SPT 501 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This SPT 501 Module 4 Discussion sample examines the ethics of a company studying its own customers, covering informed consent, linking survey answers to company records, incentives and privacy. SNHU SPT 501 (SPT-501) asks MS Sport Management students to treat research ethics as part of design rather than paperwork. The writer manages operations for Lakeline Endurance Events, an invented Iowa triathlon company that wants to survey and interview its first-time finishers. Because the researcher works for the race company, the athletes' consent, privacy and freedom to refuse need more care than a standard survey, and the post shows what changes as a result.

CourseSPT 501 Research Methods in Sport Management
ModuleModule 4
Paper typegraduate discussion post on the research ethics of studying an organization's own customers, covering informed consent, linking survey answers to company records, incentives and privacy
LengthAbout 440 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 501 Module 4

1

Module Four Discussion

When the Race Company Asks the Questions

Our study at Lakeline Endurance Events will survey athletes who finished their first triathlon at one of our Bluestem races, link their answers to our registration records to see who came back, and interview about twenty of them. Our owners suggested a $20 discount on next season's entry for anyone who completes the survey. Writing the ethics section made me see that a race company studying its own athletes raises problems a stranger's survey would not.

What this page is doingThe plan and the problem.
2

First, athletes may feel that saying no to the company that runs their races could affect them, even though it would not. Second, because we link survey answers to registration records, the data are not anonymous; at best they are confidential. Third, a $20 entry discount only helps people who plan to race again, which could feel like pressure and could also tilt our sample toward returners, the very outcome we are studying. Fourth, I work for the company that benefits from the results, so I have an interest in certain answers.

What this page is doingFour risks.
3

Emanuel et al. (2000) argue that ethical research requires, among other things, that benefits outweigh risks, that someone outside the project reviews it, that people agree with full knowledge of what is involved and that their privacy and freedom to leave are honored throughout. Taking those seriously, I will seek approval from my university's review board. The consent page will state plainly that answers will be linked to registration records, what that means and that declining has no effect on future entries. The survey will be hosted by the university, not our company system, and the list matching each code to an athlete's name will sit in a separate, locked file the company cannot open. No table or quote in any report will describe a group smaller than ten athletes, and interview quotes will carry no race name or finish time.

On incentives, Singer and Ye (2013) summarize decades of survey experiments: incentives lift participation, and money given up front tends to outperform rewards promised only after the last question. Following that, I will replace the entry discount with a small gift card offered to everyone who opens the survey, whether or not they finish, which also avoids favoring athletes who plan to race again. That matters for accuracy as well as fairness: Groves (2006) showed that missing answers skew a survey most when the people who stay silent differ on the outcome itself, and a discount that only appeals to returners would build that very difference into our sample.

What this page is doingWhat I will change.
4

Would you let a company employee conduct the interviews at all, or should someone outside the company do them?

What this page is doingFor classmates.
5

References

Emanuel, E. J., Wendler, D., & Grady, C. (2000). What makes clinical research ethical? JAMA, 283(20), 2701-2711. https://doi.org/10.1001/jama.283.20.2701

Groves, R. M. (2006). Nonresponse rates and nonresponse bias in household surveys. Public Opinion Quarterly, 70(5), 646-675. https://doi.org/10.1093/poq/nfl033

Singer, E., & Ye, C. (2013). The use and effects of incentives in surveys. The Annals of the American Academy of Political and Social Science, 645(1), 112-141. https://doi.org/10.1177/0002716212458082

What the SPT 501 Module 4 instructions ask for

This SPT 501 discussion generally asks students to consider the ethical issues in their proposed research, such as informed consent, confidentiality, risks to participants and the role of a review board. Expect to identify who your participants are, what could harm or pressure them and how your design protects them. Strong posts look past generic statements about consent to the risks specific to their study: the relationship between researcher and participants, whether data are anonymous or only confidential, how incentives might pressure people and who benefits from the results. They propose specific protections rather than promising to be careful. Replies should spot ethical risks in classmates' designs that the authors may have missed.

How this SPT 501 Module 4 discussion example is built

The post examines the ethics of a study at Lakeline Endurance Events, a fictional Ames, Iowa company whose operations manager wants to survey and interview first-time finishers and link answers to registration records. Four problems are named: athletes may fear that refusing affects future entries, linked data are not anonymous, a $20 entry discount could feel like pressure and the researcher works for the company that benefits. The responses are consent that names the linkage plainly, a university review board, a university-hosted survey with a separately held key, a smaller incentive for everyone who opens the survey and reporting only in groups of ten or more. Emanuel and colleagues, Singer and Ye and Groves are cited.

Where the SPT 501 Module 4 rubric puts the points

On ethics posts in SPT 501, instructors reward identification of the specific risks in the student's own study, an accurate distinction between anonymous and confidential data, attention to power relationships between researcher and participants, a reasoned view of incentives, concrete protections and engagement with research ethics sources. Posts gain credit when every protection answers a named risk. They lose points for boilerplate about consent, for calling linked data anonymous, for ignoring conflicts of interest or for no sources. The remaining credit comes from replies that find a risk a classmate overlooked and from a post supported by two APA citations, with ethics language used precisely.

SPT 501 Module 4 help: the mistakes that cost points

List everyone your study touches and ask what could go wrong for each: embarrassment, pressure to take part, exposure of private information. Ask whether you, as the researcher, have power over participants, as an employer, coach, teacher or company does. Decide honestly whether your data are anonymous, meaning no one can connect answers to a person, or only confidential, meaning you can but will not reveal it. Think about whether an incentive could make people feel they cannot refuse. Then match each risk with a specific protection. Posts often promise informed consent; the useful step is saying exactly what participants will be told, in the words they will read.

Get SPT 501 Module 4 written to your instructions

Paste the SPT 501 Module 4 prompt and describe whom your study will involve. A writer identifies the ethical risks in your design, from consent and privacy to incentives and conflicts of interest, proposes concrete protections and grounds them in research ethics sources, with a question for classmates. Your first SPT 501 post is free and comes back within two days in most cases. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 501 papers and related MS Sport Management samples

SPT 501 Module 4 questions, answered

Where can I find a free SPT 501 Module 4 Discussion sample?

The full SPT 501 Module 4 post on consent, privacy and incentives in an invented triathlon company's research sits on this page.

How are anonymous and confidential data different?

Anonymous data cannot be linked to a person by anyone, including the researcher; confidential data can be linked but are protected from disclosure.

Why does a researcher's relationship with participants matter ethically?

When the researcher has power over participants, such as a company over its customers, people may feel unable to refuse.

Can incentives make research unethical?

Incentives are generally acceptable, but large ones relative to participants' circumstances or tied to completion can feel coercive.

What does a review board do?

It reviews research involving people to judge whether risks are minimized, consent is informed and participants are treated fairly.