MKT 635 Module 10 Final Project Example

Reviewed by Portia Lambrick, MBA

This MKT 635 Module 10 Final Project sample is a complete website and search engine marketing plan for one organization. For SNHU MKT 635 (MKT-635), MS in Marketing students finish with this plan, which pulls the audits, keyword research, content, paid search, local search and testing from earlier modules into one strategy. The organization is Bluegrass Arbor Works, a composite Lexington, Kentucky, tree care company whose certified arborists were nearly invisible in search. The plan defines the site's job, fixes usability, builds service pages around customers' searches, runs paid search with storm-triggered ads, strengthens the map listing and reviews and measures everything against booked jobs.

CourseMKT 635 Websites and Search Engine Marketing/ Search Engine Optimization
ModuleModule 10
Paper typegraduate final project presenting a complete website and search engine marketing plan: audit, keywords, site improvements, SEO and content, paid search, local search, measurement and budget
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 635 Module 10

1

From Search to Saw: A Website and Search Marketing Plan for Bluegrass Arbor Works

[Student Name]

Southern New Hampshire University

MKT 635: Websites and Search Engine Marketing/Search Engine Optimization

Final Project: Website and Search Marketing Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe tree company, its website and all numbers in this plan are invented.
2

From Search to Saw: A Website and Search Marketing Plan for Bluegrass Arbor Works

Summary

Bluegrass Arbor Works does excellent tree work, employs three certified arborists and is rated 4.6 stars, yet homeowners searching for tree removal in Lexington rarely find it. Its website, built in 2014, hid its phone number on phones, asked fourteen questions to request a quote and put every service on one page with a generic title. It appeared in the map results only in its own neighborhood and spent its small search budget on ads for its own name.

This plan gives the website one job, turning searches into calls and quote requests, and organizes everything around the searches homeowners make. It fixes the site's usability and speed, builds separate pages for removal, pruning, stumps, tree health and storm emergencies, strengthens the map listing and asks every customer for a review, and runs paid search that switches on with storm warnings and bids for the slots that produce the most booked jobs. The first tests already doubled quote form completions. First-year spending comes to roughly $46,000, and aims to double booked jobs from search within twelve months, measured through call tracking joined to the company's job records.

What this page is doingThe plan in brief for the family owners.
3

The Site's Job and Its Problems

Palmer (2002) linked five design qualities, speed, ease of moving around, content, interactivity and responsiveness, to whether people were satisfied and came back. The usability test with eight local homeowners exposed all five problems: six-second pages on phones, an emergency number behind a menu, a quote form that asked for a tree's species, no mention of the arborists' certifications and a gallery without labels. The fixes were cheap and are mostly complete: a call bar on every page, a three-field form with photo upload, credentials and insurance on every page and pages that load in under three seconds.

What this page is doingRestates the starting point.
4

Keywords and Pages

Keyword research drew on callers' words, reviews and search tools. Six groups matter: storm emergencies, removal, pruning, stump grinding, tree health and cost questions. Removal searches number about 600 a month in the Lexington area, and storm searches spike after high winds and ice. Each group now has its own page with a unique title and content written around homeowners' questions, with real neighborhood examples, plain pricing information and answers to common questions.

Berman and Katona (2013) showed that search engine optimization tends to improve organic rankings' quality when the sites that invest are also the ones that deserve visitors. The company's strategy is to make its genuine strengths, certified arborists, honest pricing and local work, visible in every page rather than to imitate competitors' keyword lists.

What this page is doingBuilds content around customers' searches.
5

Paid Search

Five campaigns follow the keyword groups. Storm ads idle at a small budget and jump when the weather service posts a warning, taking the top slot, since urgency decides those jobs. For removal and pruning, bids aim at positions two and three. Agarwal et al. (2011) found in a bid experiment that lower slots drew fewer clicks but higher conversion, so the top slot was often not the most profitable. A branded campaign runs only if its four-week on-off test shows value. Because the retailer data in Yang and Ghose (2010) showed a company's unpaid and paid results on one query lifting each other's clicks, so paid spending on removal searches will be reduced as organic rankings rise, not removed.

What this page is doingFills gaps and captures urgent searches.
6

Local Search and Reviews

The map listing now shows correct hours, five service categories and real job photos, and directory listings show one phone number. Every customer receives a text the day after the job asking for an honest review, with no reward and no screening, and every review receives a reply. Anderson and Magruder (2012) found that an extra half-star on a review site made restaurants markedly more likely to fill at peak hours; for a company competing with rivals that have several times as many reviews, a steady flow of recent reviews may matter as much as any page.

What this page is doingStrengthens the map listing.
7

Measurement and Testing

Every source has a tracked number, forms are tracked as goals and the office records the source of every estimate and booked job. Each month the data are joined to report calls, forms, estimates, booked jobs and cost per job by source. Two tests have already run on the removal page: a three-field form raised completions from 1.9 to 4.6 percent of visitors with lead quality holding, and a fixed call bar raised calls by about a third, now being confirmed. Each future change will be tested the same way, with a hypothesis and a decision rule written first.

What this page is doingConnects searches to booked jobs.
8

Calendar and Budget

First-year calendar and budget

MonthsWorkCost
1 to 2Usability fixes, speed, listing cleanup, call tracking$4,500
2 to 4Service pages, storm page, cost guide, photos$6,000
1 to 12Paid search, five campaigns$28,800
3 to 12Review requests and replies, monthly reporting$2,400
4 to 12Ongoing tests and content updates$4,300
Total$46,000
What this page is doingSequences the year and its cost.
9

What Changed From the Milestones

Several earlier recommendations changed as the plan came together. The paid search plan in Milestone Two treated the branded campaign as a standing part of the budget; feedback and the eBay evidence led to making it a test instead. The keyword audit had proposed a page for every surrounding town, a tactic competitors use, but on reflection those pages would repeat the same content with a different town name and offer homeowners nothing new; the plan instead adds real job examples from those towns to the existing service pages. And the usability review originally recommended a full redesign; the test results showed that small fixes produced most of the gain, so the redesign is postponed to the second year, if the measurements show it is still needed.

What this page is doingShows revisions after feedback.
10

Ethics

The company will not buy, trade or reward reviews, will not post reviews about competitors, will report suspicious reviews through platform processes and will not use competitors' names in its ads. Its ads and pages will state prices and qualifications honestly.

What this page is doingStates the standards the plan follows.
11

Conclusion

The plan asks the owners to approve the first-year budget and the habit that makes it work: judging every website and search decision by booked jobs.

What this page is doingRestates the request.
12

References

Agarwal, A., Hosanagar, K., & Smith, M. D. (2011). Location, location, location: An analysis of profitability of position in online advertising markets. Journal of Marketing Research, 48(6), 1057-1073. https://doi.org/10.1509/jmr.08.0468

Anderson, M., & Magruder, J. (2012). Learning from the crowd: Regression discontinuity estimates of the effects of an online review database. The Economic Journal, 122(563), 957-989. https://doi.org/10.1111/j.1468-0297.2012.02512.x

Berman, R., & Katona, Z. (2013). The role of search engine optimization in search marketing. Marketing Science, 32(4), 644-651. https://doi.org/10.1287/mksc.2013.0783

Palmer, J. W. (2002). Web site usability, design, and performance metrics. Information Systems Research, 13(2), 151-167. https://doi.org/10.1287/isre.13.2.151.88

Yang, S., & Ghose, A. (2010). Analyzing the relationship between organic and sponsored search advertising: Positive, negative, or zero interdependence? Marketing Science, 29(4), 602-623. https://doi.org/10.1287/mksc.1090.0552

What the MKT 635 Module 10 instructions ask for

The final deliverable in MKT 635 typically calls for a complete website and search engine marketing plan for your organization, revised from the earlier modules. Plan on covering the website's purpose and current performance, usability and technical fixes, keyword strategy, SEO and content, paid search, local search where relevant, measurement and testing, a budget and a timeline. A strong plan is organized around the searches customers actually make and the outcome the site exists to produce, keeps all figures consistent, explains how organic and paid search support each other, measures results through to sales and shows what will happen first. It also states the ethical standards the organization will follow.

How this MKT 635 Module 10 final project example is built

The sample plan for Bluegrass Arbor Works, a composite Lexington tree care company, opens with a summary and defines the site's job as turning searches into calls and quote requests. It reports usability findings and fixes, keyword groups from storm emergencies to cost questions, the SEO audit and new service pages, paid search with storm-triggered ads and bids aimed at positions two and three, the map listing and a review practice, and measurement that joins call tracking to booked jobs, including the two tests already run. A twelve-month calendar, a budget of about $46,000 and a commitment on reviews complete the plan, supported by Palmer, Berman and Katona, Yang and Ghose, Agarwal and colleagues and Anderson and Magruder.

Where the MKT 635 Module 10 rubric puts the points

Grading for the MKT 635 capstone plan usually considers the site's purpose and performance analysis, usability and technical recommendations, keyword strategy, SEO and content, paid search, local search, measurement and testing, budget and timeline, ethics and overall coherence and writing. Plans earn top marks when every recommendation traces to a search customers make or a problem the audit found, figures agree across sections and results are measured through to sales. Plans lose credit when sections repeat earlier assignments without revision, organic and paid search are planned in isolation, success is measured by traffic, the budget does not match the activities or local search is ignored for a local business.

MKT 635 Module 10 help: the mistakes that cost points

Revise every earlier assignment and decide what the plan's spine is: usually the searches customers make and the action the site must produce. Arrange sections so each builds on the last, from site fixes to keywords, pages, paid search, local listings and measurement. Keep a single table of figures and check each section against it. Show how organic and paid search work together rather than separately. Include results you already have, such as tests, since they make the plan credible. Add a calendar and a budget that match the activities. Draft the summary last, in plain words a busy owner could approve from.

Get MKT 635 Module 10 written to your instructions

Share the MKT 635 Final Project instructions and the graded work from earlier modules. We turn them into one website and search plan in which the site fixes, keywords, pages, paid search, local listings, tracking and budget agree, with research supporting each decision. The first complete plan is free, and most are finished in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 635 papers and related MS in Marketing samples

MKT 635 Module 10 questions, answered

Where can I find a free MKT 635 Module 10 Final Project sample?

The complete MKT 635 Final Project on this page is a website and search marketing plan for a composite Lexington tree care company, from site fixes to paid and local search.

What should a website and search marketing plan include?

The site's purpose and performance, usability and technical fixes, keyword strategy, SEO and content, paid search, local search, measurement and testing, budget, timeline and ethical standards.

How do SEO and paid search work together?

Research found organic and paid listings for the same search reinforce each other, so plans should coordinate them, using ads where organic visibility is weak or speed matters most.

How do I measure a search marketing plan for a local business?

Track calls and forms by source, record which became booked jobs and report cost per job by channel, rather than relying on traffic or clicks alone.

How long is the MKT 635 final project?

Length depends on the guidelines and the organization, but a full plan with audits, tables and a calendar is usually far longer than any single milestone; completeness and consistency count more than page count.