MKT 635 Module 8 Analytics and Testing Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 635 Module 8 Analytics and Testing sample sets up the measurement a website needs and uses controlled tests to improve how many visitors become customers. SNHU MKT 635 (MKT-635) asks MS in Marketing students to apply analytics and conversion testing to their own site. The site belongs to Bluegrass Arbor Works, a composite Lexington, Kentucky, tree care company. The assignment defines goals for calls, forms and photo uploads, adds call tracking and joins site data to booked jobs. It then reports two tests on the tree removal page: a three-field form against the old fourteen-field one and a fixed click-to-call bar, interpreting both with experiment research.

CourseMKT 635 Websites and Search Engine Marketing/ Search Engine Optimization
ModuleModule 8
Paper typegraduate assignment setting up web analytics and conversion tracking and designing and interpreting tests to improve a website's conversion rate
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 635 Module 8

1

Two Quote Forms and a Click-to-Call Button: Analytics and Testing for Bluegrass Arbor Works

[Student Name]

Southern New Hampshire University

MKT 635: Websites and Search Engine Marketing/Search Engine Optimization

Analytics and Testing Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe tracking setup, test results and job figures are composites prepared for this assignment.
2

Two Quote Forms and a Click-to-Call Button: Analytics and Testing for Bluegrass Arbor Works

Introduction

The usability review, content work and paid search plan all promise more calls and quote requests for Bluegrass Arbor Works. None of those promises can be checked unless the website measures what matters and connects it to the jobs the company actually books. This assignment sets up that measurement and reports the first two controlled tests, both on the new tree removal page.

What this page is doingExplains why measurement comes before more changes.
3

Goals

Three actions on the site lead to revenue: calling the company, submitting a quote form and uploading a photo of a tree with a question. Each is set up as a conversion goal. Page views and time on site are reported but not treated as success. A warning from Hanssens and Pauwels (2016) applies to small firms too: awareness-type, behavior-type and money-type numbers frequently point in different directions, so a firm proving its marketing works has to link them in one chain instead of listing them separately. For a tree service, the chain that matters runs from a search to a visit, a call or form, an estimate and a booked job; the measurement plan follows that chain all the way to the job.

What this page is doingDefines what counts as success.
4

Tracking Setup

Tracking setup

What is trackedHowWhere it is reported
Calls from the websiteTracked number shown on the site, different by traffic sourceCall log with source and duration
Calls from paid adsTracked number in adsAd account and call log
Calls from the map listingTracked number on the listingCall log
Quote forms and photo uploadsForm submissions as goals, with sourceAnalytics and office inbox
Booked jobsOffice records which call or form led to each estimate and jobMonthly spreadsheet joined to the call log

The office manager adds two columns to the existing job spreadsheet, source and inquiry date, which takes about a minute per job. Once a month the spreadsheet is joined with the call log and form data to show booked jobs and revenue by source.

What this page is doingConnects web data to booked jobs.
5

Current Performance

In the eight weeks after the new service pages launched, the tree removal page received about 1,900 visits, 74 percent on phones. Of those visitors, 1.9 percent submitted the old fourteen-field form and 3.1 percent tapped the phone number. About half of calls and a third of forms led to estimates, and about 55 percent of estimates became booked jobs.

What this page is doingReports the baseline.
6

Test One: The Quote Form

The practical rules in Kohavi et al. (2009) shaped the design: pick one success measure in advance, split traffic at random, let the test span full weeks and do not trust anyone's prediction of the winner, since in their experience such predictions miss often. The hypothesis was that asking for fewer details would raise form completions without lowering lead quality. For four weeks, visitors were randomly assigned to the old form, with fourteen fields including tree species and diameter, or a new form with three fields, name, phone and address, plus an optional photo upload.

Quote form test results, four weeks

VersionVisitorsForm completionsCompletion rateCompletions that led to estimates
Old form, 14 fields520101.9%3 of 10
New form, 3 fields and photo515244.6%9 of 24

The new form more than doubled completions. With about 500 visitors per version, a gap this size would arise by chance only about one time in a hundred. Lead quality held: the share of forms that led to estimates was similar, and 17 of the 24 new-form submitters attached a photo, which the arborists said was more useful than the old form's species field.

What this page is doingTests a shorter form.
7

Test Two: Click-to-Call Bar

The second test, run in the following four weeks on phone visitors only, compared the page with its phone number in the header against a version with a call bar fixed to the bottom of the screen reading "Call a certified arborist." The share of phone visitors who called climbed from just over 3 percent to just over 4 percent, roughly a third more. The difference is smaller than the form test's and its margin of error wider, so the result will be confirmed with another four weeks before the bar is added to every page.

What this page is doingTests a fixed call button on phones.
8

Interpreting the Results

Hauser et al. (2009) showed that websites perform better when their look and feel match visitors' cognitive styles, and that different visitors prefer different levels of detail and guidance. Homeowners with a tree problem mostly want a quick, human answer; a long form asks them to do the arborist's job. The call bar served the many visitors who simply wanted to talk to someone. Neither result means that detail is bad; the removal page still offers long explanations for visitors who want them. The tests show that the path to contact should be short for everyone.

What this page is doingConsiders why the changes worked.
9

What the Owner Learned

The tests changed how the owner thinks about the website. Before, decisions about the site were made by whoever had the strongest opinion, usually the owner himself, who had insisted the long form helped the arborists prepare. The results showed that the long form cost about half the leads it could have produced, and that the arborists preferred photos anyway. More important, the owner now has a routine for settling disagreements: write the hypothesis, split the traffic, wait four weeks and look at booked jobs, not opinions. The office manager's two extra spreadsheet columns, which she first considered a chore, turned out to be the piece that made the results believable, because they showed the extra form submissions became real estimates.

What this page is doingNotes a change in how decisions are made.
10

Next Steps

The short form and call bar will roll out across all service pages, with the call bar confirmed first. The next tests will compare two versions of the storm emergency page and two placements of reviews on the removal page. A third will test whether showing the arborists' photos beside the form changes completion, since the usability review found homeowners wanted to know who would come to their house. Each test will have a written hypothesis, a minimum of four weeks and a decision rule set in advance.

What this page is doingSets the next tests.
11

References

Hanssens, D. M., & Pauwels, K. H. (2016). Demonstrating the value of marketing. Journal of Marketing, 80(6), 173-190. https://doi.org/10.1509/jm.15.0417

Hauser, J. R., Urban, G. L., Liberali, G., & Braun, M. (2009). Website morphing. Marketing Science, 28(2), 202-223. https://doi.org/10.1287/mksc.1080.0459

Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1

What the MKT 635 Module 8 instructions ask for

The Module 8 assignment in MKT 635 usually asks you to set up or evaluate web analytics for your organization and to use data and testing to improve the website's performance. Expect to define conversion goals, describe how they will be tracked, analyze current performance and design or interpret an A/B test or other experiment. A strong assignment chooses goals that reflect business outcomes, connects website data to what happens offline where relevant, such as calls that become sales, designs tests with a clear hypothesis, enough visitors and a decision rule, and interprets results with attention to chance and side effects. It explains what the organization will do next based on the results, including the next test in line.

How this MKT 635 Module 8 analytics and testing assignment example is built

The sample sets up measurement for Bluegrass Arbor Works, a composite Lexington tree care company: goals for calls, quote forms and photo uploads, tracked numbers for each traffic source and a monthly dashboard joining site data with the office's record of which inquiries became booked jobs. Two tests follow on the tree removal page. A three-field form raised completion from 1.9 to 4.6 percent of visitors against the old fourteen-field form, with lead quality holding, and a fixed click-to-call bar raised calls by about a third. Kohavi and colleagues on online experiments, Hauser and colleagues on matching sites to visitors and Hanssens and Pauwels on tying measures to business value guide the interpretation.

Where the MKT 635 Module 8 rubric puts the points

Analytics and testing assignments in MKT 635 are commonly graded on goals tied to business outcomes, a sound tracking setup including offline results, the quality of test design, careful interpretation including chance and side effects, recommendations, and sources and clarity. Strong work explain each goal's link to revenue, report tests with sample sizes and confidence, check lead quality as well as quantity and set the next test. Submissions lose credit for tracking page views as success, declaring winners from tiny samples, ignoring whether more leads became more jobs or changing several things in one test so the cause of any gain stays unknown.

MKT 635 Module 8 help: the mistakes that cost points

Start by listing the actions on your site that lead to revenue, then make each a tracked goal. If sales happen offline, find a way to connect them, such as call tracking and a simple record of which inquiries became sales. Look at current performance by page and source. Choose one change with a clear reason to expect improvement, write the hypothesis and run a test that splits visitors randomly, long enough to cover weekly cycles. Report results with numbers and some measure of uncertainty, and check side effects such as lead quality. If a result is close, extend the test rather than declaring a winner. Say what you will do next and what you will test after that.

Get MKT 635 Module 8 written to your instructions

Send the MKT 635 Module 8 guidelines and what your site tracks today. We define the goals that matter, set up tracking that reaches real sales, design and interpret controlled tests and explain the results with research on experiments and measurement. We write your first analytics assignment at no cost; allow roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 635 papers and related MS in Marketing samples

MKT 635 Module 8 questions, answered

Where can I find a free MKT 635 Module 8 analytics and testing sample?

This page has the full MKT 635 Module 8 assignment on conversion tracking and two A/B tests for a composite tree care company's website.

What is conversion rate optimization?

Improving the share of website visitors who take a valuable action, such as calling or requesting a quote, usually by testing changes against the current version.

How do you run an A/B test on a website?

Split visitors randomly between the current version and a changed version, run the test long enough to cover weekly cycles, then compare conversion with attention to chance.

Do shorter forms get more leads?

Often, because each field adds effort; but a shorter form should be tested and checked for lead quality, since some fields help a business qualify inquiries.

How can a local business connect web data to sales?

With tracked phone numbers, form tracking and a simple record of which calls and forms became booked jobs, reviewed together each month.