| Course | OL 667 Human Resource Information Systems |
|---|---|
| Module | Module 4 |
| Paper type | graduate milestone comparing an organization's current HR data system with at least two candidate HRIS through a gap assessment, current and future state visual maps and a comparison table |
| Length | About 1,110 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 667 Module 4
From Three Keyboards to One Record: A Gap Assessment and System Comparison for Wabash Valley Die Casting
[Student Name]
Southern New Hampshire University
OL 667: Human Resource Information Systems
Milestone One: Gap Assessment and Visual Maps
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
From Three Keyboards to One Record: A Gap Assessment and System Comparison for Wabash Valley Die Casting
Introduction
The Module 2 needs analysis traced every HR problem at the plant to one habit: each fact about an employee is keyed by hand into several unconnected records. This milestone measures how far today's practice is from practice with an HRIS in three areas, maps both states and compares two candidate systems against the requirements already defined. It argues that the largest gaps lie where HR data meets payroll and the production floor, which is the strongest reason to prefer a system that includes payroll and time rather than one that connects to the old payroll program.
Gap Assessment: Information Systems
Today the plant runs a stand-alone time and payroll program on a server in the office, fed by badge readers on the floor; insurance carriers' web portals; a certification spreadsheet on a shared drive; and paper files. None exchange data. The IT coordinator backs up the payroll server weekly; the spreadsheet has no access controls beyond the shared drive. In the future state, a cloud HRIS holds one record per employee, receives punches from the existing badge readers, feeds payroll and sends enrollment changes to carriers automatically. The gap is integration, security and the retirement of a server the plant must maintain itself.
Gap Assessment: Human Resources
Today a new hire's data is written on paper and typed into payroll; changes travel by paper form to the payroll clerk; benefits are keyed into carrier portals; certifications are typed into the spreadsheet from sign-in sheets. The HR team spends about 2,600 hours a year on this data entry. In the future state, new hires complete onboarding forms electronically, changes made once update every function and employees view their own pay, schedules and balances. The gap is roughly 1,500 hours a year of rekeying and the errors that come with it, including about 13 payroll corrections a week.
Gap Assessment: Operations, Finance and Quality
Supervisors today cannot see certifications when assigning people to lines, approve overtime on paper slips and request headcount reports from HR. The controller builds labor cost reports from payroll exports by hand and found $18,000 last year in premiums for former employees. The quality manager spends about 120 hours preparing training records for each customer audit. In the future state, supervisors see certifications and approve overtime on a tablet, the controller pulls labor cost by line directly and audit records are a report. The gap is speed and accuracy of information where it affects production, cost and customer audits.
Current State Map
Figure 1. Current state: systems, data flows and manual steps
| From | To | How data moves | Manual step |
|---|---|---|---|
| Applicant | HR paper file | Paper forms on first day | Yes |
| HR paper file | Payroll program | Generalist retypes | Yes |
| Badge readers | Payroll program | Automatic punches | No |
| Supervisor | Payroll clerk | Paper overtime slip | Yes |
| HR | Carrier portals | Generalist retypes enrollments | Yes |
| Training sign-in sheets | Certification spreadsheet | Generalist retypes | Yes |
| Payroll program | Controller | Export and hand-built report | Yes |
| Certification spreadsheet | Quality auditors | Matched by hand | Yes |
Seven of eight flows involve a person retyping or matching data. The only automatic flow is the badge punch.
Future State Map
Figure 2. Future state with an HRIS in place
| From | To | How data moves | Replaces |
|---|---|---|---|
| Applicant | HRIS | Electronic onboarding | Paper forms |
| HRIS employee record | Payroll | Same system or automatic link | Retyping into payroll |
| Badge readers | HRIS time module | Automatic punches | Stand-alone time program |
| Supervisor tablet | HRIS | Online overtime approval | Paper slips |
| HRIS | Carriers | Automatic enrollment feed | Portal retyping |
| Trainer | HRIS learning record | Entered once at sign-off | Spreadsheet |
| HRIS | Controller, quality manager | Standard reports | Hand-built reports |
The employee record sits at the center; every other flow reads from or writes to it. Two parts of the current state survive: the badge readers, which already capture punches reliably, and the paper sign-in sheet at safety training, which a trainer will now confirm in the system on a tablet before the class leaves the room. Everything between those points that a person now retypes becomes either automatic or a single entry. The maps also show what the plant gives up: the payroll server it controls today becomes a service it rents, which the security section of Milestone Two must address.
Comparing Two Systems
Two systems were shortlisted from four demonstrations. Vendor A sells one hosted package covering employee records, pay, timekeeping, insurance enrollment, training records and a phone app for employees. Vendor B offers a cloud core HR system with benefits, learning and self-service that would connect to the plant's existing payroll and time program through a nightly file. Prices below are the vendors' written quotes for 500 employees.
Table 1. Comparison of candidate systems
| Criterion | Vendor A: cloud suite | Vendor B: core HR with existing payroll |
|---|---|---|
| Subscription | $15 per employee per month, about $90,000 a year | $9 per employee per month, about $54,000 a year |
| Implementation fee | $50,000 | $35,000 plus $15,000 payroll interface |
| Existing payroll license | Retired ($28,000 a year saved) | Kept ($28,000 a year) |
| Payroll and time | Included, real time | Nightly file to old program |
| Reporting | Standard and custom reports, labor cost by line | Standard reports; payroll reports stay in old program |
| Platform | Browser and mobile apps; vendor hosted | Browser and mobile apps; vendor hosted |
| Self-service languages | English and Spanish | English only, Spanish planned |
| Ease of use (operator test) | 7 of 8 operators completed a pay stub task unaided | 5 of 8 completed it unaided |
| Vendor support | Named implementation consultant; 24-hour support | Email support; business hours |
| Fit with requirements | Meets all ten must-haves | Meets eight; payroll integration and Spanish only partly |
What Research Suggests About the Choice
Ngai and Wat (2006) found that organizations saw quick access to information as the main benefit of an HRIS and insufficient financial support as the main barrier, which explains Vendor B's appeal: it costs less in the first year. But the needs analysis showed that most errors arise where HR data meets payroll and time, the very connection Vendor B leaves to a nightly file. Parry and Tyson (2011) found that efficiency, service delivery and standardization were the goals e-HRM most often achieved; Vendor A is better placed to deliver all three because it removes the hand-offs rather than automating them. Marler and Fisher (2013) cautioned that evidence linking e-HRM to strategic outcomes is limited, so the comparison weighs practical gains, fewer errors and less rekeying, above promises of strategic analytics.
Conclusion
The widest gaps at the plant sit at the hand-offs between HR records and the pay, production and accounting work that depends on them. Both candidate systems would narrow it, but Vendor A closes the payroll gap while Vendor B leaves it open. Milestone Two will examine the full implementation costs of both systems and how each would protect confidential employee data.
References
Marler, J. H., & Fisher, S. L. (2013). An evidence-based review of e-HRM and strategic human resource management. Human Resource Management Review, 23(1), 18-36. https://doi.org/10.1016/j.hrmr.2012.06.002
Ngai, E. W. T., & Wat, F. K. T. (2006). Human resource information systems: A review and empirical analysis. Personnel Review, 35(3), 297-314. https://doi.org/10.1108/00483480610656702
Parry, E., & Tyson, S. (2011). Desired goals and actual outcomes of e-HRM. Human Resource Management Journal, 21(3), 335-354. https://doi.org/10.1111/j.1748-8583.2010.00149.x
What the OL 667 Module 4 instructions ask for
Milestone One of the OL 667 final project asks students to compare the organization's current HR data collection with at least two new HR information systems. Expect a gap assessment that contrasts the current and future state in three areas, information systems, human resources, and operations, finance and quality, and a visual map that illustrates the current state with no HRIS and the future state with one in place, showing interdependencies and which systems are replaced. A comparison of the candidate systems on objective criteria such as cost, reporting and platform, and subjective criteria such as ease of use and vendor support, completes the milestone. Four to five pages with at least three scholarly sources is typical.
How this OL 667 Module 4 milestone one example is built
The milestone continues with Wabash Valley Die Casting, an imagined plant in Indiana whose 450 hourly workers clock in on badge readers tied to a stand-alone payroll program, while HR keeps paper files and a certification spreadsheet. The gap assessment covers information systems, where nothing connects; HR, where every change is typed up to three times; and operations, finance and quality, where supervisors cannot see certifications and the controller pays premiums for former employees. Current and future state maps show what a single employee record replaces. Two candidates are compared: Vendor A, a cloud suite with HR, payroll, time, benefits and learning, and Vendor B, a cheaper core HR system that keeps the old payroll. Marler and Fisher, Ngai and Wat, and Parry and Tyson ground the analysis.
Where the OL 667 Module 4 rubric puts the points
OL 667 Milestone One is usually graded on a gap assessment covering information systems, human resources, and operations, finance and quality, visual maps that clearly show the current and future state and their interdependencies, a comparison of at least two systems on both objective and subjective criteria, accurate use of scholarly sources and clear organization. Papers whose maps show which systems and manual steps disappear do best on this OL 667 milestone. Expect deductions for maps that are just boxes of system names, for comparisons based on marketing claims, for leaving out how the new system connects to time clocks and payroll and for gap assessments that never quantify the problem.
OL 667 Module 4 help: the mistakes that cost points
Use your needs analysis to describe the current state in each of the three areas: which systems hold data, how data moves and where it is retyped or lost. Describe the future state in the same terms so the gap is clear. For the maps, draw boxes for each system or file and arrows for each data flow, mark manual steps and show which boxes disappear in the future state; a table can stand in for a drawing if the course allows. Choose at least two realistic systems and compare them on criteria you state in advance, such as cost, integration, reporting, platform, ease of use and support. Base costs on quotes or published pricing and label estimates as estimates.
Get OL 667 Module 4 written to your instructions
Upload the OL 667 Milestone One guidelines and your organization scenario. We write the gap assessment for information systems, HR and operations, build current and future state maps that show what each system replaces and compare at least two HRIS options on stated objective and subjective criteria, with research support. The first OL 667 Milestone One is free and usually ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 667 papers and related MS Organizational Leadership samples
- OL 667 Module 1 Discussion: What an HRIS Is For
- OL 667 Module 2 Needs Analysis: HRIS Needs Analysis
- OL 667 Module 3 Discussion: Technology Acceptance and Self-Service
- OL 667 Module 5 Discussion: Employee Data Privacy
- OL 667 Module 6 Milestone Two: Implementation Costs and Data Security
- OL 667 Module 7 Discussion: HR Analytics
- OL 667 Module 8 Discussion: Training and Adoption
- OL 667 Module 9 Final Project: HRIS Proposal
- OL 667 Module 10 Discussion: Algorithms in HR Decisions
- MKT 665 Module 2 Brand Story Audit Assignment: Brand Story Audit
- OL 655 Module 7 Milestone Three: Retention and Career Development Plan
- OL 645 Module 4 Discussion: Workplace Surveillance and Privacy
- MGT 630 Module 8 Milestone Two: The Productivity and Equipment Plan
OL 667 Module 4 questions, answered
Where can I find a free OL 667 Module 4 Milestone One sample?
The full OL 667 Milestone One is on this page: a gap assessment, current and future state maps and a comparison of two HRIS options for a die-casting plant.
What is a gap assessment for an HRIS?
A comparison of how HR information is handled now and how it would be handled with the new system, showing the gaps in processes, data and capabilities that the system must close.
What should a current state map show?
Each system, file and person that handles HR data, the flows between them and the manual steps where data is retyped, delayed or lost.
How do you compare HRIS vendors?
Against criteria stated in advance, both objective, such as cost, integration, reporting and platform, and subjective, such as ease of use, vendor support and fit with the organization.
What is the difference between an HCM suite and a core HRIS?
An HCM suite combines HR records, payroll, time, benefits and often learning in one system; a core HRIS manages employee records and may connect to separate payroll and time systems.