FIN 685 Risk Management sample papers, module by module

Reviewed by Portia Lambrick, MBA

FIN 685 asks how a company should decide which risks to keep, which to reduce and how. The samples below follow one composite roaster through a full risk program: identifying exposures, measuring them in cash, choosing among futures, options, forwards, swaps, contracts and insurance, and writing the governance that keeps hedging from turning into speculation.

FIN 685 is SNHU’s Risk Management course. It centers on corporate risk management: why firms hedge, enterprise risk identification, measuring commodity, currency and interest rate exposure, futures, options and minimum-variance hedge ratios, forwards and swaps, counterparty and customer credit risk, operational and cyber risk with insurance, risk governance and hedge policy, and an integrated risk management plan. Every module below opens a full sample paper or takes a free request for one; searches like "fin 685 module 3", "FIN685 sample paper" and "FIN 685 milestone example" land on this page.

What FIN 685 is really about

FIN 685 is SNHU's graduate course in risk management, and the work that earns the most credit starts from the company's cash flows rather than from the instruments. It measures how much each risk could cost in a bad year, asks whether the company can pass the cost on to customers, hedges only what would otherwise threaten its plans or its lenders, and sets limits so that a hedging desk cannot quietly become a trading desk.

The samples follow one composite company: Calloway Coffee Roasters of Louisville, Kentucky, with about $210 million of sales to grocery private-label programs, foodservice distributors and a British café chain, green coffee purchases of about 22 million pounds a year from Colombia, Brazil and Central America, natural gas for its roasters and a $60 million term loan priced off SOFR. The company and its figures are illustrative.

What FIN 685’s modules ask for

Across ten modules, FIN 685 commonly asks for discussions on why firms hedge, choosing among hedging tools and credit risk, assignments on risk identification, commodity hedging and operational risk, three milestones on measuring exposures, a currency and rate hedging program and risk governance, and a final risk management plan in Module Ten.

Where students lose points in FIN 685

FIN 685 papers lose the most credit on hedges sized to volume instead of exposure: hedging every pound of coffee when grocery contracts already pass most price changes to customers, or ignoring the cash needed for futures margin when prices spike. Next come risk registers with colored heat maps and no dollar figures, and hedge policies with no limits on who may trade, how much and for how long.

The FIN 685 drawers

Module 1

FIN 685 Module 1 Discussion example

An opening post asking why Calloway Coffee Roasters, whose owners could diversify coffee risk on their own, should spend money hedging: the answer is not to beat the market but to keep a 50-cent jump in arabica from forcing the company to skip roaster upgrades or breach its loan covenants in the 90 days before grocery contracts reprice, drawing on Froot, Scharfstein and Stein, Smith and Stulz and Purnanandam, and asking classmates whether a company whose customers absorb most price changes needs to hedge at all. Full sample paper, read it free.

Read the sample →
Module 2

FIN 685 Module 2 Risk Identification Assignment example

Module Two builds Calloway Coffee Roasters's enterprise risk register with a dollar estimate beside every entry instead of a colored heat map: green coffee prices, the pound, natural gas and SOFR on the financial side; a grocery chain that buys about a third of output, Central American supplier failures and a fire or cyberattack that stops roasting on the operating side; food safety recalls and labor shortages on the strategic side; each scored by likelihood and the hit to a year's EBITDA, ranked, and assigned an owner and a response of avoid, reduce, transfer or accept, citing Beasley, Clune and Hermanson, Hoyt and Liebenberg, and Nance, Smith and Smithson. Full sample paper, read it free.

Read the sample →
Module 3

FIN 685 Module 3 Milestone One example

The first milestone, due in Module Three, measures Calloway Coffee Roasters's financial exposures in one-year cash terms: about 3 million pounds of grocery coffee unhedged during each 90-day repricing gap, a fixed-price British café contract that leaves 2.64 million pounds of coffee and about $25 million of sterling revenue exposed all year, 210,000 units of natural gas and a $60 million floating loan; combined, a 95 percent cash flow at risk near $7 million against only $4 million of headroom under the 3.0 times covenant on $24 million of EBITDA, which settles that hedging is needed and where, citing Bodnar, Hayt and Marston, Guay and Kothari, and Tufano. Full sample paper, read it free.

Read the sample →
Module 4

FIN 685 Module 4 Discussion example

A discussion post choosing how Calloway Coffee Roasters should cover its fixed-price British contract: buying arabica futures locks in cost but can demand millions of dollars of margin if prices spike, call options cap the cost for a premium of roughly 20 cents a pound, and fixing the green coffee price with its importer shifts the problem to a counterparty; the post recommends futures for most of the volume and calls for the rest, drawing on Culp and Miller on the margin calls that undid Metallgesellschaft, Carter, Rogers and Simkins on airline fuel hedging and Allayannis and Weston on what hedging is worth. Full sample paper, read it free.

Read the sample →
Module 5

FIN 685 Module 5 Commodity Hedging Assignment example

Module Five designs Calloway Coffee Roasters's rolling futures hedge for the grocery repricing gap: a minimum-variance hedge ratio near 0.97 from a 0.92 correlation between its landed coffee cost and arabica futures, about 77 contracts each quarter for 3 million pounds, roughly $0.9 million of initial margin and about $2.9 million of variation margin for each dollar the price climbs, hedge effectiveness near 85 percent with the rest left as basis risk from the premium over futures, a rule against adjusting the hedge on price views, citing Ederington, Adam and Fernando, and Brown, Crabb and Haushalter. Full sample paper, read it free.

Read the sample →
Module 6

FIN 685 Module 6 Milestone Two example

The second milestone, due in Module Six, hedges Calloway Coffee Roasters's two financial exposures besides coffee: about £19.8 million of yearly café revenue, covered with layered forwards on 80 percent of the next six months and half of the six after, about 65 percent of a year's receipts, which cuts the 95 percent currency loss from about $3.7 million to about $1.3 million; and the $60 million SOFR loan, where a four-year swap on $40 million fixes most of the interest near 5.85 percent all in, preferred over a cap after comparing cost and protection, with Géczy, Minton and Schrand, Allayannis, Ihrig and Weston, and Chernenko and Faulkender. Full sample paper, read it free.

Read the sample →
Module 7

FIN 685 Module 7 Discussion example

Module Seven's post turns to the risk that sits in Calloway Coffee Roasters's receivables and sales book rather than in any market price: one regional grocery chain takes about a third of its output and owes it about $9 million at any time, so the post weighs trade credit insurance, a shorter payment cycle and an early renewal against simply finding more customers, drawing on Patatoukas on what concentrated customer bases do to supplier profits, Banerjee, Dasgupta and Kim on how dependent suppliers finance themselves and Jacobson and von Schedvin on failures that pass from customer to supplier through unpaid bills. Full sample paper, read it free.

Read the sample →
Module 8

FIN 685 Module 8 Operational Risk Assignment example

Module Eight studies two events that would stop Calloway Coffee Roasters from shipping: a ransomware attack that freezes ordering and roaster controls for two weeks, about $2 million of lost EBITDA plus recovery costs, and a fire that takes both roasting lines down for two months, about $6 million before insurance; it sets prevention against transfer for each, reviewing property, business interruption with contingent and extra-expense cover, cyber insurance with its exclusions and a co-packing agreement as a non-insurance backstop, and prices the program at about $430,000 a year, citing Kamiya and colleagues, Mayers and Smith, and Garmaise and Moskowitz. Full sample paper, read it free.

Read the sample →
Module 9

FIN 685 Module 9 Milestone Three example

The third milestone, due in Module Nine, writes the policy that governs Calloway Coffee Roasters's risk program: a board-stated appetite that a 95 percent bad year must leave EBITDA above the covenant level, hedge ranges for each exposure, from 80 to 100 percent of the grocery repricing gap to 50 to 80 percent of the pound revenue a year out, a list of permitted instruments and banned ones, counterparty limits, separation of trading, confirmation and accounting, weekly and quarterly reporting, and a rule that no hedge may be resized on a price view, citing Géczy, Minton and Schrand, Ellul and Yerramilli, and Brown, Crabb and Haushalter. Full sample paper, read it free.

Read the sample →
Module 10

FIN 685 Module 10 Final Project example

The capstone plan for Calloway Coffee Roasters, finished in Module Ten, tells its board what the program does and costs: a risk register in dollars, about 77 futures a quarter on the grocery gap and a futures-and-calls hedge on the British contract, layered pound forwards, a swap on $40 million of the loan, a $4 million margin line, stronger cyber and fire controls with better insurance and a standby co-packer, and a written policy; together they cut 95 percent cash flow at risk from about $7 million to about $3 million, inside covenant headroom, for roughly $1 million a year all in, citing Stulz, Froot, Scharfstein and Stein, and Hoyt and Liebenberg. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a FIN 685 sample the right way

Read a FIN 685 sample by asking, for each hedge, which cash flow it protects and what the company would do without it. For FIN 685, send your case and rubric; your first custom sample is free and usually takes about two days.

FIN 685 questions, answered

What does FIN 685 cover?

Corporate risk management: reasons to hedge, risk identification, exposure measurement, futures, options, forwards and swaps, credit and operational risk, insurance, governance and hedge policy.

What is the FIN 685 final project?

One combined risk plan that draws on three milestones: exposure measurement, the currency and rate hedges, and the governing policy.

Is the roaster in the FIN 685 samples real?

No. Calloway Coffee Roasters is an invented teaching case, with exposures sized so the same risks run through every module.