FIN 685 Module 6 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This FIN 685 Module 6 Milestone Two sample designs hedges for a company's currency and interest rate exposures and compares the instruments available for each. SNHU FIN 685 (FIN-685) assigns this second milestone in Module Six of its MS Finance course on risk management. For the composite Calloway Coffee Roasters, the paper hedges pound sterling revenue from a British café chain with a layered program of forward contracts and fixes most of the rate on its floating-rate term loan, comparing an interest rate swap with a cap. It measures the risk left after each hedge and explains why some exposure is deliberately kept.

CourseFIN 685 Risk Management
ModuleModule 6
Paper typegraduate milestone designing currency and interest rate hedges
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 685 Module 6

1

Hedging the Pound and the Loan Rate at Calloway

[Student Name]

Southern New Hampshire University

FIN 685: Risk Management

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingCalloway is an invented teaching case; exchange rates, swap rates and option prices are planning assumptions.
2

Hedging the Pound and the Loan Rate at Calloway

Introduction

The exposure measurement put Calloway's British pound revenue as its largest risk after coffee, with a 95 percent adverse effect of about $3.7 million, followed by the floating rate on its $60 million term loan. This milestone designs hedges for both and measures what remains.

What this page is doingBeyond coffee.
3

The Currency Exposure

The café chain pays about £1.65 million a month, about £19.8 million a year, under a contract that runs for twelve months and has been renewed for four years. Payments for the next six months are highly certain; those further out depend on renewal and the chain's volume. Calloway's costs are almost entirely in dollars, so there is no natural offset in its expenses; even the green coffee it buys from Latin America is invoiced in dollars.

What this page is doingTiming and certainty.
4

The Currency Hedge

Forward contracts with Calloway's bank will fix the dollar value of pound receipts. The program covers 80 percent of each of the next six months' expected receipts and 50 percent of the following six, about £12.9 million, or 65 percent of a year's revenue. Each quarter, the program rolls forward: new forwards are added for the newest months and the cover on months moving into the nearer window is raised to 80 percent.

Layering does two things. It hedges more of what is certain and less of what may change, so a smaller order from the café chain will not leave Calloway over-hedged. It also spreads the rates locked in over time, averaging them across many dates, so the company does not fix a year of revenue at a single, possibly unfavorable, moment. Forward rates reflect the interest rate difference between the dollar and the pound; with the two countries' short rates assumed to be similar, forward rates are close to spot, and the hedge costs little beyond the bank's spread.

With 65 percent of the year hedged, the unhedged pound revenue is about £6.9 million, and the 95 percent adverse effect falls from about $3.7 million to about $1.3 million.

Options were considered and rejected for the core program, for reasons of cost rather than principle. Buying pound put options would protect against a fall while keeping upside, but premiums on a year of cover would cost perhaps 2 to 3 percent of the amount hedged, about $500,000. They could be added in years when the pound is unusually volatile. Firms with larger foreign currency exposure and better access to financial markets have been found more likely to use currency derivatives (Géczy et al., 1997), and Allayannis et al. (2001) found that financial hedges, not operational changes alone, were associated with higher firm value for multinationals.

What this page is doingLayered forwards.
5

The Interest Rate Exposure

The term loan carries interest at SOFR plus 2.25 percent, about 6 percent today. A rise of one percentage point would add $600,000 a year of interest and reduce covenant headroom. A fall would help, though the company's margin line and cash would then earn less, a small offset.

What this page is doingThe floating loan.
6

Swap or Cap

Interest rate hedge alternatives on $40 million for four years

FeaturePay-fixed swapInterest rate cap at 5% SOFR
Up-front costNoneAbout $400,000
Rate on hedged portionAbout 3.6% fixed plus 2.25% margin, about 5.85%SOFR plus 2.25%, capped at 7.25%
If rates fallPays fixed, no benefitBenefits fully
If rates rise 2 pointsFully protectedProtected above the 5% strike
Exit costMarket value, positive or negativeNone beyond premium paid

A swap on $40 million fixes about two-thirds of the loan at about 5.85 percent all in. A cap protects against large rises but leaves the company exposed to rises up to the strike and costs a premium. Chernenko and Faulkender (2011) found that firms' use of interest rate swaps reflects both hedging and attempts to time rates, often tied to managers' incentives. Calloway's choice is driven by its covenant: the swap gives certainty that interest costs will not erode headroom, which matters more to the company than the chance of benefiting from falling rates.

The remaining $20 million stays floating, and the term loan's scheduled amortization of about $6 million a year means the floating share shrinks as the swap continues. Calloway typically holds some cash and its margin line in floating-rate instruments, so a modest floating exposure partly offsets itself. The swap will be documented for hedge accounting so that its value changes pass through other comprehensive income rather than earnings, and it will be executed with the lending bank, under the loan's collateral, avoiding separate collateral posting.

What this page is doingTwo ways to cover the loan.
7

Counterparty and Operational Matters

The forwards and the swap are over-the-counter contracts with Calloway's lending bank, so the bank's own credit becomes a risk. The bank is rated in the single-A range, and the contracts are documented under a standard master agreement that nets all positions if either side defaults. Using the lending bank lets the hedges share the loan's collateral, so Calloway does not post cash when they move against it, which protects liquidity. The treasurer will confirm each trade the day it is made, the controller will reconcile positions monthly with the bank's statements, and no single employee may both agree a trade and record it. If the café contract is not renewed, the forwards beyond its end would be closed at their market value, a cost the layering keeps small because only half of the later months are hedged.

What this page is doingMaking the program work.
8

Effect on Total Risk

With the coffee hedges from Module Five on the grocery gap and on two-thirds of the British contract volume, the currency program and the swap, Calloway's combined 95 percent cash flow at risk falls from about $7.1 million to roughly $3 million, inside the covenant headroom of about $4 million.

What this page is doingUpdated cash flow at risk.
9

Conclusion

Layered forwards hedge about 65 percent of a year's pound revenue, more in the near months, cutting the currency risk by about two-thirds. A four-year swap fixes two-thirds of the floating-rate loan near 5.85 percent. Together with the coffee hedges, the program brings Calloway's cash flow at risk within its covenant headroom while leaving deliberate, measured exposures in place.

What this page is doingThe program in brief.
10

References

Allayannis, G., Ihrig, J., & Weston, J. P. (2001). Exchange-rate hedging: Financial versus operational strategies. American Economic Review, 91(2), 391-395. https://doi.org/10.1257/aer.91.2.391

Chernenko, S., & Faulkender, M. (2011). The two sides of derivatives usage: Hedging and speculating with interest rate swaps. Journal of Financial and Quantitative Analysis, 46(6), 1727-1754. https://doi.org/10.1017/S0022109011000391

Géczy, C., Minton, B. A., & Schrand, C. (1997). Why firms use currency derivatives. The Journal of Finance, 52(4), 1323-1354. https://doi.org/10.1111/j.1540-6261.1997.tb01112.x

What the FIN 685 Module 6 instructions ask for

Milestone Two in FIN 685 usually asks you to design hedges for currency and interest rate risk. Expect to identify foreign currency cash flows and their timing, choose among forwards, futures, options and natural hedges, decide how much and how far ahead to hedge, and for interest rate risk compare swaps, caps and fixed-rate refinancing. Many versions ask you to show the effect of the hedges on the company's risk measures. A strong milestone sizes each hedge to forecast cash flows rather than to totals, explains layering and tenor, compares the cost and protection of alternatives, addresses counterparty and accounting considerations and shows the remaining exposure.

How this FIN 685 Module 6 milestone two example is built

The sample hedges the British café chain's payments of about £1.65 million a month. Forward contracts cover 80 percent of the next six months and 50 percent of the following six, about £12.9 million or 65 percent of a year's receipts, rolled forward each quarter. That lowers the 95 percent currency loss from about $3.7 million to about $1.3 million. For the $60 million term loan priced at SOFR plus 2.25 percent, the paper compares a four-year pay-fixed swap on $40 million at about 3.6 percent, fixing that portion near 5.85 percent all in, with a cap at 5 percent SOFR costing about $400,000 up front. It chooses the swap for certainty of covenant compliance, leaving $20 million floating as a partial natural offset to Calloway's cash.

Where the FIN 685 Module 6 rubric puts the points

The milestone rubric generally scores the identification and timing of currency and rate exposures, the choice and sizing of instruments, the comparison of alternatives on cost and protection, the measurement of residual risk, the treatment of counterparty, collateral and accounting issues and integration with Milestone One. Strong submissions hedge forecast flows in layers, explain why not to hedge everything, put the swap and cap side by side with numbers and show the effect on cash flow at risk and covenant headroom. Points come off for hedging the full annual amount far in advance without regard to forecast uncertainty, for ignoring option premiums or swap termination values, and for not stating what remains unhedged.

FIN 685 Module 6 help: the mistakes that cost points

Hedge forecast cash flows in layers, not a single block: the nearer a payment, the more certain it is and the more of it can be hedged. That approach also smooths the rates the company locks in. Show the effect of the program on the risk measure from Milestone One. For the loan, compare a swap, which fixes the rate and costs nothing up front but can carry a termination cost, with a cap, which costs a premium but keeps the benefit if rates fall. Decide by what matters most to the company, often covenant certainty. Address the bank's credit terms for the hedges and whether hedge accounting applies. Finally, state clearly what you chose not to hedge and why.

Get FIN 685 Module 6 written to your instructions

Send the FIN 685 Milestone Two guidelines with the currency flows and debt terms in your case. We layer forward cover over the next year, compare a swap with a cap on the loan and measure what risk remains after each step. Expect it in about two days; first milestones are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 685 papers and related MS Finance samples

FIN 685 Module 6 questions, answered

Where can I find a free FIN 685 Module 6 Milestone Two sample?

The complete FIN 685 Module 6 milestone is posted here, with layered forwards on pound revenue and a swap on two-thirds of a floating-rate loan.

What is a layered currency hedging program?

Hedging a larger share of near-term foreign currency flows and a smaller share of later flows, adding cover each period as forecasts firm up.

What is the difference between an interest rate swap and a cap?

A swap exchanges floating for fixed payments and locks in the rate; a cap is an option that pays when rates exceed a strike, protecting against rises for an up-front premium while keeping the benefit of declines.

Why not hedge all foreign currency revenue?

Because forecast flows may not materialize, over-hedging creates its own exposure, and some currency risk may be offset naturally by costs or reflected in pricing.

How is a currency forward rate set?

By the spot rate adjusted for the interest rate difference between the two currencies over the contract's term.