MGT 605 is SNHU’s Construction Budgeting, Estimating & Bidding course. It centers on construction budgets, estimates and bids: owner budgets and why they miss, conceptual and square-foot estimating, estimate classes and contingency, pricing labor, equipment and materials, project budgets and cash flow, bid/no-bid decisions and markup, competitive bidding models, definitive estimates and alternates, procurement methods and complete bid proposals. Every module below opens a full sample paper or takes a free request for one; searches like "mgt 605 module 3", "MGT605 sample paper" and "MGT 605 milestone example" land on this page.
What MGT 605 is really about
MGT 605 is SNHU's graduate course on construction budgeting, estimating and bidding in the MS in Management construction management concentration, and its papers reward numbers a reader can rebuild: quantities times rates, allowances shown on their own lines and totals that reconcile from one stage to the next. A good paper always says what a figure is based on and how far it can be trusted.
The samples follow one composite firm: Kearsarge Building Company of Concord, New Hampshire, a general contractor with about $70 million of yearly volume that self-performs concrete and carpentry. It is pursuing a new two-story shop and lab wing and a renovation at a regional career and technical center in Laconia, bid publicly by a school district. The company, the district, the rivals and all figures are illustrative.
What MGT 605’s modules ask for
Across ten modules, MGT 605 commonly asks for discussions on owner budgets, estimate types, bid/no-bid decisions and procurement methods, assignments on conceptual estimating, pricing and competitive analysis, a project budget milestone, a definitive estimate and bid strategy milestone and a final bid proposal.
Where students lose points in MGT 605
MGT 605 work loses the most credit when figures do not reconcile between sections, when contingency, escalation, overhead and profit are hidden inside unit rates, when trade bids are compared without leveling their scope and when a markup is stated with no reasoning about competition or risk.
The MGT 605 drawers
MGT 605 Module 1 Discussion example
The first MGT 605 post introduces Kearsarge Building Company, a Concord, New Hampshire, general contractor weighing whether to chase a career and technical center whose school district fixed a $23.4 million construction budget two years before design was finished; it compares that figure with Kearsarge's own quick square-foot check of roughly $26 million, explains the gap with Flyvbjerg, Holm and Buhl's study of 258 public works projects, Kahneman and Lovallo's contrast between the inside and outside view and Odeck's finding that small road projects overran the most, and asks classmates what a bidder should do when the owner's number looks too low. Full sample paper, read it free.
MGT 605 Module 2 Conceptual Estimate Assignment example
The conceptual estimate prices the Laconia career and technical center from schematic drawings: it builds a cost per square foot from five of Kearsarge's past school jobs adjusted to 2026 prices and a Concord location, adds a five percent premium for shop ventilation and dust collection, prices the 1972 renovation and site work separately, adds a ten percent design contingency and fourteen months of escalation at four percent a year and arrives at $26.62 million, with a range of $22.6 to $31.9 million; it draws on Kim, An and Kang's comparison of regression, neural network and case-based estimating, Trost and Oberlender's factors behind early estimate accuracy and Akintoye's survey of what drives estimating practice. Full sample paper, read it free.
MGT 605 Module 3 Discussion example
The third MGT 605 discussion follows the Laconia technical center estimate as the drawings move from schematic to sixty percent: Kearsarge's figure falls from $26.6 million to $24.9 million once the district drops a shop mezzanine and narrows the renovation, and the post asks when an estimator should stop pricing by the square foot and start counting quantities, how much contingency each stage deserves and why contingency should shrink only as information grows; it uses Flyvbjerg's case for reference class forecasting, Cantarelli, Flyvbjerg, Molin and van Wee's four families of explanation for overruns and Trost and Oberlender's work on what makes early estimates accurate. Full sample paper, read it free.
MGT 605 Module 4 Pricing Assignment example
The pricing assignment builds Kearsarge's self-performed concrete package for the Laconia wing line by line: about 1,500 cubic yards of footings, frost walls, slab on grade and slab on deck; 3,991 labor hours from unit productivity rates at a burdened crew rate of $51.04; ready-mix, reinforcing and forming materials; a pump, a rented telehandler and winter protection; and an overtime allowance for six weeks of fifty-hour foundation work, drawing on Hanna, Taylor and Sullivan's model of productivity loss under extended overtime, Thomas's earlier review of scheduled overtime and Thomas and Horman's principles for matching crews to available work, and it arrives at $864,400. Full sample paper, read it free.
MGT 605 Module 5 Milestone One example
Milestone One turns Kearsarge's design development estimate into a working project budget for the Laconia technical center: twelve trade lines worth $21.05 million, split between quantities already measured and systems still priced by the square foot, general conditions of $1.18 million over a sixteen-month build, bond and insurance, a six percent design contingency and a year of escalation for $24.90 million; a quarterly billing curve that peaks above $6.7 million in each of the two middle quarters; a month-of-delay cost of about $74,000 in general conditions; and a plan for buying the subcontract packages before bid day, drawing on Flyvbjerg's reference class forecasting and on Chan and Kumaraswamy's and Assaf and Al-Hejji's surveys of what delays building projects. Full sample paper, read it free.
MGT 605 Module 6 Discussion example
The sixth MGT 605 discussion asks whether Kearsarge should commit its estimating team to the Laconia bid at all, given a backlog already at 78 percent of capacity, five other prequalified bidders and a project that suits its concrete crews, and how it should think about markup if it does; the post scores the pursuit against six factors, notes that Mochtar and Arditi found large US contractors pricing mostly from cost rather than from the market, that Dulaimi and Shan found large and medium firms weighing markup factors differently and that Laryea and Hughes saw risk priced more by judgment than by formula, and invites peers to name the factor they would weight most. Full sample paper, read it free.
MGT 605 Module 7 Competitive Analysis Assignment example
The competitive analysis studies the three rivals who bought bid documents for the Laconia technical center: Suncook Valley Construction, Contoocook Builders and Piscataqua General Contractors, whose bids on 34 past public jobs are expressed as ratios of Kearsarge's own cost estimate; it fits each rival's ratio to a normal curve, computes the chance of beating all three at markups from two to six percent with Friedman's method and with Gates's alternative, finds the expected profit peaks near 3.5 percent under Friedman and 4.5 percent under Gates, discusses the winner's curse that Capen, Clapp and Campbell described in oil lease bidding and recommends a markup between 3.5 and 4.0 percent on a cost of $24.68 million. Full sample paper, read it free.
MGT 605 Module 8 Milestone Two example
Milestone Two replaces the design development budget with Kearsarge's definitive estimate for the Laconia technical center on bid documents: twelve trade packages leveled from 38 subcontractor and supplier numbers to $22.37 million, general conditions, bond and insurance, a 1.5 percent bid contingency and a two percent home office charge for a cost of $24.77 million; it sets a 3.6 percent markup for a base bid of $25,664,000, prices three add alternates and a ledge unit price, explains the leveling of the mechanical bids that came in 13 percent over budget and guards the number against the winner's curse that Thaler reviewed and Bazerman and Samuelson showed in their coin-jar auctions, while Laryea and Hughes's account of bid-day reviews shapes how risk is kept in the price. Full sample paper, read it free.
MGT 605 Module 9 Discussion example
The ninth MGT 605 discussion takes up a question the school district put to every bidder at the prebid meeting: should the second phase of the technical center, a 30,000-square-foot gymnasium and commons, be bought by low bid again or through a construction manager at risk; Kearsarge's answer weighs what low bidding did well and badly on phase one, from honest price competition to mechanical systems priced before they were drawn, and draws on Bajari and Tadelis's theory of fixed-price and cost-plus contracts, Bajari, McMillan and Tadelis's evidence from Northern California building contracts on when owners negotiate and Drew and Skitmore's finding that contractors compete hardest within their own size range. Full sample paper, read it free.
MGT 605 Module 10 Final Project example
The final project assembles Kearsarge's complete bid proposal for the Laconia career and technical center: a summary for the district's committee, the project as Kearsarge understands it, the path from the district's $23.4 million budget through a $26.6 million schematic estimate and a $24.9 million design development budget to a $24.77 million definitive cost, a base bid of $25,664,000 with three add alternates and a ledge unit price, a sixteen-month schedule built around an occupied campus, clarifications and exclusions and the internal reasoning behind the price, drawing on Friedman's bidding model, Trost and Oberlender on estimate accuracy, Hanna, Taylor and Sullivan on overtime and Laryea and Hughes on how risk survives the final pricing meeting. Full sample paper, read it free.
Your classroom shows something else?
Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.
Using a MGT 605 sample the right way
Each MGT 605 sample picks up where the last left off, so the Laconia price can be followed from a two-minute square-foot check in January to a signed bid form in May; read the figures as much as the prose. For MGT 605 help on your own project, send the drawings or scope you have and your rubric; a first custom sample costs nothing and is usually ready within two days.
MGT 605 questions, answered
What does MGT 605 cover?
Construction budgeting, estimating and bidding: owner budgets, conceptual and definitive estimates, pricing labor, equipment and materials, bid strategy, competitive analysis and bid proposals.
What is the MGT 605 final project?
A complete budget, estimate and bid proposal for a construction project, presenting how the cost was built, the bid price with its components and the strategy behind it.
Is the contractor in the MGT 605 samples real?
No. Kearsarge Building Company, the Laconia school district and the rival firms are fictional, created so all ten samples follow one bid from start to finish.