MGT 550 Module 2 Communication Audit Assignment Example

Reviewed by Portia Lambrick, MBA

This MGT 550 Module 2 Communication Audit Assignment sample examines how information really moves through an organization and where it stalls. SNHU MGT 550 (MGT-550) asks MS Management students to assess internal communication with evidence. For Merrimack Linen and Uniform Company, a composite New Hampshire laundry with four plants, three shifts and a multilingual workforce, the paper surveys 410 employees on their satisfaction with communication, observes shifts, reviews a month of notices and traces one message from the owners to the floor. It judges channels by how much meaning they carry, finds the groups that are left out and recommends specific changes.

CourseMGT 550 Managing Through Communication
ModuleModule 2
Paper typegraduate assignment auditing an organization's internal communication
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Management
UpdatedOctober 2026

Free sample paper for MGT 550 Module 2

1

Taped to the Time Clock: A Communication Audit of Merrimack Linen and Uniform Company

[Student Name]

Southern New Hampshire University

MGT 550: Managing Through Communication

Communication Audit Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingMerrimack Linen and Uniform Company is fictional; survey results and observations are illustrative.
2

Taped to the Time Clock: A Communication Audit of Merrimack Linen and Uniform Company

Introduction

Merrimack Linen and Uniform Company's owners describe its communication as good: a monthly newsletter, an intranet, notices at every time clock and an open-door policy. Yet Concord workers heard about a possible plant closing from a delivery driver. This audit asks how messages actually move through the company's four plants and three shifts, which channels reach which employees and where messages stall or change. It describes the method, presents the evidence, analyzes it with communication theory and recommends five changes.

What this page is doingWhere the message stops.
3

The Organization

Merrimack employs 640 people: about 520 in production across plants in Manchester, Concord, Nashua and Keene, 70 drivers and 50 in offices. Plants run three shifts. About 45 percent of production staff speak English as a second language; the largest groups speak Spanish, Nepali, Swahili, French and Arabic. Supervisors are mostly promoted from the floor and receive no communication training.

What this page is doingFour plants, three shifts.
4

Method

Audit methods

MethodScope
Survey410 of 640 employees, offered in six languages, based on communication satisfaction dimensions
Shift observation12 shift starts across four plants and three shifts
Document reviewEvery notice, newsletter item and intranet post in March
Message tracingOne uniform policy change followed from owners to floor over two weeks

The survey used items adapted from Downs and Hazen (1977), who identified dimensions of communication satisfaction such as supervisor communication, organizational integration, media quality, communication climate and personal feedback.

What this page is doingFour sources of evidence.
5

Survey Results

Percent satisfied, by dimension and group

DimensionOffice staffDay shiftNight shiftSecond-language speakers
Supervisor communication71584139
Organizational integration66372219
Media quality62342517
Personal feedback54463835

Organizational integration, meaning information about the company's plans and changes, scores lowest everywhere outside the office. Night-shift workers and second-language speakers are the least satisfied on every dimension.

What this page is doingWho is satisfied and who is not.
6

Observations

At eight of twelve shift starts, supervisors gave no briefing beyond assignments. At the four where briefings happened, they lasted under three minutes and were delivered over running machines. Night-shift starts had no manager present at all; the lead operator read the assignment board. When observers asked night-shift workers how they learned about company changes, the most common answer was "from the day shift," followed by "from the drivers."

What this page is doingWhat happens at the start of a shift.
7

Document Review

In March, the company posted 31 notices, all in English, mostly taped to time clocks. Fourteen concerned safety or schedules; six concerned benefits; none explained business plans. The intranet carried 22 posts, but its logs showed that only 61 employees opened it during the month, almost all of them office staff. The newsletter, emailed monthly, reached the 190 employees with company email addresses.

What this page is doingWhat gets written.
8

Message Tracing

The owners approved a change requiring uniform shirts to be returned weekly instead of every two weeks. They emailed plant managers, who forwarded the email to supervisors, who were asked to "let people know." Two weeks later, observers asked 40 production workers about the change: 14 knew it accurately, 11 had heard a distorted version, such as a fine for late returns, and 15 had not heard at all. Most of the accurate knowers worked the day shift in Manchester.

What this page is doingOne policy, two weeks.
9

Analysis

Daft and Lengel (1986) ranked media by how much understanding they can transmit in a given time. A conversation in person, with tone, gesture and instant questions, sits at the top; a bulletin or form at the bottom. Equivocal or emotionally loaded news, they argued, belongs in the richer media, and plain routine notices can safely go through the thinner ones. Merrimack relies on its leanest channels, printed notices and email, for everything, including news about jobs. Its richest channel, the supervisor's face-to-face briefing, exists in name but is rarely used and is never prepared.

What this page is doingChannels and their fit.
10

Analysis

Welch and Jackson (2007) argued that internal communication should treat employees as several stakeholder groups with different needs, from all-employee news to team-level talk to project information, rather than as a single audience. Merrimack treats them as one: the same English notice for an office accountant and a Nepali-speaking night-shift washer. The groups with the least access to email and the intranet, and the least English, are also the ones most affected by plant changes.

What this page is doingDifferent audiences, different needs.
11

Strengths

Supervisors are trusted: when asked whom they would believe about a plant change, 68 percent of production workers named their supervisor first. Safety notices with pictures were understood across language groups. And the Keene plant manager, who walks the floor at every shift change, has the highest satisfaction scores in the company.

What this page is doingWhat works.
12

Recommendations

Recommendations ranked by impact and cost

RecommendationAddressesCost
Brief supervisors in writing and in person before any message goes to staffDistorted and lost messagesLow
Five-minute shift huddles with a manager present on every shift weeklyNight-shift isolationLow
Translate notices into the five main languages and add picturesSecond-language gapModerate
Text message alerts to personal phones, opt-in, in the employee's languageLack of email accessModerate
Train supervisors in briefing and listeningUnprepared supervisorsModerate
What this page is doingFive fixes.
13

Root Causes

The pattern has three causes. First, the company grew by acquiring plants, and each kept its own habits; only Keene built a practice of floor-level talk. Second, the owners think of communication as publishing: if a notice is posted or an email sent, the message has been delivered. Third, supervisors were promoted for technical skill and never told that passing on information, answering questions and reporting concerns upward are part of their job. None of these causes requires expensive technology to fix, but all of them require managers to change what they count as communicating.

What this page is doingWhy the gaps exist.
14

Limitations

The survey reached 64 percent of employees; drivers responded least, so their experience is underrepresented. Observation may have changed supervisors' behavior on the days observers were present. Tracing one message shows a pattern but not how common it is. A second trace in six months, after the fixes, would show whether they work.

What this page is doingWhat the audit cannot show.
15

Conclusion

Merrimack's communication works for office staff and fails for the night shift and second-language speakers, who will be most affected by the coming plant changes. Its most trusted channel, the supervisor, is its least prepared. Equipping supervisors and adding channels that reach every shift in every language would close most of the gap before the next big announcement.

What this page is doingRich channels for the people who need them.
16

References

Daft, R. L., & Lengel, R. H. (1986). Organizational information requirements, media richness and structural design. Management Science, 32(5), 554-571. https://doi.org/10.1287/mnsc.32.5.554

Downs, C. W., & Hazen, M. D. (1977). A factor analytic study of communication satisfaction. Journal of Business Communication, 14(3), 63-73. https://doi.org/10.1177/002194367701400306

Welch, M., & Jackson, P. R. (2007). Rethinking internal communication: A stakeholder approach. Corporate Communications: An International Journal, 12(2), 177-198. https://doi.org/10.1108/13563280710744847

What the MGT 550 Module 2 instructions ask for

The communication audit in MGT 550 usually asks you to assess how an organization communicates internally, often including channels, information flow, barriers and employees' satisfaction, and to recommend improvements. Expect to describe your method, present evidence, analyze strengths and weaknesses and connect findings to theory. A strong audit uses more than one source of evidence, such as a survey plus observation or document review, reports results for different groups rather than only an average, evaluates channels against what each message needs and ends with practical recommendations tied directly to what the evidence showed. Some versions let you audit a team or department rather than a whole company, and some require a copy of the survey instrument in an appendix, so read the deliverables list early.

How this MGT 550 Module 2 communication audit assignment example is built

The sample audits Merrimack Linen and Uniform Company's internal communication. A survey of 410 employees uses Downs and Hazen's dimensions of communication satisfaction; observers attend twelve shift starts; every notice posted in March is reviewed; and one message, a change in uniform policy, is traced from the owners to the floor. Using Daft and Lengel's media richness theory and Welch and Jackson's view of employees as distinct internal stakeholder groups, it finds that printed notices are English-only, the intranet reaches office staff but almost no one on the floor and supervisors pass on messages they were never briefed on. Night-shift and second-language workers score lowest. Five fixes follow.

Where the MGT 550 Module 2 rubric puts the points

Audit papers are usually judged on the soundness of the method, the quality and range of evidence, the depth of analysis, the use of communication theory and the practicality of the recommendations. Strong audits combine sources, break results down by group, explain why certain channels fail certain audiences and rank recommendations by cost and likely effect. Weak ones rely on the writer's impressions, report a single average, list every channel without judging fit and end with advice such as "improve communication" that no manager could act on. Clear tables and a candid statement of what the evidence cannot show also earn credit.

MGT 550 Module 2 help: the mistakes that cost points

Decide first what you want to learn: which channels people use, whether messages arrive intact and who gets left out. Use at least two methods, such as a short survey and a review of actual messages, and if you can, follow one real message from its source to the people it was meant for. Report results by groups that matter, such as shift, location, role or language. Judge each channel by whether it can carry the message it is used for; a printed notice may suit a holiday schedule but not news about jobs. End with a few specific recommendations, each tied to a finding.

Get MGT 550 Module 2 written to your instructions

Upload the MGT 550 Module 2 instructions and the organization you are auditing. We design the audit, gather the right mix of survey and observation evidence, judge each channel against its audience and recommend fixes ranked by cost and impact. The first audit paper costs nothing; expect it within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 550 papers and related MS Management samples

MGT 550 Module 2 questions, answered

Where can I find a free MGT 550 Module 2 Communication Audit Assignment sample?

This page has the full MGT 550 Module 2 communication audit of a four-plant laundry, with survey results and recommendations.

What is a communication audit?

A systematic review of how an organization communicates, using surveys, interviews, observation and message analysis to find what works, what fails and who is left out.

What is media richness theory?

Daft and Lengel's idea that channels differ in how much meaning they can carry, with face-to-face talk richest and written notices leanest, so uncertain or sensitive messages need richer channels.

What are the dimensions of communication satisfaction?

Downs and Hazen identified factors such as communication climate, supervisor communication, organizational integration, media quality and personal feedback.

Why report audit results by employee group?

Averages can hide groups that are poorly served, such as night shifts or second-language speakers, who may need different channels.