| Course | MKT 635 Websites and Search Engine Marketing/ Search Engine Optimization |
|---|---|
| Module | Module 6 |
| Paper type | graduate milestone planning a paid search campaign: structure, keywords, match types, ads, landing pages, budget, bidding, tracking and tests |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 635 Module 6
The Paid Search Plan: Milestone Two for Bluegrass Arbor Works
[Student Name]
Southern New Hampshire University
MKT 635: Websites and Search Engine Marketing/Search Engine Optimization
Milestone Two: Paid Search Campaign Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Paid Search Plan: Milestone Two for Bluegrass Arbor Works
Introduction
Milestone One grouped the searches that bring tree work to Bluegrass Arbor Works and found the company invisible for most of them. The content work in Module 5 is building pages that can rank, but organic results take months. Paid search fills the gap now and stays useful afterward for the most valuable and urgent searches. This milestone plans the campaign: structure, keywords, ads, landing pages, budget, bids, tracking and tests.
Campaign Structure
Campaign structure
| Campaign | Example keywords | Landing page | Bidding aim | Share of budget |
|---|---|---|---|---|
| Storm emergency | emergency tree removal, tree fell on house, storm tree service Lexington | Storm emergency page with tap-to-call | Top position, raised during warnings | 25%, rising in storms |
| Removal | tree removal Lexington, dead tree removal, tree removal near me | Tree removal page | Positions 2 to 3 | 35% |
| Pruning and trimming | tree trimming Lexington, oak pruning, tree trimming service | Pruning page | Positions 2 to 3, seasonal | 20% |
| Tree health | ash tree treatment, tree dying, arborist near me | Tree health page | Positions 2 to 4 | 12% |
| Branded | Bluegrass Arbor Works, Bluegrass Arbor | Home page | Tested before keeping | 8% |
Keywords use phrase and exact match, with broad match only in a small test group. Negative keywords block searches containing "jobs," "salary," "how to," "DIY," "firewood," "free" and "rental," along with the names of other towns outside the service area.
Storm Triggers
Storm searches are rare most of the time and urgent when they come. The storm campaign runs at a low daily budget normally and is raised automatically when the National Weather Service issues high wind, severe thunderstorm or ice storm warnings for Fayette and surrounding counties, using an automated rule linked to the warnings. During those periods it bids for the top position, because a homeowner with a tree on the roof calls the first credible company they see. The ads say "24-hour storm response" and send visitors to a page with a single large call button.
Ad Copy
Every non-branded ad mentions certified arborists, since no franchise competitor leads with credentials and the usability test showed homeowners care about qualifications and insurance. Removal ads read, for example, "Tree Removal by Certified Arborists | Licensed and Insured in Lexington | Free Written Quotes." Pruning ads emphasize tree health. Two versions of each ad run at once so the better one can be identified within a few weeks.
Bidding and Position
In a retailer's keyword records analyzed by Ghose and Yang (2009), the words in a query, for instance whether it named a brand or the store, and the slot an ad held each shifted how often people clicked, how often they bought and what a click cost. That supports bidding differently by campaign rather than buying the top slot everywhere: urgent storm searches justify the top position, while removal and pruning searches, where homeowners compare companies, are bid for positions two and three, as proposed in Module 4.
A finding from Rutz and Bucklin (2011) cuts the other way: in a hotel group's data, clicks on broad, unbranded ads were followed by extra searches for the hotel's own name, so a generic campaign quietly feeds the branded one. The removal and pruning campaigns may therefore deserve credit for some branded searches, which matters when deciding what the generic campaigns are worth.
Branded Search
Blake et al. (2015) turned eBay's name ads off in some regions and saw sales barely change, since shoppers who typed the name found the unpaid link right below. Bluegrass Arbor Works is far smaller and has competitors who could bid on its name, so the answer may differ. The branded campaign will run for four weeks and then pause for four weeks, with branded clicks, calls and booked jobs compared across the two periods.
Budget and Target
The monthly budget is $2,400, up from $1,500, with the storm campaign allowed to exceed its share during warnings. A booked removal or pruning job is worth on average about $1,400 in revenue and about $420 in contribution after crew and equipment costs. The target is a cost per booked job of no more than $95, which leaves a healthy return even if some booked jobs are smaller than average.
Ad Extensions and Schedule
Each ad shows the company's phone number as a call extension, its address as a location extension and sitelinks to the storm, removal, pruning and tree health pages. Call extensions run only during office hours for removal and pruning, when someone can answer, and around the clock for storm ads, when an on-call arborist answers. The removal and pruning campaigns run from early morning until late evening; late-night searches are mostly storm emergencies, which have their own campaign. Pruning ads increase in late winter and early spring, the best time for pruning many species and the season when homeowners plan yard work. Removal ads hold steady through the year, with a small increase in fall, when homeowners notice dead trees after leaves drop.
What Happens When Calls Come In
A paid search plan is only as good as the phone answering it. The office manager answers most calls, but during storms the call volume can triple. The plan adds an after-hours answering service trained to take storm details and dispatch the on-call arborist, and a simple script for weekday calls that ends with a scheduled estimate rather than a promise to call back. Without those changes, the storm campaign would pay for calls that go to voicemail, which in storm conditions means the homeowner calls the next company on the list.
Tracking
Every campaign shows a tracked phone number in its ads and on its landing page, and the office records whether each call became a quote and whether each quote became a booked job. Form submissions are tracked the same way. The account reports cost per call, per quote and per booked job by campaign each week.
Tests and Rules
Three tests run in the first quarter: position two versus position one on removal searches, the branded on-off test and two ad versions per group. Each has a decision rule set in advance; for example, if position one costs more than 30 percent more per booked job than position two with no increase in jobs, the removal campaign stays at position two.
References
Blake, T., Nosko, C., & Tadelis, S. (2015). Consumer heterogeneity and paid search effectiveness: A large-scale field experiment. Econometrica, 83(1), 155-174. https://doi.org/10.3982/ECTA12423
Ghose, A., & Yang, S. (2009). An empirical analysis of search engine advertising: Sponsored search in electronic markets. Management Science, 55(10), 1605-1622. https://doi.org/10.1287/mnsc.1090.1054
Rutz, O. J., & Bucklin, R. E. (2011). From generic to branded: A model of spillover in paid search advertising. Journal of Marketing Research, 48(1), 87-102. https://doi.org/10.1509/jmkr.48.1.87
What the MKT 635 Module 6 instructions ask for
Milestone Two in MKT 635 usually asks you to plan a paid search campaign for your organization. Expect to define campaign and ad group structure, choose keywords, match types and negative keywords, write ad copy, select landing pages, set a budget and bidding approach and explain how conversions will be tracked and the campaign improved. A strong plan builds campaigns around groups of searches with different intent and value, gives urgent or high-value searches priority, leads ads with the organization's real advantage, sends each ad to the most relevant page, tracks the outcomes that matter, including calls for local businesses, and includes tests rather than fixed assumptions.
How this MKT 635 Module 6 milestone two example is built
The sample plans five campaigns for Bluegrass Arbor Works, a composite Lexington tree care company: storm emergency, removal, pruning and trimming, tree health and a small branded campaign. Storm ads switch on when the weather service issues wind or ice warnings and bid for the top position; removal and pruning ads aim for positions two and three; branded ads are tested before being kept. Negative keywords block job seekers, do-it-yourself and firewood searches. Ads lead with certified arborists and send visitors to the new service pages. The $2,400 monthly budget, call tracking, an after-hours answering service and a $95 cost-per-booked-job target follow, supported by three studies of search advertising.
Where the MKT 635 Module 6 rubric puts the points
The second MKT 635 milestone is generally graded on campaign structure aligned with search intent, keyword and negative keyword choices, ad copy and landing pages, a justified budget and bidding approach, tracking of meaningful conversions, a plan for testing and improvement plus sources and clear writing. Good submissions put the campaign structure in a table, explain bidding differences by campaign and set a target cost per customer or job. Submissions lose credit for a single campaign stuffed with every keyword, no negatives, ads that repeat the company name without a reason to click, sending all traffic to the home page or measuring clicks rather than calls and sales.
MKT 635 Module 6 help: the mistakes that cost points
Build campaigns from your keyword groups, separating searches by intent and value. For each, list keywords with match types and the negative keywords that block wasted clicks. Write two or three ads per group that lead with your real advantage and include a clear action. Send each group to its most relevant page. Set a budget from what a customer is worth and what you can afford, and explain your bidding approach by campaign. Track the outcome that matters, such as calls, quotes or bookings, not just clicks. Include at least one test and the rule for acting on its result. Check that the people answering the phone are ready for the calls the ads will bring.
Get MKT 635 Module 6 written to your instructions
Upload the MKT 635 Milestone Two brief with your keyword research. We structure the campaigns, choose keywords, match types and negatives, write ads, match landing pages, set budget and bids and design tracking and tests, all supported by research on search advertising. The first paid search plan is free and typically finished in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 635 papers and related MS in Marketing samples
- MKT 635 Module 1 Discussion: The Purpose of a Business Website
- MKT 635 Module 2 Website Usability Assignment: Website Usability and Design Evaluation
- MKT 635 Module 3 Milestone One: Keyword Research and SEO Audit
- MKT 635 Module 4 Discussion: Ad Position and Bidding in Paid Search
- MKT 635 Module 5 Content Optimization Assignment: On-Page SEO and Content Optimization
- FIN 700 Module 1 Discussion: Capital Allocation as the Finance Leader's Main Job
- ACC 692 Module 6 Milestone Two: Rights, Warnings and Evidence That Will Hold
- FIN 685 Module 1 Discussion: Why a Roaster Should Hedge at All
- INT 640 Module 7 Marketing Program Assignment: Selling Cottages to Ontario Homeowners
MKT 635 Module 6 questions, answered
Where can I find a free MKT 635 Module 6 Milestone Two sample?
This page carries the complete MKT 635 Milestone Two paid search plan for a composite tree service, with campaign structure, budget, tracking and tests.
How should a paid search campaign be structured?
Around groups of searches with similar intent and value, each with its own keywords, negative keywords, ads, landing page, budget and bidding approach.
What are negative keywords?
Terms that stop ads from showing on irrelevant searches, such as job, free or do-it-yourself, saving money for searches likely to become customers.
How do local businesses track paid search results?
With tracked phone numbers on ads and landing pages, form tracking and a record of which calls became booked jobs, since many customers call rather than buy online.
Should a small business pay for ads on its own name?
It is worth testing; experiments at a large online marketplace found brand-name ads added little, though results can differ when competitors bid on the name.