OL 667 Module 2 Needs Analysis Example

Reviewed by Portia Lambrick, MBA

This OL 667 Module 2 Needs Analysis sample examines an organization's HR processes, users and data to define the requirements a new human resource information system must meet. SNHU OL 667 (OL-667) has MS Organizational Leadership students complete this analysis before they compare any systems. Our plant, Wabash Valley Die Casting, is a composite 500-employee Indiana die caster whose hiring, benefits, certifications and reviews run on paper and spreadsheets beside a stand-alone time and payroll program. Drawing on research about how technology is reshaping HR, case evidence on what e-HRM projects achieve and a working definition of e-HRM, the paper sets must-have requirements and measurable goals.

CourseOL 667 Human Resource Information Systems
ModuleModule 2
Paper typegraduate assignment analyzing an organization's HR processes, users and data to define the requirements a new human resource information system must meet
LengthAbout 1,130 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 667 Module 2

1

Entered Once, Used Everywhere: An HRIS Needs Analysis for Wabash Valley Die Casting

[Student Name]

Southern New Hampshire University

OL 667: Human Resource Information Systems

Needs Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe plant's processes, interviews and error counts in this OL 667 analysis are invented.
2

Entered Once, Used Everywhere: An HRIS Needs Analysis for Wabash Valley Die Casting

Introduction

Wabash Valley Die Casting runs aluminum die-casting, trimming and machining lines around the clock for automotive and appliance customers. Its 500 employees include 450 hourly operators, maintenance technicians and inspectors who clock in and out on three shifts, and 50 salaried managers, engineers and staff. HR consists of a manager, three generalists and a payroll clerk. This needs analysis documents how HR information is handled today, who needs it and what is going wrong, and defines the requirements and goals a new human resource information system must meet.

What this page is doingSets the scene at the plant.
3

Approach

The analysis drew on three sources: process walkthroughs, in which each HR process was followed from start to finish over two weeks; interviews with the HR team, the payroll clerk, three shift supervisors, the quality manager, the controller, the IT coordinator and eight hourly operators chosen across shifts; and counts from records, including payroll corrections, benefit invoices and time spent on recurring reports. Electronic HRM has been defined as an umbrella term for joining HR work with information technology so as to create value for employees and managers alike (Bondarouk & Ruël, 2009). That definition shaped the approach: the analysis asked what each group of users, not only HR, needs.

What this page is doingExplains how the analysis was done.
4

Hiring and Onboarding

Applications arrive through a job board and email. Selected candidates complete paper forms on their first day, including the I-9, tax withholding, emergency contacts and the handbook acknowledgment. A generalist then types the new hire's information into the payroll program and creates a paper file. Information is entered three times: on the application, on paper forms and in payroll. The plant hired 96 hourly employees last year, and onboarding paperwork took about two hours of HR time per hire.

What this page is doingDocuments the first process.
5

Time and Payroll

Hourly employees clock in and out with badges. The time system is part of a stand-alone payroll program that the payroll clerk updates by hand whenever someone is hired, changes shifts, receives a raise or leaves. Supervisors approve overtime on paper slips. The clerk made 702 corrections to paychecks last year, about thirteen a week, mostly from late or missing updates such as shift differentials not applied after a shift change. Each correction takes about an hour, and some overpayments are never recovered.

What this page is doingDocuments the second process.
6

Benefits

Benefits enrollment uses paper forms that the generalists key into the insurance carriers' portals. Terminations are reported to carriers by email. In last year's audit of carrier invoices, the controller found $18,000 in premiums paid for 11 people who had left the plant, some of them months earlier.

What this page is doingDocuments the third process.
7

Certifications and Training

Forklift, overhead crane, lockout and tagout, and quality inspection certifications are tracked in a spreadsheet. The quality manager must show auditors from the plant's automotive customers that every operator on a controlled process is trained and current. Preparing for each audit takes about 120 hours of combined HR and quality staff time, mostly matching names on sign-in sheets to the spreadsheet. Supervisors cannot see certifications when they assign people to lines, so unqualified operators are occasionally assigned by mistake.

What this page is doingDocuments the fourth process.
8

Performance and Records

Annual reviews for hourly employees use a paper form filed in personnel folders; no one can report on review completion or ratings without pulling folders. Disciplinary records are in the same folders. Recurring reports, such as headcount by department, turnover by shift and overtime by line, are built by hand from payroll exports each month, taking about a day.

What this page is doingDocuments the remaining processes.
9

Data Quality Today

Before any system can be chosen, the plant must know the state of the data it would move. A sample of 50 paper files compared with payroll found 9 with a different address, 6 with an outdated emergency contact and 4 with a pay rate that did not match the last signed change form. The certification spreadsheet listed 31 operators whose crane or forklift certification had expired, 12 of whom had in fact renewed on paper sign-in sheets that were never entered. These gaps mean data conversion will need cleanup time, not just scanning, and the requirements below include an audit trail so that the next set of records does not drift the same way.

What this page is doingNotes the condition of the records.
10

What Users Need

Information needs by user group

User groupMain needs
HR generalistsEnter data once; electronic onboarding; certification tracking with reminders
Payroll clerkHires, changes and terminations flow automatically to payroll
SupervisorsSee who is certified for each line; approve overtime and time off online
Quality managerTraining records that can be shown to auditors in minutes
ControllerAccurate headcount and labor cost by line; benefit reconciliation
Hourly operatorsSee pay stubs, schedules and time-off balances without visiting HR

Operators were clear that they rarely sit at computers. Six of eight said they would use a phone app; two said they would prefer a kiosk in the break room.

What this page is doingSummarizes interviews.
11

Requirements

Requirements by priority

RequirementPriority
Single employee record shared by HR, payroll, benefits and trainingMust-have
Integration with badge time clocks and payrollMust-have
Electronic onboarding including I-9 and tax formsMust-have
Certification tracking with expiration alerts and supervisor viewMust-have
Role-based security for pay, medical and disciplinary dataMust-have
Employee self-service on mobile phones in English and SpanishMust-have
Online overtime and time-off approvalMust-have
Benefits enrollment with carrier data feedsMust-have
Standard reports for headcount, turnover and overtimeMust-have
Audit trail for changes to pay and recordsMust-have
Performance review forms and trackingNice-to-have
Applicant trackingNice-to-have
Learning content deliveryNice-to-have
Analytics dashboardsNice-to-have
What this page is doingDefines and ranks what the system must do.
12

Goals

Within twelve months of going live, the new system should reduce payroll corrections from about thirteen a week to three or fewer; eliminate premiums paid for former employees; reduce audit preparation time from 120 hours to 30; cut onboarding paperwork time per hire from two hours to thirty minutes; and allow any supervisor to see an operator's certifications on a phone within a minute.

What this page is doingSets measurable targets.
13

What the Research Suggests About Expectations

Parry and Tyson (2011), studying ten UK organizations that had introduced e-HRM, found that goals of efficiency, service delivery and standardization were commonly realized, while evidence that e-HRM transformed HR into a more strategic function was more limited. Stone et al. (2015), reviewing how technology is changing HR processes, noted both benefits, such as efficiency and access to information, and risks, such as reduced personal contact and threats to privacy. The plant's goals are deliberately practical, aimed at the efficiency and service gains that research suggests are achievable, while the nice-to-have requirements leave room for analytics later.

What this page is doingGrounds the goals.
14

Conclusion

Every HR process at the plant suffers from the same problem: the same facts keyed by hand into records that never reconcile. The ten must-have requirements and five goals define what a new system must do. Milestone One will compare the current state with the future state and assess two candidate systems against these requirements.

What this page is doingConnects to Milestone One.
15

References

Bondarouk, T. V., & Ruël, H. J. M. (2009). Electronic human resource management: Challenges in the digital era. The International Journal of Human Resource Management, 20(3), 505-514. https://doi.org/10.1080/09585190802707235

Parry, E., & Tyson, S. (2011). Desired goals and actual outcomes of e-HRM. Human Resource Management Journal, 21(3), 335-354. https://doi.org/10.1111/j.1748-8583.2010.00149.x

Stone, D. L., Deadrick, D. L., Lukaszewski, K. M., & Johnson, R. (2015). The influence of technology on the future of human resource management. Human Resource Management Review, 25(2), 216-231. https://doi.org/10.1016/j.hrmr.2015.01.002

What the OL 667 Module 2 instructions ask for

The Module 2 assignment in OL 667 asks students to conduct a needs analysis for a human resource information system. Expect to describe the organization's current HR processes, such as hiring, onboarding, time and payroll, benefits, training and performance management, identify who uses HR information and what they need from it, and document problems with the current approach. From that analysis, define the requirements a new system must meet, distinguishing essential requirements from desirable ones, and set measurable goals the system should achieve. The strongest analyses start from processes and users, not from software features, and they use evidence such as error counts, time spent and users' own descriptions of their needs.

How this OL 667 Module 2 needs analysis example is built

The sample analyzes Wabash Valley Die Casting, a made-up aluminum die-casting plant in Indiana with 450 hourly employees on three shifts and 50 salaried staff. It follows six processes, hiring and onboarding, time and payroll, benefits, safety and quality certifications, performance reviews and reporting, and finds the same root problem in each: data typed by hand into separate places. Interviews with HR staff, payroll, three supervisors, the quality manager and eight operators define what each group needs. Fourteen requirements are ranked as must-have or nice-to-have, and five goals are set, from fewer payroll corrections to certification answers in minutes. Stone and colleagues on technology and HR, Parry and Tyson on e-HRM outcomes and Bondarouk and Ruël's definition of e-HRM support the analysis.

Where the OL 667 Module 2 rubric puts the points

OL 667 needs analyses are generally graded on an accurate description of current HR processes, identification of users and their information needs, evidence of problems with the current approach, clearly stated requirements prioritized by importance, measurable goals for the new system and research support. Analyses grounded in interviews and data, rather than assumptions, score best in OL 667. Graders deduct for requirement lists copied from vendor brochures, for skipping groups of users such as hourly employees or supervisors, for goals that cannot be measured, or for jumping to a specific product before needs are defined. The writing should be organized so the requirements can be carried straight into the gap assessment in Milestone One.

OL 667 Module 2 help: the mistakes that cost points

Map each HR process from start to finish: who begins it, what forms or systems it passes through, who rekeys data and where errors appear. Talk to the people who use HR information, including supervisors and hourly employees, not only HR staff, and ask what they need and what frustrates them. Count what you can, such as payroll corrections, hours of data entry or days to answer a question. Turn the findings into requirements and mark each as essential or desirable, with a reason. Set a few goals the system should achieve, each with a number and a date. Leave product names out; this assignment defines the problem the products will be judged against.

Get OL 667 Module 2 written to your instructions

Send the OL 667 Module 2 directions and describe your organization's HR processes. We analyze each process, its users and its data, interview findings or assumptions, separate must-have from nice-to-have requirements and set measurable goals for a new system, with research on e-HRM goals and outcomes. There is no charge for your first OL 667 needs analysis, and most are delivered within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 667 papers and related MS Organizational Leadership samples

OL 667 Module 2 questions, answered

Where can I find a free OL 667 Module 2 Needs Analysis sample?

The complete OL 667 Module 2 needs analysis is on this page, defining what a 500-employee die-casting plant needs from a new HRIS.

What is an HRIS needs analysis?

A study of an organization's HR processes, users and information needs that defines the requirements and goals a new system must meet before products are compared.

Who should be interviewed for an HRIS needs analysis?

HR staff, payroll, managers and supervisors, IT, finance and a sample of employees who will use self-service, since each group needs different things from the system.

What is the difference between a must-have and a nice-to-have requirement?

A must-have requirement is essential for the system to meet its goals, such as payroll integration; a nice-to-have adds value but could be dropped if cost or time requires.

What goals should an HRIS have?

Specific, measurable improvements, such as fewer payroll errors, less time on data entry, faster answers to managers' questions and accurate compliance records.