MKT 660 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 660 Module 4 Discussion sample applies research on why people give to a nonprofit's own fundraising results. SNHU MKT 660 (MKT-660) has MS in Marketing students connect donor psychology to the appeals their organization actually sends. The case is a puzzle at Catoctin Therapeutic Riding Center, a composite program in Maryland: its most successful appeal was one photograph of a boy named Ben holding the reins for the first time, while a detailed annual report full of statistics raised almost nothing. The post explains the difference with research on identifiable victims, the mechanisms of giving and social information, and asks classmates what their best appeal had in common with Ben's.

CourseMKT 660 Marketing Strategies for Not-For-Profit Organizations
ModuleModule 4
Paper typegraduate discussion post applying research on why people give to a nonprofit's fundraising approach
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 660 Module 4

1

Module Four Discussion

Why People Give to a Horse Program

Last year Catoctin Therapeutic Riding Center sent two mailings to roughly the same list. The spring appeal was a single photograph of Ben, a seven-year-old with cerebral palsy, holding the reins for the first time, with two sentences from his mother about the first time he sat up straight without help. It raised $41,000 from 380 gifts. The fall annual report, eight pages of statistics on riders served, volunteer hours and horses' ages, raised $6,200. Both were well made. Only one moved people.

What this page is doingTwo appeals, two results.
2

Small et al. (2007) ran several donation studies in which a photo and name of one girl drew bigger gifts than figures about millions in need, and pairing her with those figures actually shrank what people gave to her. Thinking about numbers seemed to dampen the feeling that drives giving. The annual report asked donors to think; Ben's photograph asked them to feel, and then to act.

What this page is doingOne child, not many.
3

Bekkers and Wiepking (2011), reviewing hundreds of studies, grouped the reasons people give into eight families; three of them, knowing about a need, being asked directly and trusting that the gift will change something, map neatly onto what Ben's mailing did. Ben's appeal touched need, a direct ask and efficacy: his mother described a specific change. Shang and Croson (2009), in a field experiment during a public radio fund drive, found that telling callers that another member had recently given a particular amount, especially an amount drawn from the high end of past gifts, raised contributions by new members. The spring appeal could have added one line: "Last week a neighbor in Middletown gave $150, the cost of a lesson for Ben and one more."

What this page is doingWhat else moves donors.
4

The next appeal should keep one rider, told with the family's permission and in their words, add the cost of a lesson as a concrete way to help and mention what a real donor gave.

What this page is doingWhat to keep.
5

What did your organization's most successful appeal have in common with Ben's photograph, and what would you test next?

What this page is doingYour best appeal.
6

References

Bekkers, R., & Wiepking, P. (2011). A literature review of empirical studies of philanthropy: Eight mechanisms that drive charitable giving. Nonprofit and Voluntary Sector Quarterly, 40(5), 924-973. https://doi.org/10.1177/0899764010380927

Shang, J., & Croson, R. (2009). A field experiment in charitable contribution: The impact of social information on the voluntary provision of public goods. The Economic Journal, 119(540), 1422-1439. https://doi.org/10.1111/j.1468-0297.2009.02267.x

Small, D. A., Loewenstein, G., & Slovic, P. (2007). Sympathy and callousness: The impact of deliberative thought on donations to identifiable and statistical victims. Organizational Behavior and Human Decision Processes, 102(2), 143-153. https://doi.org/10.1016/j.obhdp.2006.01.005

What the MKT 660 Module 4 instructions ask for

The fourth MKT 660 discussion usually asks you to apply research on donor motivation to your organization's fundraising. Expect to describe one or more appeals, explain what motivates the organization's donors and use research to explain why some approaches work better than others. Strong posts work from actual results, such as which appeal raised more, and connect them to specific findings, such as the effect of an identifiable beneficiary or of social information, rather than listing motives in general. They also consider whether an effective technique respects the people being helped and the donors being asked. A post that proposes a test, with one element changed and a measure named, gives classmates something specific to react to, and it shows the organization how to keep learning from its own donors rather than from general advice.

How this MKT 660 Module 4 discussion example is built

The sample examines two appeals from the composite Catoctin Therapeutic Riding Center. A single photograph of a boy named Ben holding the reins for the first time, with two sentences from his mother, raised $41,000 from 380 gifts, while an annual report packed with statistics on riders served and hours volunteered raised $6,200. Small, Loewenstein and Slovic's finding that an identifiable child drew more giving than statistics, and that statistics reduced giving to the child, Bekkers and Wiepking's eight mechanisms of giving and Shang and Croson's evidence that telling donors what someone else gave raised contributions explain the gap and suggest the next appeal.

Where the MKT 660 Module 4 rubric puts the points

Grading for the donor motivation discussion typically covers application of research to the organization's real appeals, insight into what moves its donors, practical implications, attention to the dignity of beneficiaries and what replies contribute. Strong posts explain results with specific findings and draw a lesson the organization can test. Posts lose credit for listing motives without evidence, recommending emotional manipulation, ignoring the organization's own results or giving classmates praise without substance. The most helpful replies propose an experiment for a classmate's next mailing, naming the single element to vary and the result to watch. Citing your organization's own response rates, even rough ones, beats any general claim about what donors like.

MKT 660 Module 4 help: the mistakes that cost points

Pick two appeals your organization has sent and compare their results, even roughly. Describe what each looked and sounded like. Use research on donor psychology, such as identifiable beneficiaries, social information or efficacy, to explain why one did better. Ask whether the more effective approach treats the people served with dignity. Then suggest what the next appeal should keep or change, and how you would test it. End by asking classmates what their organization's most successful appeal had in common with yours, and reply with a specific observation. Keep the story short; two sentences in a family's own words often do more than a page of description. If you have no past results, describe how you would collect them.

Get MKT 660 Module 4 written to your instructions

Send your MKT 660 Module 4 discussion prompt and a past appeal from your organization. We explain why it did or did not work using research on donor psychology, suggest what to change and close by asking peers to compare their own best appeal. The first post is written without charge and usually lands in a day or two. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 660 papers and related MS in Marketing samples

MKT 660 Module 4 questions, answered

Where can I find a free MKT 660 Module 4 Discussion sample?

The complete MKT 660 Module 4 post on this page explains why one rider's photograph raised far more than a statistics-heavy report at a composite riding center.

What is the identifiable victim effect?

The finding that people give more to help a single identified person than to help many described by statistics, and that adding statistics can reduce giving to the individual.

Do statistics help fundraising appeals?

Research suggests statistics alone move fewer donors than a single identifiable story, and mixing them in can weaken the emotional response that drives giving.

What is social information in fundraising?

Telling potential donors what others have given; a field experiment found mentioning a high but realistic gift amount increased contributions.

Is it ethical to use emotional stories in fundraising?

Yes when the story is true, told with consent and shows the person with dignity; it becomes unethical when it exaggerates need or exploits the person featured.