| Course | MKT 610 Promotions Management |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment writing a creative brief that directs advertising for a brand: the problem, audience, single message, support, tone, mandatory elements and how the work will be judged |
| Length | About 780 words, 4 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 610 Module 5
Memorandum
To: Creative team, Lehigh Street Agency
From: Marketing Manager, Roaring Brook Bottling Company
Date: October 13, 2026
Re: Creative brief for the Lehigh Valley and Philadelphia suburbs campaign
The Problem
Shoppers in Allentown, Bethlehem and the towns north of Philadelphia walk past Roaring Brook birch beer every week because they have never tasted birch beer, do not know what it is and have never heard of the brand.
The Audience
Our audience is family shoppers aged 25 to 54 who buy soda in multipacks for pizza nights, birthday parties and summer cookouts. They are not soda enthusiasts; they buy what the family likes, plus something new now and then if it looks fun and costs little to try. When they see birch beer on the shelf, most assume it is a kind of beer or a root beer with an odd name. They do not distrust it; they simply have no idea what it is. A small group among them grew up near Scranton and will recognize the red can instantly. We want them to feel proud to see it, but the work is for the people who have never had it.
The Proposition
"It's not root beer."
The proposition does one job: it gives the shopper a place to file the product. Everyone knows root beer. Telling them birch beer is its brighter, cooler cousin answers the question that stops them from buying.
Support
It is red, a color no other soda on the shelf has. It finishes with a cool, wintergreen note from birch oil. It has been brewed in Scranton since 1906 from the same recipe, and it is what pizza shops in northeastern Pennsylvania pour by the pitcher. In tastings, three of four first-time tasters in the new region rated it four or five out of five.
Desired Response
"So that's what birch beer is. The kids would love the red one. Let's grab a pack for Friday."
Tone
Confident and playful, never nostalgic for its own sake. The brand is old and does not mind saying so, but it talks to people who are meeting it today. Think of a friend from Scranton who cannot believe you have never had birch beer.
What Research Says About the Work
Pieters and Wedel (2004) used infrared eye tracking on thousands of magazine readers and reported three separate patterns: pictures pulled the eye whatever their dimensions, copy pulled it only as far as its area grew, and the brand mark did the most to send the gaze on to everything else in the layout. That finding argues for a large image of the red can, which is both the picture and the brand, and for keeping copy short.
Smith et al. (2007), developing and testing a model of advertising creativity, found that consumers saw ads as creative when they combined divergence, novelty or surprise, with relevance, and that perceived creativity then shaped how people processed and responded to the ad. Surprise alone is not the goal; the surprise must make birch beer easier to understand.
Romaniuk and Sharp (2004) described brand salience as a brand's tendency to be noticed or remembered in buying situations, built from links in memory. The red color and the can design are the brand's most distinctive cues, the ones a shopper should spot from the end of the aisle. Every piece of work must make them unmistakable.
Mandatory Elements
Mandatories
| Element | Requirement |
|---|---|
| The red can or bottle | Shown large, in color, in every visual execution |
| Brand name | Visible or spoken within the first three seconds of video and in the top third of print and display |
| The word "birch beer" | Always paired with a description of the taste |
| "Brewed in Scranton since 1906" | Present as a sign-off, never the headline |
| Where to buy | Store names or "in the craft soda aisle" in every in-store and digital piece |
Media and Budget Context
The first-year working media budget is about $380,000, mainly online video, streaming audio, social media, in-store signs and local outdoor near stores. There is no television budget. Ideas should work in six seconds of video, a shelf strip and a 30-second audio spot.
How the Work Will Be Judged
We will judge concepts on three questions. Does a stranger understand what birch beer is after one exposure? Is the red can recognizable at a glance? Is there something unexpected that makes people want to try it? Concepts will be shown to 60 target shoppers in the new region before production, and the winning concept must raise the share who can describe birch beer by at least 20 points. If no concept clears that bar, we will revise the work rather than lower it, because a campaign that leaves people confused about the product cannot reach the objectives no matter how much media supports it.
References
Pieters, R., & Wedel, M. (2004). Attention capture and transfer in advertising: Brand, pictorial, and text-size effects. Journal of Marketing, 68(2), 36-50. https://doi.org/10.1509/jmkg.68.2.36.27794
Romaniuk, J., & Sharp, B. (2004). Conceptualizing and measuring brand salience. Marketing Theory, 4(4), 327-342. https://doi.org/10.1177/1470593104047643
Smith, R. E., MacKenzie, S. B., Yang, X., Buchholz, L. M., & Darley, W. K. (2007). Modeling the determinants and effects of creativity in advertising. Marketing Science, 26(6), 819-833. https://doi.org/10.1287/mksc.1070.0272
What the MKT 610 Module 5 instructions ask for
The Module 5 assignment in MKT 610 typically asks for a creative brief: the short document a marketer gives an agency or creative team to direct a campaign. Expect to state the communication problem, the target audience and what they currently think, the single most important thing the advertising must say, the reasons to believe it, the desired response, the tone and any mandatory elements, along with the media and budget context. A strong brief is short and decisive. It chooses one message rather than listing every benefit, describes the audience as people rather than a demographic line and gives creative teams enough freedom to surprise while making clear how their work will be judged.
How this MKT 610 Module 5 creative brief assignment example is built
The sample brief for the composite Roaring Brook bottler fits on two pages. It states the problem in one sentence: shoppers in the new region have never tasted birch beer and do not know the brand. It describes family shoppers aged 25 to 54 and what they think now, sets the proposition "It's not root beer," with the red color, the wintergreen finish and the 1906 Scranton recipe as support, and asks for a confident, playful tone. Mandatory elements include the red can shown large and the brand name early. Pieters and Wedel's eye-tracking study, Smith and colleagues on creativity and Romaniuk and Sharp on brand salience shape the mandatories and judging criteria.
Where the MKT 610 Module 5 rubric puts the points
Creative briefs in MKT 610 earn marks mainly for a problem stated so a stranger gets it, insight into the target audience, a single-minded and compelling proposition, credible support, appropriate tone and mandatories, consistency with the objectives and appeal chosen earlier and concise professional writing. Strong briefs fit on one or two pages and make one decision about the message. Briefs lose credit when the proposition lists several benefits, when the audience is described only by demographics, when support is generic, such as "high quality," or when the brief dictates the execution so tightly that no creative idea is possible. Judging criteria that tie back to objectives make the brief usable.
MKT 610 Module 5 help: the mistakes that cost points
Write the problem in one sentence that a stranger could understand. Describe the audience as people: what they buy now, what they believe about the category and what would make them notice. Choose one proposition, the single thing the advertising must communicate, and resist adding a second. List two or three facts that prove it. Describe the response you want, in the audience's own words. Set the tone in a few adjectives with an example. List only the mandatories that matter, such as logo placement or legal lines. Add the media and budget so creative ideas fit them. End with how the work will be judged, tied to your objectives.
Get MKT 610 Module 5 written to your instructions
Send the MKT 610 Module 5 guidelines and your objectives. We write a creative brief with a one-sentence problem, a defined audience, a single-minded proposition, support, tone, mandatory elements and judging criteria, using research on attention and creativity. The first brief is written free, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 610 papers and related MS in Marketing samples
- MKT 610 Module 1 Discussion: The Role of Promotion in the Marketing Mix
- MKT 610 Module 2 Brand and Situation Analysis Assignment: Brand and Situation Analysis
- MKT 610 Module 3 Milestone One: Promotional Objectives and Target Audience
- MKT 610 Module 4 Discussion: Choosing a Message Appeal
- MKT 610 Module 6 Milestone Two: Media Plan and Promotional Budget
- BMB 515 Module 1 Discussion: Where Streaming Moved the Money
- ACC 660 Module 7 Discussion: Controls When Every Hospital Runs Itself
- MKT 555 Module 4 Discussion: Content That Earns Attention
- MGT 600 Module 10 Final Project: The Integrated Resource Plan
MKT 610 Module 5 questions, answered
Where can I find a free MKT 610 Module 5 creative brief sample?
The complete MKT 610 Module 5 creative brief on this page sets the problem, audience, proposition and mandatories for a composite birch beer campaign in new stores.
What is a creative brief?
A short document that tells a creative team the communication problem, the audience, the single message to convey, the support for it, the tone, required elements and how the work will be judged.
What is a single-minded proposition?
The one most important thing the advertising must communicate, stated in a short sentence, chosen so the creative work stays focused instead of listing several benefits.
What makes an advertisement creative?
Research found people judge ads as creative when they are both divergent, meaning novel or unexpected, and relevant to the audience and brand; novelty alone is not enough.
Where should the brand appear in a print ad or package-style ad?
Eye-tracking research found the brand element is best at moving attention to the rest of the ad, so showing the brand clearly, often early, helps the whole ad work.