| Course | QSO 560 Descriptive Business Analytics |
|---|---|
| Module | Module 2 |
| Paper type | graduate assignment sourcing, reshaping and reconciling business data from several systems into tidy tables, with every transformation documented and checked |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 560 Module 2
Twelve Hundred Group Blocks and a Missing Cancellation File: Wrangling Ashgrove's Bookings
[Student Name]
Southern New Hampshire University
QSO 560: Descriptive Business Analytics
Data Wrangling Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Twelve Hundred Group Blocks and a Missing Cancellation File: Wrangling Ashgrove's Bookings
Introduction
Ashgrove Hotel Group wants to understand why revenue per available room fell last year while occupancy rose. Answering that requires a year of bookings in one consistent form: who booked, through which channel, how far ahead, at what rate, for how many nights and whether they canceled. That record does not exist. The seven hotels Ashgrove has owned since before 2019 use one property management system, the four it acquired in 2024 use another, and online bookings also pass through a channel manager that connects the hotels to travel websites. This assignment documents how the three sources were reconciled into tables fit for description.
The Sources
Data sources for stays in the last year
| Source | Hotels | One record is | Records |
|---|---|---|---|
| Original property system | 7 | One room reservation, including canceled ones | 158,300 |
| Acquired property system | 4 | One reservation, or one master record for a group block | 61,900 |
| Channel manager | 11 | One booking, change or cancellation message from a travel website | 312,000 |
Kandel et al. (2012), interviewing analysts in many companies, found that finding, understanding and reshaping data took a large share of their time, and that the hardest part was often discovering what a field actually meant in the source system. That was true here: the two property systems use similar field names for different things.
Conflict One: Missing Cancellations
The original system keeps canceled reservations with a status code. The acquired system deletes canceled reservations after 30 days unless a deposit was taken. As a result, the acquired hotels appear to have a cancellation rate of about 6 percent, against about 23 percent at the original hotels, a difference that would make the acquired hotels look far better at holding bookings. The channel manager keeps every cancellation message from travel websites. Matching those messages to the acquired hotels recovered about 4,900 canceled online bookings. Cancellations of direct and phone bookings at the acquired hotels cannot be recovered, so their cancellation rates are reported as a lower bound, and the acquired hotels' system has been set to keep canceled records from now on.
Conflict Two: Group Blocks
The original system creates one reservation for each room in a group, such as a wedding or a sports team. The acquired system stores a group as one master record with a room count and a single rate. Left as they were, the acquired hotels' 1,240 group master records would count as 1,240 bookings instead of about 9,800 room reservations, and group business would look far smaller there than it is. Each master record was expanded into one reservation per room, carrying the group's rate, dates and contract code. Rooms released from a block before arrival, recorded as a reduced room count, were treated as cancellations.
Conflict Three: Rate Codes
The original system has 212 rate codes and the acquired system 147, many created by individual hotels for one promotion and never retired. The 359 codes were mapped by hand into nine rate groups: best available, advance purchase, member, package, government, corporate negotiated, group, wholesale and complimentary. About 4 percent of room nights carried codes whose meaning no one could confirm; they were placed in an unknown group and listed for the revenue managers to review. The mapping table is stored with the data so that it can be updated as codes change.
Conflict Four: Guests
Both systems create a new guest profile whenever a front desk agent cannot find an existing one. Profiles were matched when they shared an email address, or a phone number and last name, and about 31 percent of profiles turned out to be duplicates. Matches based only on name and city were not merged, because common names produced false matches in a test of 200 pairs. After merging, about 96,000 distinct guests remain.
Reshaping into Tidy Tables
Wickham (2014) argues that analysis goes faster and breaks less often when every measured attribute gets its own column, every case gets its own row and different kinds of cases live in separate tables. The rebuilt data use three tables. The reservations table has one row per room reservation, about 236,400 rows, including cancellations, with booking date, arrival date, nights, channel, rate group, hotel, guest and status. The stay nights table has one row per room per night actually stayed, about 426,000 rows, with the rate charged that night, so that rate and occupancy can be summarized by date. The guests table has one row per distinct guest. Kandel et al. (2011) describe how wrangling tools record each transformation as a step that can be reviewed and rerun; here every rule is written as a script step with the count of records it changed, so the whole rebuild can be repeated each month.
Reconciliation
Rebuilt data compared with the company's monthly reports
| Measure | Monthly reports | Rebuilt data | Difference |
|---|---|---|---|
| Occupancy | 71.2% | 71.1% | 0.1 point |
| Average daily rate | $163.00 | $163.40 | 0.2% |
| Revenue per available room | $116.06 | $116.17 | 0.1% |
| Room revenue | $69.47 million | $69.53 million | 0.1% |
The small differences come from late room moves and rate adjustments posted after the monthly reports closed. Every figure falls within 0.3 percent of the reported totals, so the tables can be trusted for the analysis that follows, and the same comparison will be rerun each month as a standing check.
Remaining Limits
Cancellations of direct and phone bookings at the four acquired hotels are missing for most of the year. About 4 percent of room nights sit in an unknown rate group. Guest matching is conservative, so some repeat guests still appear as two people. These limits are recorded in the data dictionary, along with the date and record count of every rule applied, and the revenue team has agreed to review the unknown rate codes each quarter.
Conclusion
Three sources that disagreed about cancellations, group bookings, rates and guests have been reconciled into tidy tables of reservations, stay nights and guests. The rules are documented with their record counts, the results match the company's reports within 0.3 percent, and the gaps that remain are known. Ashgrove can now describe its year one booking at a time.
References
Kandel, S., Paepcke, A., Hellerstein, J., & Heer, J. (2011). Wrangler. In Proceedings of the SIGCHI Conference on Human Factors in Computing Systems (pp. 3363-3372). ACM. https://doi.org/10.1145/1978942.1979444
Kandel, S., Paepcke, A., Hellerstein, J. M., & Heer, J. (2012). Enterprise data analysis and visualization: An interview study. IEEE Transactions on Visualization and Computer Graphics, 18(12), 2917-2926. https://doi.org/10.1109/TVCG.2012.219
Wickham, H. (2014). Tidy data. Journal of Statistical Software, 59(10), 1-23. https://doi.org/10.18637/jss.v059.i10
What the QSO 560 Module 2 instructions ask for
The QSO 560 Module 2 assignment usually asks students to gather data from more than one source and prepare it for descriptive analysis. Expect to identify the sources and what each record represents, find inconsistencies in definitions, codes and formats, clean and transform fields, reshape data into a structure suited to analysis, combine sources with appropriate keys, handle duplicates and missing values and document the process. Strong assignments explain the business meaning of each conflict before fixing it, state every rule with the number of records it changed, design tables in which each row is one clearly defined unit, reconcile the results with figures managers already trust and note which limitations remain.
How this QSO 560 Module 2 data wrangling assignment example is built
The assignment rebuilds a year of bookings at Ashgrove Hotel Group, a fictional company with 11 hotels, from two property management systems and a channel manager. The seven original hotels run one system; the four acquired in 2024 run another that deletes most canceled bookings after 30 days, stores each group block as one record and uses 147 rate codes against the first system's 212. The paper recovers about 4,900 canceled online bookings from the channel manager, expands 1,240 group records into 9,800 room reservations, maps 359 rate codes into nine groups and merges duplicate guest profiles. The rebuilt tables reproduce reported occupancy, rate and RevPAR within 0.3 percent. Wickham and Kandel and colleagues inform the work.
Where the QSO 560 Module 2 rubric puts the points
Graders of the QSO 560 wrangling assignment look for sources described by what one record means, conflicts explained in business terms, transformation rules that are explicit and justified, counts of the records each rule changed, tidy output tables with a clear unit per row, careful merging and duplicate handling, reconciliation with trusted totals and documentation another analyst could follow. The strongest papers show a conflict that would have changed a business conclusion if left alone. Credit drops when sources are stacked without reconciling codes, records disappear without explanation, tables mix units, duplicates are ignored or the result is never checked against known figures. Tables, clear writing and APA citations complete the grade.
QSO 560 Module 2 help: the mistakes that cost points
List every source and write one sentence on what a single record in it represents; many errors come from assuming two systems mean the same thing by a booking or a customer. Compare the codes and formats each uses for the same idea and decide on one standard. Write each transformation as a rule, apply it and record how many records it changed. Reshape the data so that each table has one kind of unit per row, such as one reservation or one night, with one value per cell. Join sources on keys you have checked, and merge duplicates with a stated matching rule. Finally, recompute a number managers already know, such as monthly revenue, and explain any gap. Wrangling papers go wrong when the steps are invisible, so a reader cannot tell what was changed or why.
Get QSO 560 Module 2 written to your instructions
Send the QSO 560 Module 2 brief and list the systems your records come from. A writer works out what one row means in each, finds where their definitions and codes clash, writes and justifies transformation rules, reshapes the data into tidy tables, merges duplicates, documents every step with record counts and checks the result against known totals, citing research on data preparation. Your first QSO 560 paper is free, with delivery in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 560 papers and related MS Operations Management samples
- QSO 560 Module 1 Discussion: The Measures That Matter
- QSO 560 Module 3 Descriptive Statistics Assignment: Lead Times and Rates by Channel
- QSO 560 Module 4 Discussion: An Average That Fell Because the Mix Changed
- QSO 560 Module 5 Visualization Assignment: Cancellations and Seasons on One Page
- QSO 560 Module 6 Dashboard Assignment: A Morning Screen for General Managers
- QSO 560 Module 7 Discussion: Telling the Owners What Happened
- QSO 560 Module 8 Segmentation Assignment: Guests Grouped by How They Book and Stay
- QSO 560 Module 9 Final Project: The Descriptive Analytics Report
- QSO 560 Module 10 Discussion: When a Measure Becomes a Target
- FIN 550 Module 6 Milestone Two: WACC, Scenarios and the Investment Decision
- QSO 640 Module 5 Schedule Assignment: The Network and Its Critical Path
- QSO 530 Module 3 Discussion: Why Checkout Waits Are Not Normal
- ACC 690 Module 5 Interim Reporting Assignment: A Second Quarter Shaped by the Corn Cycle
QSO 560 Module 2 questions, answered
Where can I find a free QSO 560 Module 2 Data Wrangling Assignment sample?
The complete QSO 560 Module 2 assignment is on this page: reconciling two reservation systems at an invented hotel company into tidy tables.
What is data wrangling?
The work of gathering, cleaning, reshaping and combining raw data from different sources into a consistent form ready for analysis.
What is tidy data?
A layout in which each variable has its own column, each observation its own row and each type of observational unit its own table.
Why reconcile prepared data with existing reports?
Because matching a known total confirms that the transformations kept every record they should, and a gap points to a rule that needs attention.
How should duplicate customer records be handled?
With a stated matching rule, such as the same email or phone and name, a record of how many were merged and a check of borderline matches.