative, or zero interdependence? Marketing Science, 29(4), 602-623. https://doi.org/10.1287/mksc.1090.0552
What the MKT 635 Module 3 instructions ask for
Milestone One in MKT 635 commonly asks you to conduct keyword research and audit your organization's website for search engine optimization. Expect to identify the searches customers use, estimate their volume and competition, group them by intent and match them to pages, then audit the site's technical health, on-page elements, content and, for local businesses, map listings and citations, and compare it with competitors. A strong milestone draws keywords from customers' language rather than the company's, distinguishes urgent, research and price-checking searches, uses tools for volumes and rankings where available and turns the audit into a ranked set of fixes tied to the most valuable searches.
How this MKT 635 Module 3 milestone one example is built
The sample groups searches for Bluegrass Arbor Works into emergency, removal, pruning, stump grinding, tree health and cost questions, with estimated monthly local volume, intent and competition. A technical audit finds six-second phone load times, missing page titles and one thin page covering every service. The on-page and local audit finds the company outside the first page for "tree removal Lexington" and absent from the map results in most neighborhoods. Two competitors are compared. Berman and Katona's analysis of search engine optimization, Yang and Ghose's evidence that organic and paid listings reinforce each other and Ghose, Ipeirotis and Li's study of ranking effects support a ranked list of fixes.
Where the MKT 635 Module 3 rubric puts the points
The first MKT 635 milestone is generally graded on thorough keyword research grounded in customer language, grouping by intent, a technical and on-page audit, local search coverage where relevant, competitor comparison, prioritized recommendations, plus citations and clarity. Submissions that stand out present keyword groups with volume, intent and target page, show audit findings with evidence and tie fixes to the most valuable searches. Submissions lose credit for keyword lists copied from a tool without grouping, ignoring intent or location, audits without evidence or recommending every possible fix at once. Showing which searches lead to the most valuable jobs adds judgment, and so does admitting where the tools' estimates are weak, such as storm searches that spike only a few days a year.
MKT 635 Module 3 help: the mistakes that cost points
Start with customers' words: ask staff what callers say, read reviews and use search suggestions, then expand with a keyword tool. Group searches by intent, such as urgent need, research, price checking and brand. Estimate volume and competition, and note whether results show map listings. Match each group to a page that should rank for it. Audit technical basics, such as speed, mobile layout, titles and indexing, then page content and local listings. Compare two competitors that rank well. Rank fixes by the value of the searches they serve, and explain why the top ones come first. Record today's rankings so the plan can show progress later.
Get MKT 635 Module 3 written to your instructions
Share the MKT 635 Milestone One brief and the site you are working on. We research the searches your customers use, group them by intent, audit technical health, pages and local listings, compare competitors and set priorities, with search research behind the choices. The first keyword milestone is written without charge and normally takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 635 papers and related MS in Marketing samples
- MKT 635 Module 1 Discussion: The Purpose of a Business Website
- MKT 635 Module 2 Website Usability Assignment: Website Usability and Design Evaluation
- MKT 635 Module 4 Discussion: Ad Position and Bidding in Paid Search
- MKT 635 Module 5 Content Optimization Assignment: On-Page SEO and Content Optimization
- MKT 635 Module 6 Milestone Two: Paid Search Campaign Plan
- MKT 635 Module 7 Discussion: Local Search, Map Listings and Reviews
- MKT 635 Module 8 Analytics and Testing Assignment: Web Analytics and Conversion Rate Testing
- MKT 635 Module 9 Discussion: Ethics in Search Marketing and Online Reviews
- MKT 635 Module 10 Final Project: Website and Search Marketing Plan
- QSO 500 Module 9 Final Project: The Research Proposal
- ACC 640 Module 5 Internal Control Assignment: Controls Over Online Sales
- BMB 630 Module 9 Milestone Three: The Campaign Calendar and Budget
- BMB 670 Module 5 Ethical Decision Assignment: Day Two in the Heat
MKT 635 Module 3 questions, answered
Where can I find a free MKT 635 Module 3 Milestone One sample?
The complete MKT 635 Milestone One on this page presents keyword research and an SEO audit for a composite tree care company, with ranked fixes.
How do I do keyword research for a local business?
Start with the words customers use, group searches by intent and location, estimate volume and competition with a tool and match each group to a page on the site.
What does an SEO audit include?
Technical health such as speed, mobile layout and indexing; on-page elements such as titles and content; local listings and citations; links; and a comparison with competitors.
Do organic and paid search results affect each other?
Research on a large retailer found a positive relationship: having an organic listing was associated with more clicks on its paid ads, and paid ads with more clicks on organic listings.
Why does search ranking position matter?
Studies of hotel search found ranking strongly affected what consumers chose and clicked, so appearing on the first page and near the top changes outcomes.