| Course | HRM 200 Human Resource Functions |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment on training, onboarding and performance management |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Human Resource Management |
| Updated | October 2026 |
Free sample paper for HRM 200 Module 6
Onboarding, Training and Performance Management at Kettle Creek Brewing Company
[Student Name]
Southern New Hampshire University
HRM 200: Human Resource Functions
Training and Performance Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Onboarding, Training and Performance Management at Kettle Creek Brewing Company
Introduction
Kettle Creek will bring in about 105 new hires over eighteen months, more than its current headcount. Today, training is informal and varies by supervisor, safety instruction is a walk-through on the first day and performance reviews happen once a year, when the founder has time. This paper designs onboarding, job safety training and a performance management process, each tied to problems the company already faces: early turnover in the taproom, a growing number of people working around brewing hazards and managers with no shared way to give feedback.
Needs Assessment
Three sources point to training needs. The job analysis for the canning line technician rated cleaning with caustic and acid solutions and line operation among the most important tasks. Incident logs from the past two years show eleven minor injuries, mostly chemical splashes, cuts and strains, and one near miss in which a cellar worker felt dizzy after entering a tank area without checking carbon dioxide levels. Exit conversations with taproom staff who left in their first three months often mention not knowing what was expected and being put on busy shifts alone.
Onboarding
Bauer et al. (2007) pooled studies of how new employees settle in and identified three adjustment signals, role clarity, confidence in doing the job and social acceptance that each predicted performance, satisfaction and intention to stay. The onboarding plan targets all three. Before the first day, each new hire receives a schedule for the first two weeks and the name of a buddy, an experienced employee in the same job who is paid a small stipend. The first day covers the company's story, policies, paperwork and a guided tour of the hazards. Taproom hires shadow for three shifts before serving alone and never start on a Friday or Saturday; packaging hires train alongside the equipment installer. Managers hold check-ins at thirty and sixty days using a short guide: what is going well, what is unclear and what support is needed.
Safety Training
Safety training by hazard
| Hazard | Standard | Who | Method |
|---|---|---|---|
| Carbon dioxide in tanks, cellars and confined spaces | OSHA permit-required confined spaces standard | Brewing and cellar staff | Classroom, gas monitor practice, supervised entry drill |
| Caustic and acid cleaning chemicals | OSHA hazard communication standard | Brewing and packaging | Labels and safety data sheets, protective equipment fitting, splash response drill |
| Machine energy during cleaning and repair | OSHA lockout and tagout standard | Packaging and maintenance | Demonstration on the canning line, individual sign-off |
| Forklifts | OSHA powered industrial trucks standard | Warehouse and packaging | Formal instruction, practical training and evaluation before driving |
| Alcohol service | Recognized responsible service course | Taproom staff and managers | Certified course before first solo shift |
Each course combines a short explanation with hands-on practice, and no one works alone with a hazard until a lead has watched them do the task correctly and signed off. Refresher training runs yearly and after any incident. Across the studies Blume et al. (2010) combined, practice, the trainee's motivation and support in the work environment were among the strongest predictors of whether training was used on the job; for that reason, leads are expected to coach the same procedures on the floor, not just in the classroom.
Evaluating Training
Evaluation runs on four levels. Reactions: each course ends with a brief survey. Learning: a written quiz and a practical demonstration for each safety course. Behavior: leads will observe each new hire performing chemical handling and lockout procedures at thirty days, using a checklist. Results: the company will track recordable injuries, near misses reported, product quality holds and ninety-day retention, comparing the year after the program with the two years before. The goal is to halve recordable injuries and raise ninety-day taproom retention from about 65 to 80 percent.
Performance Management
Today, each employee receives a single annual review from the founder, often months late, with a general rating from one to five and few specifics. Kluger and DeNisi (1996) reviewed hundreds of studies: feedback lifted performance on the whole, yet roughly one result in three showed performance falling after feedback, especially when it focused attention on the person rather than the task. The new process changes three things. First, managers hold short quarterly conversations with each employee, covering what went well, what to improve and one development goal. Second, ratings use behavior-based scales for each job family; for a canning line technician, for example, a top rating on quality means catching and recording seam faults before cases leave the line, while a low rating means faults found later by the lead. Third, the first ninety days are reviewed separately, so new hires get early, specific feedback. Pay decisions will happen once a year using the four quarterly records, so development conversations are not overshadowed by money.
Legal and Fairness Checks
Performance records affect pay, promotion and sometimes discipline, so they must be consistent and free of bias. Behavior-based scales help, because they ask managers to rate what people did rather than general traits such as attitude. HR will compare rating patterns across managers and across groups protected by federal and Michigan law each year, looking for unexplained differences, and will review any rating that leads to discipline before it is final. Employees can add written comments to their records and ask for a second conversation with the next level of management. Accommodations for employees with disabilities, such as modified duties during recovery from an injury, will be noted so that performance is judged against the job as adjusted.
Manager Preparation
None of this works without managers who can coach. Every lead and manager will complete a half-day workshop on giving task-focused feedback, using the rating scales and holding check-ins, and HR will review a sample of quarterly records each quarter for completeness and consistency. Managers who fall behind on check-ins will hear about it from the founder, since the process loses credibility the first time a review is skipped.
Conclusion
The plan gives Kettle Creek onboarding that targets early turnover, safety training built around its actual hazards and the federal standards that apply, an evaluation plan that measures results on the floor and a performance process based on frequent, specific feedback.
References
Bauer, T. N., Bodner, T., Erdogan, B., Truxillo, D. M., & Tucker, J. S. (2007). Newcomer adjustment during organizational socialization: A meta-analytic review of antecedents, outcomes, and methods. Journal of Applied Psychology, 92(3), 707-721. https://doi.org/10.1037/0021-9010.92.3.707
Blume, B. D., Ford, J. K., Baldwin, T. T., & Huang, J. L. (2010). Transfer of training: A meta-analytic review. Journal of Management, 36(4), 1065-1105. https://doi.org/10.1177/0149206309352880
Kluger, A. N., & DeNisi, A. (1996). The effects of feedback interventions on performance: A historical review, a meta-analysis, and a preliminary feedback intervention theory. Psychological Bulletin, 119(2), 254-284. https://doi.org/10.1037/0033-2909.119.2.254
What the HRM 200 Module 6 instructions ask for
The training and performance assignment in HRM 200 usually asks you to design or evaluate how an organization brings in, develops and evaluates its people. Expect to describe a needs assessment, an onboarding or training program with methods and content, a plan for evaluating training and a performance management process with appraisal methods and feedback. Many versions ask about legal requirements such as safety training. A strong paper ties training to specific job tasks and risks, uses methods that help learning transfer to the job, measures results beyond whether trainees liked the session and designs performance reviews that are frequent, based on observable behavior and linked to development.
How this HRM 200 Module 6 training and performance assignment example is built
The sample designs three systems for Kettle Creek. Onboarding gives every new hire a buddy for two weeks, a schedule posted in advance and check-ins at thirty and sixty days. Safety training follows the brewery's real hazards: carbon dioxide that collects in tanks and cellars, caustic and acid cleaners, equipment lockout and forklifts, each under its OSHA standard, with hands-on practice and sign-off by a lead. Training is evaluated at four levels, from trainee reactions and quizzes through observed behavior on the floor to injury and quality rates. The founder's once-a-year review gives way to quarterly conversations using behavior-based rating scales for each job family, with the first ninety days reviewed separately.
Where the HRM 200 Module 6 rubric puts the points
The rubric commonly scores the needs assessment, the design of onboarding and training, the attention to legal and safety requirements, the evaluation plan, the performance management design and the use of research. Strong papers link training content to tasks and hazards identified in job analysis and incident records, choose methods suited to the work, evaluate results at more than one level and design appraisal around observable behavior with regular feedback. Points are lost for training described only as an orientation video, for evaluation that stops at satisfaction surveys, for omitting required safety training and for performance systems that rely on a single annual rating.
HRM 200 Module 6 help: the mistakes that cost points
Start from what people need to learn, drawn from the job analysis and from problems the employer already has, such as early turnover or injuries. For onboarding, focus on the first weeks, when people decide whether to stay: clear expectations, a person to ask and early feedback. For safety, name the hazards and the standards that apply, and train with practice, not just slides. Plan evaluation before the training starts, at the levels of reaction, learning, behavior on the job and results. For performance management, use behavior-based scales and frequent conversations, and separate development discussions from pay decisions where possible. Finally, prepare the managers who will run the system, since a good form in untrained hands produces the same vague ratings as before.
Get HRM 200 Module 6 written to your instructions
Upload the HRM 200 Module 6 instructions and the roles you need to train and evaluate. We design onboarding, job-specific training with a plan to measure it and a performance process managers will actually use. About two days; the first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More HRM 200 papers and related BS Human Resource Management samples
- HRM 200 Module 1 Discussion: More Than Payroll and Paperwork
- HRM 200 Module 2 Job Analysis Assignment: Defining the Canning Line Technician's Job
- HRM 200 Module 3 Milestone One: Hiring Fifty-Five People in Eighteen Months
- HRM 200 Module 4 Discussion: Should the Brewery Post Its Pay Ranges?
- HRM 200 Module 5 Milestone Two: Pay Ranges and a Benefits Package
- HRM 200 Module 7 Final Project: An HR Plan for the Next Eighteen Months
- HRM 200 Module 8 Discussion: What Should a Growing Brewery Outsource?
- ACC 345 Module 8 Discussion: Discounts on a Minority Gift
- FIN 320 Module 1 Financial Manager Discussion: New stores or a share buyback
- FIN 250 Module 8 Discussion: What Will Make the Plan Stick
- ACC 405 Module 2 Business Combination Assignment: Buying 80 Percent of a Vermont Sugarhouse
HRM 200 Module 6 questions, answered
Where can I find a free HRM 200 Module 6 Training and Performance Assignment sample?
The full HRM 200 Module 6 assignment is on this page, with onboarding, brewery safety training and quarterly performance reviews.
What makes onboarding effective?
Research links good onboarding to role clarity, confidence in doing the job and social acceptance, which in turn predict performance, satisfaction and retention.
How do you evaluate a training program?
Measure trainees' reactions, what they learned, whether their behavior on the job changed and whether results such as quality or injury rates improved.
What is training transfer?
The extent to which what people learn in training is used on the job, which depends on practice, the work environment and support from supervisors.
Why replace annual reviews with more frequent check-ins?
Frequent, specific feedback helps people correct course sooner, while a single yearly rating often comes too late and focuses on the past.