This MGT 605 Module 6 Discussion sample asks how a contractor decides whether to bid a project and how it should set the markup if it does. SNHU MGT 605 (MGT-605) turns here, midway through the MS in Management course, from estimating cost to pricing the bid. The post follows Kearsarge Building Company, a composite New Hampshire general contractor, deciding whether to spend its estimating team's next five weeks on a public technical center bid. It scores the pursuit against six factors, draws on studies of how contractors in the United States and Singapore set markup and how they price risk, and asks classmates which factor should count most.

CourseMGT 605 Construction Budgeting, Estimating & Bidding
ModuleModule 6
Paper typegraduate discussion post on the bid/no-bid decision and setting a markup
LengthAbout 380 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Management
UpdatedOctober 2026

Free sample paper for MGT 605 Module 6

1

Module Six Discussion

Five Weeks of Estimating Time Is the First Bid We Place

Before Kearsarge Building Company can decide what to bid on the Laconia career and technical center, it has to decide whether to bid at all. A public bid of this size will take our two senior estimators about five weeks, and while they work on it, they cannot price anything else. Backlog for next year already stands at 78 percent of what our crews and managers can handle, and five other contractors are prequalified.

What this page is doingThe first decision is about time.
2

Our leadership scores every bid from one to five on six factors. Laconia scored 5 on fit, because it uses our self-performed concrete and we have built four schools in five years; 4 on owner reliability, since the district pays on time; 3 on margin potential, because six bidders will squeeze price; 3 on risk, because of the occupied renovation and possible ledge; 4 on backlog need, since one more job of this size fills next year; and 3 on competition. That is 22 of 30, and our threshold is 20. I would bid.

What this page is doingScoring the pursuit.
3

Mochtar and Arditi (2001) surveyed large US contractors and found that most set prices by adding a markup to estimated cost, with little explicit study of what the market would bear. Dulaimi and Shan (2002) found that large and medium contractors in Singapore weighed markup factors differently, with the medium firms more sensitive to their need for work. Laryea and Hughes (2008), observing how contractors in the UK actually priced bids, found that risk was seldom priced through formal methods; it was handled through judgment, often at a final review meeting where commercial pressure trimmed it. That last finding worries me, because our own final reviews tend to cut the risk line first.

Applied to Laconia, our usual practice would add two percent for home office overhead and three to four percent profit. With six bidders, I suspect the winning margin will be thinner than that, and I would rather know how our five rivals have bid in the past than guess. Our files hold their numbers on more than a dozen public school bids, which we have never studied together.

What this page is doingWhat the research says about markup.
4

Which of the six factors would you weight double, and would your answer change if our backlog were 50 percent rather than 78?

What this page is doingYour turn.
5

References

Dulaimi, M. F., & Shan, H. G. (2002). The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Construction Management and Economics, 20(7), 601-610. https://doi.org/10.1080/01446190210159890

Laryea, S., & Hughes, W. (2008). How contractors price risk in bids: Theory and practice. Construction Management and Economics, 26(9), 911-924. https://doi.org/10.1080/01446190802317718

Mochtar, K., & Arditi, D. (2001). Pricing strategy in the US construction industry. Construction Management and Economics, 19(4), 405-415. https://doi.org/10.1080/01446190010020372

What the MGT 605 Module 6 instructions ask for

The Module 6 discussion in MGT 605 often asks how contractors decide whether to bid, which factors shape the markup they add to cost and how competition and risk enter the price. You may be asked to draw on your own experience or a case. A strong post treats the bid decision as an investment of scarce estimating time, uses explicit factors rather than gut feel, separates overhead from profit and risk in the markup and uses research on how contractors actually price rather than how textbooks say they should. It gives a clear recommendation for its example but stays open about the factor it is least sure of, so that classmates have something to test and dispute.

How this MGT 605 Module 6 discussion example is built

In the sample post, Kearsarge's leadership must decide whether to commit its two senior estimators to the Laconia technical center for five weeks. Backlog stands at 78 percent of next year's capacity, five other firms are prequalified, and the project suits Kearsarge's self-performed concrete and school experience. Scoring six factors from one to five gives the pursuit 22 of 30 points, enough to bid. On markup, the post notes that Mochtar and Arditi found large US contractors pricing mostly from cost, that Dulaimi and Shan found large and medium firms weighing factors differently and that Laryea and Hughes saw risk priced through judgment more than formula. It asks peers which factor they would weight most heavily.

Where the MGT 605 Module 6 rubric puts the points

Discussions on bid decisions and markup are typically graded on how well the factors are understood, how they are applied to an actual pursuit, how research is put to work and what the replies add. Strong posts weigh several factors explicitly, distinguish overhead, profit and risk in the markup and show how competition changes what a sensible markup is. Posts lose points when they treat markup as a fixed company percentage, when the decision rests on whether the firm likes the owner, when research is summarized without being applied and when replies only agree. A clear recommendation, with the factor that could reverse it named, shows the judgment the module is looking for. Admitting where the scoring depends on opinion, not data, is also rewarded.

MGT 605 Module 6 help: the mistakes that cost points

Treat the decision as a question of where to spend estimating time, since a public bid costs weeks of senior effort whether or not it wins. List the factors that matter to your firm, such as backlog, competition, fit with your crews, owner reliability, risk and margin potential, and score them openly. Then explain how markup is built: home office overhead, profit and any allowance for risk, and how the number of bidders pushes it down. Use a study or two on how contractors really price, not only how they should. Close with your recommendation and the factor most likely to change it. Asking peers to rescore one factor makes for good replies.

Get MGT 605 Module 6 written to your instructions

Bring the MGT 605 Module 6 discussion prompt and a project your firm is weighing. We score the bid/no-bid decision against clear factors, explain how markup is usually set and where research says contractors go wrong, and close with a question for peers. A first post is free and takes about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 605 papers and related MS in Management samples

MGT 605 Module 6 questions, answered

Where can I find a free MGT 605 Module 6 Discussion sample?

The entire MGT 605 Module 6 post is published here, scoring a contractor's decision to bid a public technical center and its approach to markup.

How do contractors decide whether to bid a project?

Many score the opportunity against factors such as backlog, competition, fit with their capabilities, owner reliability, risk and potential margin, and bid when the score clears a threshold.

What does a contractor's markup include?

Home office overhead not charged to the job, profit and sometimes an allowance for risk, added on top of the estimated direct cost and general conditions.

How does competition affect bid markup?

More bidders usually means lower winning markups, because each additional competitor raises the chance that someone bids below any given price.

Do contractors price risk with formal models?

Studies of contractors' practice suggest risk is more often priced through experience and judgment at a final review than through formal probability models.