| Course | SPT 501 Research Methods in Sport Management |
|---|---|
| Module | Module 9 |
| Paper type | graduate final project presenting a complete sport management research proposal with problem, questions and hypotheses, literature, mixed-methods design, sampling, instrument, ethics, analysis plan, timeline, budget and limitations |
| Length | About 1,280 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 501 Module 9
Why First-Time Triathletes Do Not Return: A Mixed-Methods Research Proposal
[Student Name]
Southern New Hampshire University
SPT 501: Research Methods in Sport Management
Final Project
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Why First-Time Triathletes Do Not Return: A Mixed-Methods Research Proposal
Abstract
Fewer than a third of the athletes who finish their first triathlon at a Bluestem race start another within a year, less than half the rate among experienced athletes. This proposal describes an explanatory sequential mixed-methods study that will identify the personal traits, race-day experiences and perceived barriers associated with a beginner's return and how beginners explain their decisions. All first-time finishers from three seasons will be invited to a survey linked to registration records of actual return, and twenty will be interviewed. Logistic regression and thematic analysis, integrated through a joint display, will inform how Lakeline Endurance Events supports newcomers and add evidence on how beginners in endurance events continue or stop.
Problem and Purpose
Lakeline Endurance Events stages six summer triathlons in central Iowa and southern Minnesota for roughly 4,800 finishers a year, close to half of them racing for the first time. Registration data from three seasons show that newcomers rarely come back, which forces the company to replace about 1,500 athletes each year to hold its fields steady and limits the sport's growth in the region. The purpose of the study is to explain which first-time finishers return within twelve months, what predicts the difference and how athletes themselves account for their choices.
Questions and Hypotheses
Research question 1 asks which characteristics, experiences and constraints predict return within twelve months. Research question 2 asks how first-time finishers describe their decisions.
Hypotheses, measures and analysis
| Hypothesis | Measure | Analysis |
|---|---|---|
| H1: Slowest-quarter finishers return less | Official results, bottom quarter coded 1 | Logistic regression odds ratio |
| H2: Athletes traveling over 90 minutes return less | Driving time from home ZIP code | Logistic regression odds ratio |
| H3: Higher time constraints lower return | Structural constraint items on time | Logistic regression odds ratio |
| H4: Group training raises return | Survey item on regular group training before the race | Logistic regression odds ratio |
| RQ2 | Semi-structured interviews | Thematic analysis |
Literature and Gap
Leisure constraints research holds that people face intrapersonal, interpersonal and structural barriers in sequence and must negotiate each to take part (Crawford et al., 1991). Research on event travel careers shows committed participants progressing through events as their involvement deepens (Getz & McConnell, 2011), and event research links satisfaction with a small recurring event to participants' intentions to return (Kaplanidou & Gibson, 2010). Three gaps remain: studies concentrate on committed athletes rather than beginners, they usually measure intentions rather than actual return and they rarely combine survey measures with participants' own explanations. This study addresses all three.
Design
The study uses an explanatory sequential design, combining quantitative and qualitative strands because neither alone answers both questions (Johnson & Onwuegbuzie, 2004). The survey and record linkage come first; interviews follow and are selected using survey results, so that they can explain the patterns found. A records-only analysis was rejected because records lack constraints and satisfaction, and an interview-only study because it cannot show how common any explanation is.
Population and Sampling
The population is athletes who completed their first triathlon at a Bluestem race in the last three seasons, about 6,300 people. Everyone on that list who can be reached by email receives an invitation, making the survey a census of the frame rather than a sample. Interviewees, about twenty, will be chosen purposively from respondents who agree to contact, balancing returners and non-returners and high and low constraint scores.
The pilot changed this section. Of 400 pilot invitees, 23 percent answered, but returners were overrepresented, 41 percent of respondents against 29 percent of invitees. Groves (2006) argued that nonresponse threatens accuracy when willingness to respond moves with the variables of interest, which is the case here. The proposal therefore adds a text-message follow-up worded for athletes who have not raced since, an unconditional $5 gift card offered on the first survey screen, a comparison of respondents and non-respondents on every variable in the records and weights that restore the population's balance on return status, finish position and distance.
Instrument
The survey has seven sections: intrapersonal, interpersonal and structural constraints, group training, race satisfaction, racing elsewhere and consent to interview contact. Constraint items are adapted from established scales and use five labeled agreement points. Cognitive interviews with five first-timers and a pilot of sixty tested the instrument. Using coefficient alpha (Cronbach, 1951), three scales reached 0.77 to 0.86; the interpersonal scale reached only 0.58 because it mixed lacking companions with lacking support at home, so it has been split into two short scales with an added item each. Finish position and travel distance come from records, which also supply the outcome, reducing the risk of inflated relationships from measuring everything on one form.
Ethics
The study will be submitted to the university review board. Its protections follow the principles of independent review, informed consent, a favorable balance of risk and benefit and respect for participants (Emanuel et al., 2000).
Risks and protections
| Risk | Protection |
|---|---|
| Athletes feel unable to refuse the race company | Consent states plainly that declining has no effect on entries; survey hosted by the university |
| Linked data are identifiable | Coded key held separately by the university; no names in analysis files |
| Incentive tilts sample or pressures | Small unconditional gift card, not an entry discount |
| Researcher's employer benefits from results | Second coder outside the company; all hypotheses reported regardless of outcome |
| Small groups identifiable in reports | No result reported for fewer than ten athletes |
Analysis Plan
Because return is a yes-or-no outcome, logistic regression will model the odds of a return as a function of the four hypothesized predictors, controlling for age, gender, race distance and satisfaction (Peng et al., 2002). With about 400 expected returners and eight predictors, the model has ample events per predictor. Each predictor's effect will appear as an odds ratio alongside its 95 percent confidence interval, and predicted probabilities for typical athletes will make the numbers readable; weighted and unweighted results will both be shown. A hypothesis is supported if its odds ratio falls in the expected direction with an interval excluding 1. Interviews will be analyzed through the six phases of thematic analysis (Braun & Clarke, 2006), with a second coder on four transcripts. A joint display will place each regression result beside related themes.
Timeline and Budget
Budget
| Month | Work planned |
|---|---|
| 1 | Board review and approval; final instrument changes |
| 2 | Survey launch, email and text follow-up |
| 3 | Survey closes; record linkage; nonresponse comparison |
| 4 | Regression analysis; interviewee selection; interviews begin |
| 5 | Interviews completed; transcription and coding |
| 6 | Integration, report to Lakeline and course write-up |
| Item | Cost |
| Unconditional gift cards, about 1,000 openers at $5 | $5,000 |
| Interview thank-you payments, 20 at $40 | $800 |
| Transcription, about 20 hours of audio | $1,200 |
| Second coder, 16 hours | $600 |
| Survey and text messaging software | $300 |
| Total | $7,900 |
Contributions and Limitations
For Lakeline, the study will identify the newcomers least likely to race again and whether changes such as beginner waves, training groups or closer race options are likely to help. For research, it will follow beginners' actual behavior rather than intentions, linking constraints to return and adding athletes' own accounts.
The study shows associations, not causes. It covers one regional series, so results may not hold for large urban races. Registrants who never reached the start line, or who dropped out mid-race, fall outside the population. Weighting corrects only for differences the records capture, and self-reports of racing elsewhere may be imperfect.
Conclusion
The proposed study turns a company's worry into a feasible, ethical and testable research plan. A survey linked to records of who actually returned will show which first-time finishers are at risk, and interviews will explain why, giving Lakeline evidence for its decisions and adding to knowledge about how beginners become, or stop being, participants in endurance sport.
References
Braun, V., & Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77-101. https://doi.org/10.1191/1478088706qp063oa
Crawford, D. W., Jackson, E. L., & Godbey, G. (1991). A hierarchical model of leisure constraints. Leisure Sciences, 13(4), 309-320. https://doi.org/10.1080/01490409109513147
Cronbach, L. J. (1951). Coefficient alpha and the internal structure of tests. Psychometrika, 16(3), 297-334. https://doi.org/10.1007/BF02310555
Emanuel, E. J., Wendler, D., & Grady, C. (2000). What makes clinical research ethical? JAMA, 283(20), 2701-2711. https://doi.org/10.1001/jama.283.20.2701
Getz, D., & McConnell, A. (2011). Serious sport tourism and event travel careers. Journal of Sport Management, 25(4), 326-338. https://doi.org/10.1123/jsm.25.4.326
Groves, R. M. (2006). Nonresponse rates and nonresponse bias in household surveys. Public Opinion Quarterly, 70(5), 646-675. https://doi.org/10.1093/poq/nfl033
Johnson, R. B., & Onwuegbuzie, A. J. (2004). Mixed methods research: A research paradigm whose time has come. Educational Researcher, 33(7), 14-26. https://doi.org/10.3102/0013189X033007014
Kaplanidou, K., & Gibson, H. J. (2010). Predicting behavioral intentions of active event sport tourists: The case of a small-scale recurring sports event. Journal of Sport & Tourism, 15(2), 163-179. https://doi.org/10.1080/14775085.2010.498261
Peng, C.-Y. J., Lee, K. L., & Ingersoll, G. M. (2002). An introduction to logistic regression analysis and reporting. The Journal of Educational Research, 96(1), 3-14. https://doi.org/10.1080/00220670209598786
What the SPT 501 Module 9 instructions ask for
The SPT 501 final project typically asks students to submit a complete research proposal for a sport management study, combining and revising the work of earlier modules. Expect sections on the problem and purpose, research questions and hypotheses, literature review, research design, population and sampling, instrumentation, data collection, ethics, data analysis and limitations, sometimes with a timeline and budget. Strong proposals are internally consistent, so that every hypothesis has a measure and an analysis, every risk has a protection and every limitation is acknowledged. They revise earlier work in light of feedback and pilot results rather than pasting milestones together. The proposal should be specific enough that a review board or another researcher could judge whether the study can be done.
How this SPT 501 Module 9 final project example is built
The final project presents the complete proposal for a study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, a fictional Ames, Iowa company. About 29 percent of first-timers return against about 61 percent of experienced triathletes, leading to two questions and four hypotheses. A condensed review sets out the gap. The explanatory sequential design pairs an invitation to 6,300 first-time finishers, linked to records, with twenty interviews, pilot-tested scales, nonresponse checks and weighting, consent and linkage protections, logistic regression and thematic analysis. A six-month timeline, a $7,900 budget, contributions and limitations close it. Crawford and colleagues, Groves, Braun and Clarke and six other sources are cited.
Where the SPT 501 Module 9 rubric puts the points
The SPT 501 final proposal rubric typically rewards a clear problem and purpose, answerable questions and testable hypotheses, a literature review that establishes a gap, a design matched to the questions, defined sampling with attention to bias, valid and reliable measures, specific ethical protections, an analysis plan fixed in advance, a realistic timeline and budget, honest limitations and consistency across all sections. Proposals stand out when a reader could approve the study from the document alone. They lose points for earlier assignments stacked end to end without revision, hypotheses with no analysis or measures with no evidence. APA formatting and clear professional writing complete the grade.
SPT 501 Module 9 help: the mistakes that cost points
Lay out your hypotheses in a table and check that each has a measure, a sample large enough and an analysis. Read your ethics section beside your recruitment plan and confirm that every risk you named has a protection. Revise earlier sections in light of what you learned, from a pilot, a sampling check or feedback, and say what changed. Add a timeline that a real person could follow and a budget that covers every cost you implied. End with limitations stated plainly. Proposals often read as a stack of assignments; the strongest read as one plan in which each section depends on the others.
Get SPT 501 Module 9 written to your instructions
Share the SPT 501 Module 9 proposal requirements along with the pieces you have already written. A writer assembles and revises them into a complete research proposal, with problem, questions, literature, design, sampling, instrument, ethics, analysis plan, timeline, budget and limitations, consistent from section to section and fully referenced in APA. Your first SPT 501 final project is free and generally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 501 papers and related MS Sport Management samples
- SPT 501 Module 1 Discussion: What Makes a Question Researchable
- SPT 501 Module 2 Research Problem Assignment: The Problem and the Questions
- SPT 501 Module 3 Literature Review Assignment: Constraints, Careers and Coming Back
- SPT 501 Module 4 Discussion: Consent from Paying Customers
- SPT 501 Module 5 Research Design Assignment: A Mixed-Methods Design
- SPT 501 Module 6 Measurement Assignment: The Survey and Its Reliability
- SPT 501 Module 7 Discussion: Who Answers a Post-Race Survey
- SPT 501 Module 8 Analysis Plan Assignment: Regression and Themes
- SPT 501 Module 10 Discussion: Reading a Published Study Critically
- OL 600 Module 4 Discussion: Fair Hiring and Employment Law
- MKT 660 Module 5 Fundraising Appeal Assignment: Designing a Fundraising Appeal
- OL 640 Module 7 Milestone Three: Franchisor-Franchisee Relationship and Quality Control
- MKT 610 Module 7 Discussion: The Role and Risks of Sales Promotion
SPT 501 Module 9 questions, answered
Where can I find a free SPT 501 Module 9 final project sample?
The complete SPT 501 Module 9 research proposal for an invented triathlon retention study is on this page.
What sections does a research proposal include?
Usually the problem, questions and hypotheses, literature review, design, sampling, measures, ethics, analysis plan, limitations and often a timeline and budget.
Why should a proposal be internally consistent?
Because a hypothesis without a measure or an analysis cannot be tested, and reviewers check that every part connects.
Should a final proposal revise earlier assignments?
Yes; strong proposals incorporate feedback, pilot results and new insights rather than combining earlier drafts unchanged.
What does a budget add to a research proposal?
It shows the study is feasible and that costs implied by the design, such as incentives and transcription, have been planned.