SPT 501 Module 2 Research Problem Assignment Example

Reviewed by Portia Lambrick, MBA

This SPT 501 Module 2 Research Problem Assignment sample writes a research problem statement, purpose, research questions and hypotheses, defines key terms and variables and explains the study's significance and scope. SNHU SPT 501 (SPT-501) builds the MS Sport Management research proposal from this foundation. The study concerns Lakeline Endurance Events, an invented Iowa company whose summer triathlon series loses most of its first-time finishers after a single race. The assignment turns that pattern into questions and hypotheses precise enough that data could prove them wrong, and it defines each variable so another researcher could measure it the same way.

CourseSPT 501 Research Methods in Sport Management
ModuleModule 2
Paper typegraduate assignment writing a research problem statement, purpose, research questions and hypotheses, defining key terms and variables and explaining the study's significance and scope
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 501 Module 2

1

Why First-Timers Leave: Research Problem, Questions and Hypotheses for the Bluestem Series Study

[Student Name]

Southern New Hampshire University

SPT 501: Research Methods in Sport Management

Research Problem Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingLakeline Endurance Events, the Bluestem series and all figures in this SPT 501 assignment are invented.
2

Why First-Timers Leave: Research Problem, Questions and Hypotheses for the Bluestem Series Study

Problem Statement

Lakeline Endurance Events stages the Bluestem Triathlon Series, a half-dozen summer sprint and Olympic-distance events spread between Ames and the southern Minnesota lakes. Over the last three seasons the series averaged about 4,800 finishers a year, and about 44 percent were doing their first triathlon. Registration records show that only about 29 percent of these first-time finishers started another Bluestem race within twelve months; the matching rate for returning, experienced triathletes was roughly 61 percent. Because first-time finishers make up nearly half of each field, their low return rate means the series must recruit about 1,500 new athletes each year simply to stay the same size. The pattern also matters beyond one company: participant sport events depend on converting newcomers into regular participants, and little research examines why beginners in endurance events stop after one try.

What this page is doingStates the problem with evidence.
3

Purpose

This study, combining a survey with interviews, aims to identify the personal characteristics, race-day experiences and perceived constraints associated with a beginner starting another triathlon within twelve months of a first Bluestem finish, and to understand how first-time finishers describe their decisions to return or not.

What this page is doingStates what the study will do.
4

Research Questions

Research question 1: Among first-time finishers of Bluestem triathlons in the last three seasons, which characteristics, race experiences and perceived constraints predict starting another triathlon within twelve months?

Research question 2: How do first-time finishers describe the reasons behind their decision to return or not return to triathlon?

What this page is doingPoses the questions.
5

Hypotheses

Crawford et al. (1991) proposed that leisure constraints operate in a hierarchy, from intrapersonal constraints such as anxiety or self-doubt, through interpersonal constraints such as lacking partners, to structural constraints such as time, cost and distance, and that people must negotiate each level to participate. Lamont and Kennelly (2011) studied triathletes and found that competing priorities, such as work and family, constrained their event travel. Getz and McConnell (2011) describe participants deepening their involvement over time through event travel careers, which suggests early experiences and social ties matter. These sources support four hypotheses for research question 1.

Hypotheses for research question 1

HypothesisPredictionBasis
H1First-time finishers in the slowest quarter of their race are less likely to return than faster first-timersIntrapersonal constraint: feeling out of place
H2First-time finishers who traveled more than 90 minutes to the race are less likely to returnStructural constraint: distance and cost
H3First-time finishers who report higher time constraints are less likely to returnCompeting priorities
H4First-time finishers who trained with a group or club are more likely to returnInterpersonal support; early event career

Research question 2 is exploratory and has no hypotheses; it will be answered through interviews.

What this page is doingMakes falsifiable predictions.
6

Why Two Kinds of Question

The two research questions are deliberately different in kind. The first can be answered with numbers: if registration records and a survey show that slow finishers, long-distance travelers and time-pressed beginners return less often, the company learns who is at risk. But a pattern in numbers does not explain itself. A slow finisher may stay away because the experience was embarrassing, because the training took more time than expected or because the race was simply a box to tick. Those explanations call for different responses from the company, from beginner waves to training programs to nothing at all. The second question asks first-timers to describe their decisions in their own words, so the study can see which explanations hold and whether there are reasons the hypotheses never anticipated. Answering both questions in one study lets each answer check the other.

What this page is doingExplains how the questions fit together.
7

Definitions and Variables

Key variables and measures

VariableDefinitionMeasure
First-time finisherAthlete who completed a Bluestem race and reported it as their first triathlonRegistration question, confirmed on survey
ReturnStarting any triathlon within twelve months after the first finishBluestem registrations plus survey report of other races
Finish positionPercentile of finish time within the athlete's race and genderOfficial results
Travel distanceDriving time from home to race siteCalculated from home ZIP code
Time constraintsPerceived lack of time for training and racingSurvey scale, adapted constraint items
Group trainingTraining regularly with a club, group or partner before the raceSurvey question
Race experienceSatisfaction with the race experienceSurvey scale

Return is measured both through company records and through the survey, because some first-timers may race elsewhere; counting only Bluestem races would understate return to the sport.

What this page is doingDefines terms in measurable ways.
8

Significance

For Lakeline, the study would show which first-timers are most at risk of not returning and what experiences or supports might change that, guiding decisions about beginner waves, training groups, pricing and course design. For research, it would add evidence on how constraints and early experiences shape continued participation in endurance events, an area where most studies focus on committed athletes rather than beginners. Because the study measures whether athletes actually return, not only whether they say they intend to, its findings will speak to the difference between stated plans and behavior, a recurring weakness in event research. The results could also inform regional triathlon clubs and the national governing body, whose growth depends on beginners becoming regular participants.

What this page is doingExplains why the study matters.
9

Scope and Delimitations

The study is delimited to first-time finishers of Bluestem races in the last three seasons; it does not include athletes who registered but did not start or did not finish, though their absence is a limitation. It examines return within twelve months, not long-term participation. It is limited to one regional series in the upper Midwest, so findings may not generalize to large urban races or other countries.

What this page is doingSets boundaries.
10

Assumptions

The study assumes that athletes answer survey questions honestly, that self-reports of racing elsewhere are reasonably accurate and that registration data are complete. It also assumes that return within twelve months is a meaningful indicator of continued participation, though some athletes may take a season off and return later.

What this page is doingStates what the study takes for granted.
11

Conclusion

The Bluestem series loses most first-time finishers after one race, a problem for the company and an underexamined question for research. The study will ask which characteristics, experiences and constraints predict return and how first-timers explain their choices, testing four hypotheses drawn from research on leisure constraints and event careers. The next assignment will review the literature behind these hypotheses in depth.

What this page is doingSummarizes the research problem.
12

References

Crawford, D. W., Jackson, E. L., & Godbey, G. (1991). A hierarchical model of leisure constraints. Leisure Sciences, 13(4), 309-320. https://doi.org/10.1080/01490409109513147

Getz, D., & McConnell, A. (2011). Serious sport tourism and event travel careers. Journal of Sport Management, 25(4), 326-338. https://doi.org/10.1123/jsm.25.4.326

Lamont, M., & Kennelly, M. (2011). I can't do everything! Competing priorities as constraints in triathlon event travel careers. Tourism Review International, 14(2), 85-97. https://doi.org/10.3727/154427211X13044361606333

What the SPT 501 Module 2 instructions ask for

The SPT 501 Module 2 assignment typically asks students to develop the research problem for a proposed study: a problem statement, the purpose of the study, research questions and, where appropriate, hypotheses, with definitions of key terms. Expect to explain why the problem matters, what the study will investigate and what it will not. Strong papers state the problem with evidence, write a purpose statement that names the population, variables and approach, pose research questions that the design can answer, write hypotheses that are specific and falsifiable and grounded in prior research, define variables in measurable terms and set clear scope and delimitations. Assumptions and the study's significance for practice and research round out the assignment.

How this SPT 501 Module 2 research problem assignment example is built

The assignment writes the research problem for a study at Lakeline Endurance Events, a fictional Ames, Iowa company running the Bluestem Triathlon Series. About 29 percent of first-time finishers return the next season against about 61 percent of experienced triathletes. The purpose is to explain which characteristics, experiences and constraints predict first-timers' return and how they describe their decisions. Two research questions and four hypotheses follow, such as slower finishers, long-distance travelers and those reporting time constraints returning less and group trainees returning more. Variables are defined with measures, and significance, scope, delimitations and assumptions are set out. Crawford and colleagues, Getz and McConnell and Lamont and Kennelly are cited.

Where the SPT 501 Module 2 rubric puts the points

Grading in the SPT 501 research problem assignment usually rewards a problem stated with evidence, a precise purpose statement, research questions the design could answer, specific and falsifiable hypotheses grounded in prior research, measurable definitions of variables, a clear explanation of significance, sensible scope and delimitations and stated assumptions. Papers stand out when every hypothesis traces to a source and to a measure. They lose points for questions that cannot be answered with available data, hypotheses that predict nothing in particular, undefined terms or significance claims that ignore practice. Readers also expect tables where they help, APA references and plain academic prose throughout.

SPT 501 Module 2 help: the mistakes that cost points

State the problem in a paragraph with numbers: what is happening and why it matters. Write one sentence of purpose naming who you will study, what you will measure and how. Turn the purpose into two or three research questions. Where prior research suggests an answer, write a hypothesis that says which direction you expect and could be shown wrong. Define each key term so a stranger could measure it the same way. Say what the study covers and what it deliberately leaves out. Papers often write hypotheses that simply restate the question; good hypotheses take a position that data could contradict, and each one names the variable that will test it.

Get SPT 501 Module 2 written to your instructions

Share the SPT 501 Module 2 instructions and your research topic. A writer drafts the problem statement, purpose, research questions and hypotheses, defines terms and variables with measures, explains significance, scope and delimitations and grounds the problem in sport management research, ready to build into a proposal. The first SPT 501 assignment costs nothing and tends to come back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 501 papers and related MS Sport Management samples

SPT 501 Module 2 questions, answered

Where can I find a free SPT 501 Module 2 research problem sample?

The complete SPT 501 Module 2 assignment is on this page, setting research questions and hypotheses for an invented triathlon series study.

What is a research problem statement?

A concise description of the issue a study addresses, the evidence that it exists and why it matters.

What makes a good hypothesis?

It predicts a specific relationship or difference, is grounded in prior research and could be shown false by the data.

What are delimitations in a research proposal?

Boundaries the researcher deliberately sets, such as the population, setting and time frame the study covers.

Why define variables operationally?

So that each variable is measured in a specific, repeatable way and readers know exactly what was studied.