| Course | QSO 690 Topics in Operations Management |
|---|---|
| Module | Module 6 |
| Paper type | graduate assignment designing a closed-loop program that recovers used products for remanufacturing, covering acquisition of returns, grading, the remanufacturing process, pricing, cannibalization of new sales and environmental effects |
| Length | About 1,120 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 690 Module 6
From Scrap Pile to Certified Rebuilt: A Remanufacturing Program for Rimefield's Trade-In Plows
[Student Name]
Southern New Hampshire University
QSO 690: Topics in Operations Management
Closed-Loop Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
From Scrap Pile to Certified Rebuilt: A Remanufacturing Program for Rimefield's Trade-In Plows
Introduction
Rimefield's dealers take about 1,800 old plows a year in trade when towns and contractors buy new ones. Most of these plows are ten to twenty years old, and dealers sell most of them to a scrap yard for about $60 each, after removing anything that can be resold. Yet the heavy parts of a plow, the A-frame and the moldboard, often outlast the hydraulics, cutting edges and mounts that wear out first. Small towns and contractors who cannot afford a new plow buy used ones from each other, often in poor condition. This paper designs a program to recover trade-in plows and remanufacture them, prices the result and asks whether it makes money once lost new sales are counted.
Returns as a Supply
Closed-loop research has moved from a narrow focus on reverse logistics toward treating returns as a business process with its own economics, and it stresses that the quantity, timing and condition of returns are uncertain and must be managed (Guide & Van Wassenhove, 2009). Rimefield does not control its returns; its dealers do. The program offers dealers a core credit of $350 for each frame and moldboard that passes a simple grading checklist at the dealer: no cracks visible in the A-frame's pivot and mounting points, a moldboard not rusted through and a serial plate that identifies the model. Dealers already handle the trade-ins, and $350 beats $60 of scrap. Rimefield's trucks collect cores from dealers on their return trips after delivering new plows, which costs little.
Expected returns and grading
| Item | Units a year |
|---|---|
| Trade-in plows at dealers | about 1,800 |
| Passing dealer checklist | about 1,000 |
| Rejected at Rimefield after crack testing | about 100 |
| Remanufactured | about 900 |
The Remanufacturing Process
Cores arrive at a bay set up in the plant's former paint booth. Each is stripped of remaining hydraulics, lights and edges, sandblasted, inspected with dye penetrant at the pivot points and welds, repaired by rewelding or replacing worn wear strips, painted and fitted with new cutting edges, a new hydraulic package and the mount for the buyer's truck. The finished plow carries a two-year structural warranty, half the new-plow warranty.
Cost per remanufactured plow
| Item | Cost |
|---|---|
| Core credit to dealer | $350 |
| Collection and handling | $90 |
| Stripping, blasting and inspection | $280 |
| Repair welding and wear parts | $410 |
| Painting | $170 |
| New cutting edge, hydraulic package and mount | $1,600 |
| Warranty reserve and overhead | $150 |
| Total | $3,050 |
Pricing and Market
Rimefield's new plows average about $7,400. The remanufactured Certified Rebuilt plow will be priced at about $4,600, 62 percent of new, sold through the same dealers with a dealer margin built in. The target customers are small towns, townships and snow-removal contractors who now buy uncertified used plows or keep old ones running. Atasu et al. (2008) reviewed research on the economics of product reuse and warned that many models rest on assumptions, about consumer behavior and the value of returns, that need testing against practice. One such assumption is that remanufactured products serve only a separate market. Rimefield's dealers believe that about 30 percent of rebuilt buyers would otherwise have bought a new plow.
Net Profit After Cannibalization
At 900 units a year, the program earns about $1,550 per unit, or about $1.4 million a year before cannibalization. If 30 percent of those buyers, about 270, would otherwise have bought new plows at a margin of about $2,200, Rimefield loses about $594,000 of new-plow margin. The net gain is about $800,000 a year. The program remains profitable unless more than about 70 percent of rebuilt buyers would have bought new, which dealers consider very unlikely given the price gap. To limit cannibalization, rebuilt plows will be offered only in the most common sizes and will not be sold to state transportation departments, which replace on fixed schedules and would buy new.
Environmental Effects
Geissdoerfer et al. (2017) note that the circular economy and sustainability are often treated as the same thing, though they differ, and that circular practices such as keeping materials in use contribute to sustainability without guaranteeing it. Rimefield's program should be judged on its measured effects. Each remanufactured plow keeps about 700 pounds of steel in its A-frame and moldboard in use rather than sending it to be melted. At 900 plows, about 315 tons of steel a year stay in service. The program adds blasting and painting, which have their own emissions and must meet the plant's air permits; a net estimate of energy and emissions will be prepared with the state's pollution control agency guidance before launch.
Dealer Role and Incentives
Dealers make or break the program because they hold the cores and sell the rebuilt plows. Besides the core credit, dealers earn a margin on each Certified Rebuilt plow similar in dollars to what they earn on a used plow today, and they can offer a rebuilt unit to a customer who walks away from a new one on price, which keeps the sale in the dealership. Rimefield will publish each dealer's core returns and rebuilt sales quarterly so that dealers see the program as a source of business rather than a reporting chore. A short training video shows dealer staff how to apply the grading checklist in about ten minutes per plow, and dealers who send cores that fail Rimefield's crack test more than 15 percent of the time lose the full credit on failed units until their grading improves.
Pilot and Scale
The program will start in the coming spring with 12 dealers in Minnesota and Wisconsin, aiming for about 200 rebuilt plows in the first season. That volume tests grading accuracy, process costs and buyer demand before the remanufacturing bay is fully equipped. If costs come within 10 percent of the estimate and dealers sell at least 80 percent of the pilot units by December, the program will open to all dealers the following year.
Risks
Returns could fall short if dealers keep the best trade-ins to sell themselves, which the core credit is designed to discourage. Hidden cracks could cause warranty claims, which is why dye penetrant testing is required and the warranty is shorter. Cannibalization could be higher than dealers expect, so the program will survey buyers in its first year.
Conclusion
Rimefield's dealers scrap about 1,800 plows a year whose frames and moldboards still have years of life. A $350 core credit, a grading checklist, a remanufacturing bay and a Certified Rebuilt plow at 62 percent of the new price can turn about 900 of them into products for buyers who cannot afford new, earning about $800,000 a year after counting new sales lost to cannibalization and keeping about 315 tons of steel in use.
References
Atasu, A., Guide, V. D. R., Jr., & Van Wassenhove, L. N. (2008). Product reuse economics in closed-loop supply chain research. Production and Operations Management, 17(5), 483-496. https://doi.org/10.3401/poms.1080.0051
Geissdoerfer, M., Savaget, P., Bocken, N. M. P., & Hultink, E. J. (2017). The circular economy: A new sustainability paradigm? Journal of Cleaner Production, 143, 757-768. https://doi.org/10.1016/j.jclepro.2016.12.048
Guide, V. D. R., Jr., & Van Wassenhove, L. N. (2009). The evolution of closed-loop supply chain research. Operations Research, 57(1), 10-18. https://doi.org/10.1287/opre.1080.0628
What the QSO 690 Module 6 instructions ask for
The Module 6 assignment in QSO 690 typically asks students to analyze a closed-loop supply chain, reverse logistics or circular economy initiative for a company. Expect to describe how used products are collected, how their condition is assessed, what recovery options exist, such as reuse, remanufacturing, recycling or disposal, and how the program creates economic and environmental value. Strong papers treat returns as a supply that must be managed, with uncertain quantity and quality; set a recovery process with costs; price the remanufactured product with its market in mind; estimate how much it would take from sales of new products; and measure environmental effects rather than asserting them. They also consider the role of channel partners, such as dealers, who control the returns.
How this QSO 690 Module 6 closed-loop assignment example is built
The assignment designs a remanufacturing program at Rimefield Plow & Spreader, a fictional Minnesota snowplow maker whose dealers take about 1,800 old plows a year in trade and scrap most for about $60. A $350 core credit buys frames and moldboards that pass a grading check, about half of them. Sandblasting, crack testing, rewelding, painting and new edges, hydraulics and mounts cost about $3,050 per unit, sold as Certified Rebuilt at about $4,600, 62 percent of new, to small towns and contractors. About 30 percent of rebuilt buyers would otherwise buy new, and that cannibalization is netted out; steel and emissions saved are estimated. Guide and Van Wassenhove, Atasu and colleagues and Geissdoerfer and colleagues are cited.
Where the QSO 690 Module 6 rubric puts the points
The QSO 690 closed-loop rubric usually rewards a clear account of how returns are acquired, a grading method that sorts units by recovery option, a defined process with costs, pricing linked to market segment, an estimate of cannibalization and net profit, measured environmental effects, attention to channel partners and research on closed-loop supply chains and the circular economy. Papers stand out when the economics survive the cannibalization question. They lose points for assuming returns arrive free and in good condition, for ignoring dealers' incentives, for counting every remanufactured sale as new profit or for environmental claims with no numbers. Tables, APA references and clear writing complete the grade.
QSO 690 Module 6 help: the mistakes that cost points
Start with the returns: how many come back, where, in what condition and who controls them. Decide how you will get them, perhaps with a credit to whoever holds them, and how you will grade them into reuse, remanufacture, recycle or scrap. Lay out the recovery process and cost it per unit. Price the product for a customer who would not otherwise buy new, if one exists. Estimate how many buyers would have bought new anyway and subtract that lost margin. Estimate materials and emissions saved with stated assumptions. Papers often show a large margin on remanufactured units and stop; the real question is how much of it is new money rather than money moved from new sales.
Get QSO 690 Module 6 written to your instructions
Share the QSO 690 Module 6 instructions and your product and returns data. A writer designs how returns are acquired and graded, lays out the remanufacturing or recovery process, sets pricing, estimates cannibalization of new sales and the net profit, adds environmental effects and supports the design with closed-loop supply chain research. The opening QSO 690 paper costs you nothing; expect it within forty-eight hours in most weeks. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 690 papers and related MS Operations Management samples
- QSO 690 Module 1 Discussion: Which Topics Matter for a Seasonal Plant
- QSO 690 Module 2 Location Decision Assignment: Hydraulic Units From China, Mexico or Minnesota
- QSO 690 Module 3 Automation Assignment: A Robotic Welding Cell and the Welders
- QSO 690 Module 4 Discussion: Selling Spreader Data to Towns
- QSO 690 Module 5 Forecasting and Postponement Assignment: Last Winter's Snow and the Final Build
- QSO 690 Module 7 Discussion: Smart Spreaders and Salty Lakes
- QSO 690 Module 8 Maintenance Analytics Assignment: Predicting Laser Cutter Failures
- QSO 690 Module 9 Final Project: A Three-Year Operations Agenda
- QSO 690 Module 10 Discussion: Seasonal Workers in an Automated Plant
- OL 500 Module 4 Milestone Two: Motivation and Reward System Analysis
- MKT 635 Module 2 Website Usability Assignment: Website Usability and Design Evaluation
- FIN 700 Module 3 Milestone One: Three Years of Financial Performance
- ACC 690 Module 3 Milestone One: Is the Rail Terminal a Variable Interest Entity?
QSO 690 Module 6 questions, answered
Where can I find a free QSO 690 Module 6 closed-loop supply chain sample?
The complete QSO 690 Module 6 assignment is on this page: remanufacturing trade-in plows for an invented Minnesota manufacturer.
What is a closed-loop supply chain?
A supply chain that recovers used products from customers and returns them to value through reuse, remanufacturing or recycling.
What is remanufacturing?
Restoring used products to like-new condition by disassembly, inspection, repair and replacement of worn parts, usually with a warranty.
What is product cannibalization in remanufacturing?
When remanufactured products are bought by customers who would otherwise have bought new ones, reducing new product sales.
What is a core credit?
A payment or credit given for returning a used product, or core, that can be remanufactured.