| Course | QSO 690 Topics in Operations Management |
|---|---|
| Module | Module 2 |
| Paper type | graduate assignment comparing offshore, nearshore and in-house manufacturing locations by total landed cost, inventory and lead-time effects, quality, risk and strategic fit, and recommending a sourcing plan |
| Length | About 1,120 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 690 Module 2
Sixteen Weeks Is Too Long for Snow: Where Rimefield Should Make Its Hydraulic Units
[Student Name]
Southern New Hampshire University
QSO 690: Topics in Operations Management
Location Decision Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Sixteen Weeks Is Too Long for Snow: Where Rimefield Should Make Its Hydraulic Units
Introduction
Rimefield Plow & Spreader buys about 9,400 hydraulic power units a year, the motor, pump, valve and reservoir assemblies that raise, angle and power its plows and spreaders. For eight years they have come from a supplier in China. Its price is the lowest Rimefield has been quoted, but the 16-week lead time means the bulk of each season's order must be placed in May, before dealers have placed their own orders and long before anyone knows how much snow will fall. Last season Rimefield ran 1,100 units short in November and paid about $96,000 to air-freight replacements, while 700 units of a model that sold poorly remained on the shelf in March. This paper compares three locations for the units, China, a contract manufacturer in Monterrey, Mexico, and an assembly cell in Rimefield's own Brainerd plant, on total landed cost, quality, risk and fit with the business, and recommends a sourcing plan.
Why the Question Is Being Asked Now
Fratocchi et al. (2014) define reshoring as a decision to move production back toward the home country and note that firms reverse earlier offshoring for many reasons, including hidden costs, quality problems and the need to be close to customers. Ellram et al. (2013) surveyed managers about what drives manufacturing location and found that the importance of drivers such as cost, trade policy, risk and proximity varied by region, with North America viewed favorably on trade policy but also as carrying policy risk. Rimefield's situation reflects several of these drivers at once: the tariffs added to Chinese hydraulic components since 2018, a seasonal market that punishes long lead times and a field failure rate on the Chinese units that dealers complain about.
The Three Options
The Chinese supplier quotes about $312 per unit free on board, which becomes about $410 delivered to Brainerd after ocean freight, the tariff, brokerage and inland freight. A contract manufacturer in Monterrey, which already builds similar units for agricultural equipment makers, quotes $355 per unit with about $14 of truck freight and, since the trade pact among the three North American countries waives the duty, $369 delivered, with a three-week lead time. An in-house assembly cell in Brainerd would buy pumps, motors and valves from U.S. and Mexican suppliers for about $210 per unit and add about $175 of labor and overhead and about $26 per unit to recover a $1.2 million investment over five years, for about $411, with a one-week lead time.
Total Landed Cost
Total cost per hydraulic power unit
| Cost element | China | Monterrey | Brainerd cell |
|---|---|---|---|
| Delivered price or build cost | $410 | $369 | $411 |
| Inventory carrying (pipeline and safety stock at 20% a year) | $35 | $7 | $3 |
| Warranty and field failure cost | $11 | $6 | $4 |
| Shortage expediting, averaged per unit | $10 | $2 | $0 |
| Total cost per unit | $466 | $384 | $418 |
The inventory line is the largest hidden cost. With a 16-week lead time, about 2,900 units are always in transit or on order, worth about $1.2 million, plus about six weeks of safety stock to cover the uncertainty of a forecast made in spring. Monterrey's three-week lead time cuts that to a fraction. Warranty figures for China come from Rimefield's own records, showing about 1.8 percent of units failing in the first year; the Monterrey figure is the contract manufacturer's record with its agricultural customers, discounted for Rimefield's harsher winter duty; the in-house figure is an estimate. Shortage costs are last season's air freight spread over the year's volume.
Risks and Strategic Fit
Each option carries risks that cost figures do not show. China carries tariff risk that could rise again, ocean freight volatility and the forecasting penalty of long lead times. Monterrey carries currency risk from the peso, the risk that a capable contract manufacturer with other customers gives Rimefield's units lower priority in its own busy season, and the risk of being a new and untested relationship. Brainerd carries the risk of a skills gap, since Rimefield has never assembled hydraulic systems, competition for the same skilled workers who are scarce in its welding department, and the cost of being wrong at a volume that barely justifies the investment. Gray et al. (2013) caution that reshoring decisions are often made in response to headlines and recent cost changes and call for research on how firms evaluate them; Rimefield's evaluation is meant to be durable rather than a reaction to one bad season.
Recommendation
The recommendation is to move about 80 percent of the volume to Monterrey for next season, keeping about 20 percent with the Chinese supplier for one more season as a hedge while the new relationship proves itself. Monterrey has the lowest total cost by a wide margin, its three-week lead time allows Rimefield to order closer to the season and to reorder during it, and its location allows Rimefield's engineers to visit within a day. The contract will include a capacity reservation for August through November, quality targets with warranty chargebacks and a price adjustment clause tied to the peso within a band.
Transition Plan
The change has to be made without jeopardizing the next busy season. Monterrey will first build 200 pilot units in February, which Rimefield will test on its own hydraulic test stand and on three municipal trucks through the end of winter. If the pilot units pass, production orders begin in April, with deliveries weekly from June. The Chinese supplier's final order for the remaining 20 percent will be placed in May as usual, so that a failure in Monterrey still leaves Rimefield with a fallback. A Rimefield quality engineer will spend two days a month at the Monterrey plant through the first season, and the purchasing team will hold a weekly call during August through November to review the coming month's schedule against dealer orders.
Triggers for Revisiting
The in-house option is not rejected permanently. It becomes attractive if annual volume rises above about 14,000 units, which would spread the cell investment further, if Monterrey's on-time delivery falls below 95 percent during the busy season, or if the peso strengthens by more than 15 percent. The decision will be reviewed each March with the season's data.
Conclusion
Compared on price, China is close to an in-house cell and only somewhat more expensive than Mexico. Compared on total landed cost, China is the most expensive option by a wide margin, because a 16-week lead time in a seasonal business ties up inventory and causes both shortages and leftovers. Moving most of the volume to Monterrey, keeping a small Chinese hedge for one season and setting clear triggers for bringing assembly in-house gives Rimefield lower cost, faster response and a decision it can revisit with evidence.
References
Ellram, L. M., Tate, W. L., & Petersen, K. J. (2013). Offshoring and reshoring: An update on the manufacturing location decision. Journal of Supply Chain Management, 49(2), 14-22. https://doi.org/10.1111/jscm.12019
Fratocchi, L., Di Mauro, C., Barbieri, P., Nassimbeni, G., & Zanoni, A. (2014). When manufacturing moves back: Concepts and questions. Journal of Purchasing and Supply Management, 20(1), 54-59. https://doi.org/10.1016/j.pursup.2014.01.004
Gray, J. V., Skowronski, K., Esenduran, G., & Rungtusanatham, M. J. (2013). The reshoring phenomenon: What supply chain academics ought to know and should do. Journal of Supply Chain Management, 49(2), 27-33. https://doi.org/10.1111/jscm.12012
What the QSO 690 Module 2 instructions ask for
The QSO 690 Module 2 assignment usually asks students to analyze a manufacturing or sourcing location decision in light of current debates about offshoring, nearshoring and reshoring. Expect to compare locations on cost and on the factors that cost comparisons often leave out: lead time and inventory, quality, flexibility, risk, intellectual property and proximity to customers and engineering. Strong papers build a total landed cost per unit rather than comparing prices, connect lead time to the company's demand pattern, quantify what they can and discuss the rest, consider partial or staged moves rather than all-or-nothing choices, and set conditions under which the decision should be revisited. Research on why firms move production, and back, gives the analysis its frame.
How this QSO 690 Module 2 location decision assignment example is built
The assignment decides where Rimefield Plow & Spreader, a fictional Minnesota snowplow maker, should source 9,400 hydraulic power units a year: China at about $410 landed with 16 weeks' lead time, a Monterrey contract manufacturer at about $369 with three weeks or its own Brainerd plant at about $411 with one week. Adding pipeline and safety stock, warranty failures and last season's air freight gives about $466 per unit from China, $384 from Mexico and $418 in-house. Weighing tariff, currency, capacity and skills risks, the paper moves 80 percent of volume to Monterrey, keeps 20 percent in China for one season and sets triggers for in-house assembly. Ellram and colleagues, Fratocchi and colleagues and Gray and colleagues are cited.
Where the QSO 690 Module 2 rubric puts the points
Marks in the QSO 690 location assignment typically go to a complete total landed cost for each option, lead time connected to demand and inventory, quality and warranty effects included, risks identified and where possible quantified, a recommendation that considers staged or partial moves, triggers for revisiting the choice and research on location decisions. Papers stand out when the analysis reverses the answer a price comparison would give. They lose points for comparing unit prices only, for ignoring inventory carrying costs, for treating risks as a list with no weight or for a recommendation with no conditions for change. Comparison tables a buyer could check, with APA references, finish the mark.
QSO 690 Module 2 help: the mistakes that cost points
Start with the price, then add everything between the supplier's dock and your line: freight, duties, brokerage, inventory in transit, safety stock for long or uncertain lead times, quality failures and the cost of shortages or leftovers caused by ordering too early. Compute a cost per unit for each location. Then look at what numbers miss: risk of tariffs or disruption, currency, capacity at the supplier, your own skills if you make the part, and how close each location is to your engineers. Consider moving part of the volume rather than all of it. Finish with triggers, such as volume or cost changes, that would reopen the decision. Papers often compare wage rates and stop, which misses most of what location actually costs.
Get QSO 690 Module 2 written to your instructions
Share the QSO 690 Module 2 instructions and your sourcing data. A writer builds a total landed cost for each location, adds inventory, quality and shortage effects, weighs tariff, currency, capacity and skills risks, recommends a sourcing plan with triggers for revisiting it and supports the analysis with research on manufacturing location. The first QSO 690 assignment costs nothing and is normally back in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 690 papers and related MS Operations Management samples
- QSO 690 Module 1 Discussion: Which Topics Matter for a Seasonal Plant
- QSO 690 Module 3 Automation Assignment: A Robotic Welding Cell and the Welders
- QSO 690 Module 4 Discussion: Selling Spreader Data to Towns
- QSO 690 Module 5 Forecasting and Postponement Assignment: Last Winter's Snow and the Final Build
- QSO 690 Module 6 Closed-Loop Assignment: Remanufacturing Trade-In Plows
- QSO 690 Module 7 Discussion: Smart Spreaders and Salty Lakes
- QSO 690 Module 8 Maintenance Analytics Assignment: Predicting Laser Cutter Failures
- QSO 690 Module 9 Final Project: A Three-Year Operations Agenda
- QSO 690 Module 10 Discussion: Seasonal Workers in an Automated Plant
- BMB 655 Module 2 Financial Statements Assignment: Reading a Publisher's Statements
- MKT 675 Module 3 Milestone One: Issues Inventory and Stakeholders
- FIN 685 Module 4 Discussion: Futures, Options or Fixed-Price Contracts?
- MKT 660 Module 4 Discussion: Donor Motivation and the Psychology of Giving
QSO 690 Module 2 questions, answered
Where can I find a free QSO 690 Module 2 reshoring sample?
The complete QSO 690 Module 2 assignment is on this page: China, Mexico or in-house for an invented snowplow maker's hydraulic units.
What is total landed cost?
The full cost of a purchased part at the point of use, including price, freight, duties, inventory carrying, quality costs and the cost of supply problems.
How do reshoring and nearshoring differ?
Reshoring returns work to the company's own country; nearshoring sends it to a neighbor close enough for trucks, as Monterrey is to Minnesota.
Why does lead time matter in a location decision?
Long lead times force earlier ordering on worse forecasts, adding safety stock, shortages and leftovers that raise total cost.
Should a company move all production at once?
Not necessarily; a partial or staged move can hedge risk and allow the new source to prove itself before full commitment.