OL 667 Module 3 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 667 Module 3 Discussion sample asks whether employees will accept and use HR self-service technology, applied to a workforce that rarely uses computers at work. SNHU OL 667 (OL-667) takes up user acceptance in Module 3 of its MS Organizational Leadership course, before any system is chosen. At Wabash Valley Die Casting, a fictional Indiana plant, 450 hourly operators would be asked to check pay stubs and request time off on their phones or a break-room kiosk. The post applies the technology acceptance model, a unified theory of technology acceptance and a model of what makes electronic HR systems accepted, then asks classmates what would get their least technical coworkers to log in.

CourseOL 667 Human Resource Information Systems
ModuleModule 3
Paper typegraduate discussion post on whether employees will accept and use HR self-service technology, applied to a workforce that rarely uses computers at work
LengthAbout 400 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 667 Module 3

1

Module Three Discussion

Will Our Operators Log In?

If we buy an HRIS at Wabash Valley Die Casting, most of the users will be our 450 hourly operators, technicians and inspectors. We want them to see pay stubs, schedules and certifications and to request time off on their phones or at a kiosk in the break room. Some of them have never logged into anything at work. Several of our longest-serving operators told me they do not want "the plant on my phone." A few asked whether the app would track where they are.

What this page is doingThe question.
2

Davis (1989) found that people's use of a system was strongly related to how useful they believed it was and, to a lesser extent, how easy it seemed to use. Venkatesh et al. (2003) merged eight earlier models into a single theory: people intend to use a system, and do use it, when they expect it to help their work, expect it to be easy, feel others want them to use it and have the support to do so, with age, gender and experience shaping those effects. Stone et al. (2006) proposed a model specific to electronic HR systems in which informational, social, technological and individual factors, including privacy concerns, affect acceptance and effectiveness.

What this page is doingWhat acceptance research says.
3

Usefulness is our strongest argument. Operators already line up at HR to ask about pay, overtime and vacation balances; seeing that on a phone at 2 a.m. after third shift is genuinely useful. Effort matters too: the app must work in two or three taps and in Spanish as well as English. Social influence will come from coworkers more than from HR. And the privacy question deserves a straight answer: our app would not use location, and we should say so in writing.

What this page is doingWhat that means for our operators.
4

Make the first task the pay stub, the one thing everyone wants. Put two kiosks in the break rooms so no one has to use a personal phone. Ask one respected operator on each shift to try the app first and show others. Run five-minute demonstrations at shift start for two weeks. Measure adoption by the share of operators who log in at least once a month, by shift and age group, so we can see who we are missing.

What this page is doingWhat I would do.
5

What would make the least technical person you work with log in to a system like this, and how would you know they had stuck with it?

What this page is doingYour users.
6

References

Davis, F. D. (1989). Perceived usefulness, perceived ease of use, and user acceptance of information technology. MIS Quarterly, 13(3), 319-340. https://doi.org/10.2307/249008

Stone, D. L., Stone-Romero, E. F., & Lukaszewski, K. (2006). Factors affecting the acceptance and effectiveness of electronic human resource systems. Human Resource Management Review, 16(2), 229-244. https://doi.org/10.1016/j.hrmr.2006.03.010

Venkatesh, V., Morris, M. G., Davis, G. B., & Davis, F. D. (2003). User acceptance of information technology: Toward a unified view. MIS Quarterly, 27(3), 425-478. https://doi.org/10.2307/30036540

What the OL 667 Module 3 instructions ask for

The third OL 667 discussion asks what determines whether employees and managers accept and use an HRIS, especially self-service features. Expect to apply models of technology acceptance, which hold that people use a system when they believe it is useful and easy to use and when social influence and supporting conditions encourage them, to a particular group of users. Research on electronic HR systems adds factors such as the information a system provides, social norms, the technology itself and individual differences, including concerns about privacy. Strong posts identify the users most likely to resist, explain why and propose specific steps. Replies should ask classmates how they would measure whether users had actually adopted the system.

How this OL 667 Module 3 discussion example is built

The sample comes from the HR manager of Wabash Valley Die Casting, a composite aluminum die-casting plant in Indiana. Its 450 hourly operators would be asked to view pay stubs, schedules and certifications and request time off through a phone app or a kiosk in the break room. Some operators have never logged into anything at work, several older employees say they do not want the plant on their personal phones and a few worry the app will track them. the usefulness and ease-of-use model from Davis, the unified acceptance theory of Venkatesh's team and the model of electronic HR acceptance by Stone, Stone-Romero and Lukaszewski suggest starting with tasks operators want, offering kiosks as well as phones and explaining exactly what the app does and does not collect.

Where the OL 667 Module 3 rubric puts the points

Grading of the third OL 667 discussion generally rewards an accurate account of technology acceptance research, a specific analysis of the users in question, attention to factors such as usefulness, ease of use, social influence, facilitating conditions and privacy, practical proposals and replies that test classmates' assumptions about their users. Posts that plan for the most reluctant users, rather than the average one, earn the most credit. Credit falls for assuming that a good system will be used automatically, for training plans that ignore why people resist, for overlooking privacy concerns or for replies that share preferences about apps without asking how adoption would be measured. Instructors also credit posts that respect employees' choice not to use personal devices.

OL 667 Module 3 help: the mistakes that cost points

Describe the users: their jobs, schedules, access to computers or phones and comfort with technology. Read the main acceptance models and identify which factors matter most for this group, such as whether the system is useful to them, easy to use, encouraged by coworkers and supervisors and supported with devices and help. Look for concerns specific to HR systems, such as privacy and distrust of monitoring. Decide which users are most likely to resist and why. Propose steps that address those reasons: a first task people want, alternatives to personal phones, short training on shift and a clear statement of what data is collected. Close by asking OL 667 classmates how they would know their users had truly adopted the system.

Get OL 667 Module 3 written to your instructions

Describe the employees who would use your organization's HR self-service and paste the OL 667 Module 3 prompt. Our writers apply technology acceptance research to that workforce, identify what would help or hinder use and propose practical steps, ending with a question for OL 667 classmates about winning over reluctant users. Your first OL 667 acceptance post is free in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 667 papers and related MS Organizational Leadership samples

OL 667 Module 3 questions, answered

Where can I find a free OL 667 Module 3 Discussion sample?

This page holds the full OL 667 Module 3 post on whether hourly operators at a die-casting plant will use HR self-service.

What is the technology acceptance model?

A model holding that people's intention to use a system depends mainly on how useful they believe it is and how easy they believe it is to use.

What is UTAUT?

A theory combining earlier acceptance models: use rises when people expect a system to improve their work, expect little effort, sense that others want them to use it and have the help they need.

What is employee self-service in an HRIS?

Features that let employees view and update their own information, such as pay stubs, addresses, benefits and time-off requests, without going through HR.

How can organizations increase HRIS adoption?

By making the first tasks useful to employees, keeping the system simple, providing devices and help, involving supervisors and being clear about privacy.