MKT 635 Module 2 Website Usability Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 635 Module 2 Website Usability sample evaluates a website by watching people try to use it for the tasks that matter to the business. SNHU MKT 635 (MKT-635) has MS in Marketing students review usability, design and trust before working on search. The site belongs to Bluegrass Arbor Works, a composite tree care company in Lexington, Kentucky. Eight local homeowners tried five tasks on their phones, from finding the emergency number after a storm to requesting a pruning quote. The emergency number was hidden behind a menu, the quote form took eleven taps and pages loaded slowly. Research on website performance and online trust shapes eight prioritized fixes.

CourseMKT 635 Websites and Search Engine Marketing/ Search Engine Optimization
ModuleModule 2
Paper typegraduate assignment evaluating a website's usability, design, mobile performance and trust signals against its purpose, with prioritized fixes
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 635 Module 2

1

Eleven Taps to a Quote: A Usability Review of the Bluegrass Arbor Works Website

[Student Name]

Southern New Hampshire University

MKT 635: Websites and Search Engine Marketing/Search Engine Optimization

Website Usability Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe test participants, times and findings are composites created for this assignment.
2

Eleven Taps to a Quote: A Usability Review of the Bluegrass Arbor Works Website

Introduction

The Module 1 discussion defined the Bluegrass Arbor Works website's job as turning searches into calls and quote requests. This assignment tests how well it does that job. Eight homeowners in Lexington, recruited through a neighborhood association and paid with a gift card, each tried five tasks on their own phones while a facilitator watched and timed them. Page speed and accessibility were measured separately with free tools.

What this page is doingStates the purpose and method.
3

The Tasks

The five tasks came from the owner's account of why customers call and from the most visited pages. Task one: a storm has dropped a limb on your roof; find how to reach the company now. Task two: request a quote for pruning a large oak. Task three: find out whether the company is insured. Task four: find out what a certified arborist is and whether this company has one. Task five: see examples of work similar to yours.

What this page is doingLists what visitors come to do.
4

Results

Task results, eight participants on phones

TaskCompletedMedian timeMedian tapsMain problem
Find emergency contact6 of 848 seconds5Phone number only in the footer and behind the menu
Request a pruning quote5 of 83 minutes 40 seconds11Form has 14 fields, including "tree species"
Check insurance3 of 81 minute 55 seconds7Mentioned only on the About page, in a paragraph
Learn about arborists2 of 82 minutes 10 seconds8No mention of certification anywhere
See similar work7 of 81 minute 5 seconds4Gallery loads slowly; photos unlabeled

Two participants gave up on the emergency task and said they would have called a competitor whose number appeared in search results. Three abandoned the quote form; one said, "I don't know what species my tree is, that's why I'm calling you." Only two found any sign that the company employs certified arborists, which surprised the owner, since it is the company's main advantage over cheaper crews.

What this page is doingReports what happened.
5

Speed and Accessibility

Home and service pages took about six seconds to load fully on a typical phone connection, held back by large uncompressed photos and an old slideshow. Body text was small on phones, several buttons were too close together to tap reliably and some photos lacked text descriptions for screen readers. The site worked on computers but had clearly been designed for them.

What this page is doingMeasures the technical basics.
6

Interpreting the Results

Palmer (2002), developing and validating website measures across three studies, found that download delay, navigability, content, interactivity and responsiveness were associated with user satisfaction, return visits and frequency of use. The test touched each: slow pages, a hidden phone number, missing content on credentials and a form that asks for information visitors do not have.

In the trust model that Bart et al. (2005) tested on thousands of shoppers across eight kinds of websites, the factors that build confidence shifted with the category, with navigation most important for information-heavy sites and brand strength critical for high-involvement categories, and that trust partly mediates the link between site characteristics and behavioral intent. Hiring a crew to work with chainsaws above one's house is high-involvement and high-risk. Homeowners look for evidence the company is insured, qualified and local, and the site hides all three.

What this page is doingApplies research.
7

Recommendations

Prioritized fixes

PriorityFixEffortMeasure
1Tap-to-call button fixed at the top of every page, with "24-hour storm service"LowCalls from the site
2Quote form cut to name, phone, address and a photo uploadLowForm completions
3Certified arborists, insurance and local address shown on every pageLowTask success in retest
4Compress photos and remove slideshow to load pages in under 3 secondsMediumPage speed; bounce rate
5Plain explanation of what an arborist does, with staff photosLowTime on page; calls
6Label gallery photos by service and neighborhoodLowGallery to quote rate
7Larger text and buttons, alt text for photosMediumAccessibility check
8Separate storm emergency page for urgent searchesMediumCalls during storms
What this page is doingRanks the fixes.
8

What Participants Said

The comments participants made while working through the tasks were as revealing as the times. Several said the site "looked like a small company," which they did not mind; what bothered them was uncertainty. One retired teacher, trying to check insurance, said she would never let a crew near her house without proof of coverage and could not believe it was so hard to find. A young father looking for the emergency number said he would have called whoever showed up first in the search results, because "when a tree is on the roof you're not shopping." Two participants liked the gallery but wanted to know which neighborhoods the photos were from, since seeing a familiar street would reassure them. Nobody commented on fonts or colors. The things they wanted were all information the company already has: its certifications, its insurance, its phone number and proof that it works nearby.

What this page is doingAdds their words to the numbers.
9

What the Owner Expected

Before the test, the owner predicted that participants would complain about the site's age and its color scheme. He was surprised that none did, and that the problems were simpler and cheaper to fix than a redesign. That is a common outcome of usability testing: the issues that cost a business customers are often small barriers on the path to contact, not the look of the site. The finding changes the budget question. Instead of a full redesign at about $18,000, the most important fixes can be made for a fraction of that, with the redesign deferred until the cheaper fixes are measured.

What this page is doingCompares assumptions with results.
10

Testing the Fixes

Kohavi et al. (2009), drawing on extensive experience with online experiments, cautioned that many changes expected to help have no effect or hurt, and recommended controlled tests to settle such questions. Some fixes, such as making the phone number visible, are so clearly right that they should simply be made. Others, such as the shorter form, will be tested against the current one by sending half of visitors to each version for several weeks. The usability test will be repeated with new participants after the fixes.

What this page is doingExplains how results will be checked.
11

References

Bart, Y., Shankar, V., Sultan, F., & Urban, G. L. (2005). Are the drivers and role of online trust the same for all web sites and consumers? A large-scale exploratory empirical study. Journal of Marketing, 69(4), 133-152. https://doi.org/10.1509/jmkg.2005.69.4.133

Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1

Palmer, J. W. (2002). Web site usability, design, and performance metrics. Information Systems Research, 13(2), 151-167. https://doi.org/10.1287/isre.13.2.151.88

What the MKT 635 Module 2 instructions ask for

The Module 2 assignment in MKT 635 typically asks you to evaluate the usability and design of your organization's website. Expect to assess navigation, content, page speed, mobile experience, accessibility and the elements that build trust, and to recommend improvements. A strong evaluation begins with the tasks visitors come to complete, tests those tasks with real people or careful walkthroughs, measures what it can, such as task success, time and load speed, and ranks recommendations by their likely effect on the site's purpose. It goes beyond personal opinion about design and includes the mobile experience, since many visitors now arrive on phones.

How this MKT 635 Module 2 website usability assignment example is built

The sample evaluates Bluegrass Arbor Works' website with five tasks tested on phones by eight Lexington homeowners: find the emergency number after a storm, request a pruning quote, check whether the company is insured, find out what an arborist is and see past work. It measures task success, time and taps, page speed and accessibility. The emergency number sits behind a menu, the quote form needs eleven taps and fourteen fields, pages load in about six seconds on a phone and the arborists' certifications are invisible. Palmer's website performance measures, Bart and colleagues' findings on trust in high-involvement categories and Kohavi and colleagues on testing changes inform eight prioritized fixes.

Where the MKT 635 Module 2 rubric puts the points

Usability assignments in MKT 635 are usually graded on an evaluation organized around the site's purpose and visitors' tasks, use of evidence such as testing and speed measures, coverage of navigation, content, mobile and trust, prioritized recommendations, and the sources and prose. Good submissions report task results in a table, explain what each problem costs the business and rank fixes. Submissions lose marks for opinions about color and fonts, recommendations without priority, ignoring phones or accessibility or claiming changes will work without suggesting how to test them. Linking each fix to a measure that will show whether it helped earns credit, and so does estimating what each problem costs in lost calls.

MKT 635 Module 2 help: the mistakes that cost points

List the three to five tasks visitors most often come to do, starting with the one that makes money. Test them with a few real people if you can, on phones as well as computers, and record success, time and the number of taps or clicks. Measure page speed with a free tool. Check whether the site shows the trust signals visitors in your category look for. Note accessibility basics such as text size and contrast. Write each problem as a finding with evidence and its likely cost. Rank the fixes by effect and effort, and say how you will check that each one worked. Quotes from participants, used sparingly, make the findings hard to dismiss.

Get MKT 635 Module 2 written to your instructions

Send the MKT 635 Module 2 instructions and the site you are evaluating. We test it against the tasks that matter to the business, measure speed, navigation and trust signals on phones and desktops and rank the fixes, with research on usability and online trust. Your first usability paper is free and generally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 635 papers and related MS in Marketing samples

MKT 635 Module 2 questions, answered

Where can I find a free MKT 635 Module 2 website usability sample?

This page includes the full MKT 635 Module 2 usability review of a composite tree care company's website, with task tests on phones and eight ranked fixes.

How do you evaluate website usability?

Have real people try the tasks visitors come to do, measure success, time and effort, check speed and mobile performance and note where people get stuck or lose trust.

How many people are needed for a usability test?

Small tests with five to eight participants often reveal the most common problems, which is enough to guide fixes before larger tests.

What are trust signals on a website?

Elements that reassure visitors, such as credentials, insurance, real photos, reviews, a physical address and clear contact information, especially important for high-risk services.

Why does mobile usability matter?

Most visitors to many local business sites arrive on phones, so slow pages, tiny buttons or hidden phone numbers lose customers before they ever call.