| Course | INT 620 International Corporate Finance |
|---|---|
| Module | Module 9 |
| Paper type | graduate discussion post on internal cash management and transfer pricing in a multinational |
| Length | About 390 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for INT 620 Module 9
Module Nine Discussion
Idle Euros, Expensive Reais
Last month Kettle Moraine Process Systems' treasurer compiled cash and debt by subsidiary for the first time in a year. The Dutch subsidiary held €18 million in a current account earning almost nothing. The Brazilian subsidiary owed the equivalent of $14 million to local banks at about 13 percent. Meanwhile, the Wisconsin plant sells separator parts to Brazil and will soon ship components to the new Indian plant, at prices nobody had reviewed in years.
A cash pool could put the Dutch euros to work. In a physical pool, balances are swept to a central account and lent where needed; in a notional pool, a bank offsets balances for interest purposes without moving them. Lending euros to Brazil would replace expensive local debt, but Brazil taxes and regulates foreign loans, and lending euros to a real-earning unit creates currency mismatch, so a modest intercompany loan, hedged or partly converted, makes more sense than a full replacement. The Dutch unit could also pay a dividend to the parent, which could then lend dollars where needed.
Whatever Wisconsin charges its Brazilian and Indian sister companies for parts has to pass the arm's length test, meaning a price a stranger would accept. The temptation to shift profit through these prices is real. Clausing (2003) found that prices on U.S. intrafirm trade were systematically related to tax rate differences, with exports to lower-tax affiliates priced lower and imports from them priced higher than comparable arm's length trade. Huizinga and Laeven (2008) estimated substantial profit shifting within European multinationals in response to international tax differences. Hines and Rice (1994) documented how American firms concentrated reported profits in low-tax jurisdictions.
Kettle Moraine should set up a notional euro pool, lend part of the surplus to Brazil with partial hedging and review transfer prices with documented comparables before the first Indian shipment. India's tax authority is known for close scrutiny of related-party pricing, so documentation matters more than a few points of tax.
Moving cash to cut borrowing costs is good treasury practice, and pooling also gives the treasurer a single view of group liquidity, which the company has lacked. Setting prices to move profit away from where the work is done invites audits and damages trust.
How does money move inside your employer, and has anyone recently checked whether the internal prices would pass an audit?
References
Clausing, K. A. (2003). Tax-motivated transfer pricing and US intrafirm trade prices. Journal of Public Economics, 87(9-10), 2207-2223. https://doi.org/10.1016/S0047-2727(02)00015-4
Hines, J. R., Jr., & Rice, E. M. (1994). Fiscal paradise: Foreign tax havens and American business. The Quarterly Journal of Economics, 109(1), 149-182. https://doi.org/10.2307/2118431
Huizinga, H., & Laeven, L. (2008). International profit shifting within multinationals: A multi-country perspective. Journal of Public Economics, 92(5-6), 1164-1182. https://doi.org/10.1016/j.jpubeco.2007.11.002
What the INT 620 Module 9 instructions ask for
The internal flows discussion in INT 620 usually asks how multinationals manage cash, dividends, intercompany loans and transfer prices across subsidiaries, and how taxes and regulations shape these choices. Prompts may ask about cash pooling, netting, leading and lagging, dividend repatriation, transfer pricing rules or the ethics of profit shifting. A good graduate post uses a specific situation, explains the tools available and their limits, applies tax and treasury research rather than generalities, distinguishes lawful planning from aggressive shifting and invites classmates to describe practices in their own organizations. Some instructors also ask how currency controls in a country would change the cash plan.
How this INT 620 Module 9 discussion example is built
The sample describes Kettle Moraine Process Systems' treasurer discovering €18 million idle in the Dutch subsidiary while the Brazilian subsidiary pays about 13 percent on local loans. The post explains notional and physical cash pooling, intercompany loans, dividend timing and the arm's length standard that governs prices on parts the Wisconsin plant sells to Brazil and will sell to India. It cites Clausing's evidence that U.S. intrafirm trade prices respond to tax rate differences, Huizinga and Laeven's estimates of profit shifting within European multinationals and Hines and Rice on the use of tax havens, and argues for pooling, sensible dividends and arm's length prices documented to withstand audit.
Where the INT 620 Module 9 rubric puts the points
Internal flows discussions in INT 620 are usually marked on understanding of cash management tools, transfer pricing rules, tax considerations, application to a company and the quality of exchanges with classmates. Strong posts explain the mechanics of pooling and intercompany lending, state the arm's length principle accurately, use evidence on tax-motivated pricing and draw a clear line between planning and abuse. Posts lose points for describing transfer pricing as freely chosen, for ignoring withholding taxes and regulations on cross-border loans, for skipping the ethics of profit shifting, for thin research, and when replies offer no new tool, risk or rule. Drawing a clear line between lawful planning and aggressive profit shifting is something graders weigh heavily in this thread.
INT 620 Module 9 help: the mistakes that cost points
Describe the situation in numbers: where cash sits, where units borrow and at what cost, and what goods or services move between units. Then explain the tools: pooling and netting for cash, intercompany loans and dividends for moving funds, and transfer prices for internal sales. Check the limits, such as withholding taxes, foreign borrowing rules and the arm's length standard, which requires internal prices to match what unrelated parties would charge. Use research on how taxes influence transfer prices and profit location, and be clear about where lawful planning ends. End by asking classmates how their employers move money internally, which brings out practical examples. A small table of where cash sits and where units borrow makes the case for pooling at a glance.
Get INT 620 Module 9 written to your instructions
Send the INT 620 Module 9 prompt and how money moves inside your company. We map the internal flows, show where pooling, dividends or pricing could cut cost lawfully, ground it in tax and treasury research and end with a prompt for peers. Two days is typical, and we write the first post without charge. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 620 papers and related MS Finance samples
- INT 620 Module 1 Discussion: When Cash Arrives in Four Currencies
- INT 620 Module 2 Parity Conditions Assignment: Do Interest and Price Parity Hold for the Euro, Kiwi and Real?
- INT 620 Module 3 Discussion: Should Kettle Moraine Hedge at All?
- INT 620 Module 4 Transaction Exposure Assignment: A Kiwi Receivable and a Euro Payable
- INT 620 Module 5 Milestone One: Economic and Translation Exposure Across the Group
- INT 620 Module 6 Discussion: Pricing India's Risk Into the Discount Rate
- INT 620 Module 7 Capital Budgeting Assignment: Valuing the Gujarat Plant
- INT 620 Module 8 Milestone Two: Financing the Plant: Rupees, Dollars or Euros
- INT 620 Module 10 Final Project: The International Financial Strategy
- MKT 668 Module 6 Milestone Two: Pricing and Managing Demand and Capacity
- SPT 565 Module 6 Media Rights Assignment: Rights and Streams Across Borders
- MKT 500 Module 9 Milestone Nine: Implementation, Evaluation and Control
- HRM 630 Module 7 Statistical Process Control Assignment: A Control Chart on Missed Visits
INT 620 Module 9 questions, answered
Where can I find a free INT 620 Module 9 Discussion sample?
The full INT 620 Module 9 post is on this page, covering cash pooling, dividends and transfer pricing in a multinational with four country units.
What is cash pooling?
A treasury arrangement that combines the cash balances of a group's units, either by physically moving funds to a central account or by notionally offsetting balances, to reduce borrowing costs.
What is the arm's length principle?
The rule, used by tax authorities worldwide, that prices for transactions between related companies should match those unrelated parties would agree on in similar circumstances.
Do multinationals use transfer prices to shift profits?
Research finds that intrafirm prices and reported profits respond to tax rate differences, which tax authorities counter with transfer pricing rules and documentation requirements.
Why might a multinational delay dividends from a subsidiary?
To reinvest locally, to wait for better exchange rates or to manage withholding taxes, though leaving cash idle has costs if other units borrow expensively.