MKT 635 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 635 Module 4 Discussion sample asks whether the top paid search position is worth what it costs, using research rather than agency rules of thumb. SNHU MKT 635 (MKT-635) uses this module to have MS in Marketing students test bidding habits against published evidence. The case is an agency recommendation that Bluegrass Arbor Works, a composite tree care company in Lexington, Kentucky, bid for the top ad on every tree service search at up to $14 a click. The post argues that the top slot buys more clicks but not always more profitable jobs, that position matters less for specific searches and that ads and organic listings work together, then proposes a test.

CourseMKT 635 Websites and Search Engine Marketing/ Search Engine Optimization
ModuleModule 4
Paper typegraduate discussion post on whether the top paid search position is worth its cost, using research on position effects and profitability
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 635 Module 4

1

Module Four Discussion

Is the Top Ad Worth It?

An agency pitching Bluegrass Arbor Works recommends bidding for the top paid position on every tree service search in Lexington, at up to $14 a click. Its argument is simple: the top ad gets the most clicks, and clicks become calls. The company's current search budget is about $1,500 a month, which at $14 a click would buy roughly a hundred clicks.

What this page is doingThe agency's advice.
2

In a deliberate bid experiment run by Agarwal et al. (2011) with a retailer, slipping down a slot cost some clicks, yet the people who still clicked bought at higher rates, most of all on detailed queries, and the highest slot often made less money than the ones beneath it. Searchers who scroll past the first ad to click the second or third may be comparing more carefully and more ready to act. For a tree service, a homeowner who reads two ads and chooses the one that mentions certified arborists may be exactly the customer the company wants.

Narayanan and Kalyanam (2015), using a regression discontinuity design to separate the true effect of position from the bidding that determines it, found real position effects on clicks that varied with the advertiser and the search, being smaller where searches were more specific and where consumers already knew the advertiser. "Emergency tree removal Lexington" is specific; "tree service" is broad.

What this page is doingMore clicks, not always more jobs.
3

Yang and Ghose (2010) found that a firm's organic listing and its paid ad on the same search were associated with more clicks on each other. As the SEO work in Milestone One lifts the company's organic ranking, the extra value of the very top ad should shrink.

What this page is doingAds and organic listings together.
4

I would bid for positions two to three on broad searches and for the top on storm searches, where speed decides the job, then compare cost per booked job across the two approaches for eight weeks. If the top slot on removal searches brings enough extra jobs to cover its higher cost, the agency is right and the bids go up; if not, the savings pay for the storm campaign.

What this page is doingA test before a rule.
5

How does your organization decide what position to bid for, and what would change your mind?

What this page is doingYour bids.
6

References

Agarwal, A., Hosanagar, K., & Smith, M. D. (2011). Location, location, location: An analysis of profitability of position in online advertising markets. Journal of Marketing Research, 48(6), 1057-1073. https://doi.org/10.1509/jmr.08.0468

Narayanan, S., & Kalyanam, K. (2015). Position effects in search advertising and their moderators: A regression discontinuity approach. Marketing Science, 34(3), 388-407. https://doi.org/10.1287/mksc.2014.0893

Yang, S., & Ghose, A. (2010). Analyzing the relationship between organic and sponsored search advertising: Positive, negative, or zero interdependence? Marketing Science, 29(4), 602-623. https://doi.org/10.1287/mksc.1090.0552

What the MKT 635 Module 4 instructions ask for

The fourth MKT 635 discussion typically asks you to consider a paid search decision, such as bidding strategy, ad position, keyword match types or how paid and organic search interact. Expect to take a position for your organization and support it with research on how search advertising works. Strong posts separate clicks from profitable outcomes, recognize that different searches behave differently, such as broad versus specific or branded versus generic, and propose a test rather than relying on rules of thumb from platforms or agencies. They connect the paid decision to the organization's organic visibility, since the two appear on the same page.

How this MKT 635 Module 4 discussion example is built

The sample responds to an agency's advice that Bluegrass Arbor Works, a composite Lexington tree care company, bid for the top ad on every tree service search at up to $14 a click. a bid experiment by Agarwal, Hosanagar and Smith in which lower slots drew fewer but better-converting clicks, Narayanan and Kalyanam's causal estimates of position effects and Yang and Ghose's evidence that paid and organic listings reinforce one another shape the argument. The post proposes bidding for positions two to three on broad searches, the top on storm searches, and testing the difference for eight weeks, then asks classmates how their bids are set.

Where the MKT 635 Module 4 rubric puts the points

The paid search discussion in MKT 635 is commonly marked on a clear position on the bidding question, use of research on position and search behavior, attention to profit rather than clicks, a practical test and the quality of the exchange with peers. The strongest posts distinguish kinds of searches, explain why the top position may or may not pay and propose a test with a measure. Posts lose credit for repeating platform advice, judging success by click-through rate alone, treating every keyword the same or replying to classmates with nothing beyond agreement. A reply that asks what a classmate's cost per customer is at each position moves the thread forward, especially when it suggests one search where a lower slot might pay better.

MKT 635 Module 4 help: the mistakes that cost points

Describe the bidding question your organization faces, with the actual searches and costs if you can. Separate searches by type: broad or specific, urgent or researching, branded or generic. Use research on how position affects clicks, conversions and profit. Consider how your organic listings on the same searches change the value of an ad. Propose a test, such as bidding for different positions on similar searches for several weeks, and say what you will measure: calls, quotes, jobs and cost per job. Avoid treating click-through rate as success. Ask classmates how their organizations set bids, and when you reply, ask what a booked customer costs them at their current position.

Get MKT 635 Module 4 written to your instructions

Paste the MKT 635 Module 4 prompt and your current bidding approach. We compare what each ad slot costs with what it brings in, draw on published bidding studies, design a test your organization could run and close by asking peers how they bid. The first post is free, and most arrive within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 635 papers and related MS in Marketing samples

MKT 635 Module 4 questions, answered

Where can I find a free MKT 635 Module 4 Discussion sample?

This page has the complete MKT 635 Module 4 post weighing whether a tree service should pay for the top search ad, with research on position and profit.

Is the top position in search ads always best?

Not necessarily; in a retailer's bid experiment, clicks thinned out further down the page but buyers grew more likely to purchase, and the first slot was often not the moneymaker.

Do paid search ads help organic listings?

Research found positive interdependence: a firm's organic listing was associated with more clicks on its paid ad for the same search, and the paid ad with more organic clicks.

Does ad position matter more for some searches than others?

Studies of position effects found they vary, with position mattering less for more specific searches and for advertisers consumers already know.

How should a small business test paid search bids?

Bid for different positions on similar searches or in different weeks, then compare calls, quotes, jobs and cost per job rather than clicks alone.