HRM 200 Module 2 Job Analysis Assignment Example

Reviewed by Portia Lambrick, MBA

This HRM 200 Module 2 Job Analysis Assignment sample shows how to analyze a job and turn the results into a job description. SNHU HRM 200 (HRM-200) assigns this work in Module Two of its BS Human Resource Management course on HR functions. For a new canning line technician role at the composite Kettle Creek Brewing Company, the paper explains the methods used to gather information, lists the tasks and how they were rated, separates essential from marginal functions for disability law purposes, sets out the knowledge, skills and abilities required and the working conditions, classifies the job for overtime and presents the finished job description.

CourseHRM 200 Human Resource Functions
ModuleModule 2
Paper typeundergraduate assignment on job analysis and job descriptions
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 200 Module 2

1

Job Analysis and Job Description: Canning Line Technician, Kettle Creek Brewing Company

[Student Name]

Southern New Hampshire University

HRM 200: Human Resource Functions

Job Analysis Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingKettle Creek Brewing and the role are an invented teaching case; job details reflect typical small brewery packaging work.
2

Job Analysis and Job Description: Canning Line Technician, Kettle Creek Brewing Company

Introduction

Kettle Creek Brewing's new canning line will need about twelve technicians across two shifts. Recruiting, pay and training all depend on a clear picture of the work itself and the abilities it calls for. This paper describes the job analysis carried out for the canning line technician, presents the results and ends with the job description. Sanchez and Levine (2012) describe job analysis as the base on which selection, training and pay decisions rest, and argue it should capture how work is actually done, not just a list of duties.

What this page is doingWhy start with the job.
3

Methods

Three methods were used. First, interviews of about forty-five minutes each with the head brewer, who designed the canning line project, and the two packaging leads who run the existing bottling line and will supervise the new technicians. Second, observation of a full eight-hour shift on the bottling line, noting tasks, tools, pace, breaks and hazards; most canning tasks closely resemble bottling tasks. Third, a checklist of thirty-two tasks drawn from the interviews and from the equipment maker's operating manual, which the head brewer and both leads rated separately for importance on a five-point scale and for frequency. Using several raters reduces bias; Morgeson and Campion (1997) traced inaccurate task ratings to two sources, pressures from the social setting and mental shortcuts raters take with complex work, so ratings were averaged and the large disagreements discussed.

What this page is doingHow the information was gathered.
4

Results

Highest-rated tasks for the canning line technician

TaskImportance (1 to 5)Frequency
Set up, run and monitor the canning line5.0Every shift
Check fill levels, seam quality and dissolved oxygen4.7Hourly
Change over the line between beers and can sizes4.3Several times a week
Clean and sanitize the line with caustic and acid solutions4.7Every shift
Record batch, quality and downtime data4.0Every shift
Fix minor jams and adjust settings4.3Daily
Load and stack cases and move kegs up to 50 pounds3.7Every shift
Give brewery tours to visitors1.7Occasionally

The ratings showed broad agreement. The leads rated quality checks slightly higher than the head brewer, reflecting their experience with returned product, and the final ratings use the average.

What this page is doingTasks and how they were rated.
5

Essential and Marginal Functions

Disability law turns on this distinction: the Americans with Disabilities Act asks whether an applicant or employee can do the core duties of a job, with or without a reasonable accommodation. The essential functions here are running and monitoring the line, quality checks, changeovers, cleaning and sanitizing, recording data and handling product up to 50 pounds, because the job exists to package beer safely and the line cannot run without them. Giving tours is marginal: it is occasional, others can do it and removing it would not change the job.

What this page is doingWhat the job exists to do.
6

Job Specification

Knowledge needed includes basic mechanical systems, food safety and sanitation and safe handling of cleaning chemicals. Skills include reading gauges and quality instruments, troubleshooting simple mechanical problems and recording data accurately. Abilities include standing and walking for most of a shift, lifting up to 50 pounds, working in noise with hearing protection and paying close attention during repetitive work. A high school diploma or equivalent is required; experience in food or beverage production or manufacturing is preferred but not required, because the company will train on its own equipment. The work design literature also stresses the social and physical side of work; Morgeson and Humphrey (2006) developed a questionnaire covering task, knowledge, social and contextual features, and their contextual items helped describe the noise, wet floors and carbon dioxide exposure here.

What this page is doingKnowledge, skills and abilities.
7

Classification

The job is nonexempt under the Fair Labor Standards Act, since it is hourly production work that does not meet any exemption test, so any week past forty hours earns technicians time and a half on every extra hour. Pay will be set in a later milestone based on the specification and market data.

What this page is doingOvertime and pay.
8

The Job Description

Job title: Canning Line Technician. Department: Packaging. Reports to: Packaging Lead. Status: full-time, hourly, nonexempt; first or second shift. Summary: Sets up, runs, cleans and maintains the canning line to package beer to the brewery's quality and safety standards. Essential functions: operate and monitor the canning line; perform quality checks on fill levels, seams and dissolved oxygen; change over the line between products; clean and sanitize equipment using caustic and acid solutions under safety procedures; record production and quality data; fix minor jams; handle cases and kegs up to 50 pounds. Other duties: occasional brewery tours and other tasks as assigned. Qualifications: high school diploma or equivalent; ability to lift 50 pounds and stand for most of an eight-hour shift; must be at least 21 to taste product for quality. Working conditions: noisy, wet floors, chemical and carbon dioxide exposure with protective equipment provided.

What this page is doingThe finished document.
9

Limits of the Analysis

The analysis has two limits. The canning line is not yet installed, so the tasks were drawn largely from the bottling line and the equipment manual; once the line runs for a few months, the leads should repeat the ratings and update the description. And the raters were all supervisors. Interviewing the first technicians hired, after ninety days, would add the view of people who actually do the work, which often reveals tasks that managers overlook, such as clearing jams on the depalletizer or covering breaks on the labeler. Job analysis should be repeated whenever equipment, volume or staffing changes significantly.

What this page is doingWhat to revisit.
10

How the Analysis Will Be Used

Recruiting will advertise the essential functions and real working conditions, so applicants know what to expect. Selection will test the abilities the job needs, such as a mechanical reasoning check and a short hands-on exercise. Pay will be compared with market rates for similar packaging roles. Training will cover the tasks with the highest importance ratings first, especially cleaning chemical safety.

What this page is doingLinks to other HR functions.
11

Conclusion

The analysis used interviews, observation and rated tasks to define the canning line technician role, separated essential from marginal functions and set requirements tied to tasks. The job description gives Kettle Creek a defensible base for hiring, pay and training as the canning line opens.

What this page is doingA job built on evidence.
12

References

Morgeson, F. P., & Campion, M. A. (1997). Social and cognitive sources of potential inaccuracy in job analysis. Journal of Applied Psychology, 82(5), 627-655. https://doi.org/10.1037/0021-9010.82.5.627

Morgeson, F. P., & Humphrey, S. E. (2006). The Work Design Questionnaire (WDQ): Developing and validating a comprehensive measure for assessing job design and the nature of work. Journal of Applied Psychology, 91(6), 1321-1339. https://doi.org/10.1037/0021-9010.91.6.1321

Sanchez, J. I., & Levine, E. L. (2012). The rise and fall of job analysis and the future of work analysis. Annual Review of Psychology, 63, 397-425. https://doi.org/10.1146/annurev-psych-120710-100401

What the HRM 200 Module 2 instructions ask for

The job analysis assignment in HRM 200 usually asks you to analyze a job in an organization and write a job description and job specification from the results. Expect to explain the methods used to collect information, such as interviews, observation or questionnaires, to list the main tasks and responsibilities, to identify the knowledge, skills and abilities required and to describe working conditions. Many versions ask how the analysis supports other HR functions and legal compliance. A strong paper shows real methods with named sources and dates, rates tasks by importance and frequency, distinguishes essential from marginal functions, classifies the job under wage and hour rules and explains how the results will be used for hiring, pay and training.

How this HRM 200 Module 2 job analysis assignment example is built

The sample analyzes a new canning line technician role at Kettle Creek Brewing. Information came from interviews with the head brewer and two packaging leads, a full shift of observation on the existing bottling line and a task checklist that the leads rated for importance and frequency. Essential functions include running and changing over the canning line, checking fill levels and seams, cleaning lines with caustic and acid solutions and lifting kegs and cases up to 50 pounds; marginal ones include giving brewery tours. The paper sets out knowledge, skills and abilities, describes noise, wet floors and carbon dioxide exposure, classifies the job as nonexempt and presents the job description that hiring and pay decisions will use.

Where the HRM 200 Module 2 rubric puts the points

The rubric commonly scores the description of job analysis methods, the completeness and accuracy of tasks and duties, the job specification, the treatment of working conditions and legal considerations, the quality of the job description and the explanation of how the analysis supports other HR functions. Strong papers use more than one method, rate tasks, separate essential functions with reasons and connect the analysis to selection, pay and training. Points are lost for descriptions copied from job boards, for requirements that are not linked to tasks, for omitting physical demands and hazards and for ignoring overtime classification under federal wage rules.

HRM 200 Module 2 help: the mistakes that cost points

Start with how you gathered information and from whom, because a job description is only as good as its sources. Use at least two methods, such as interviews and observation, and have people who know the job rate each task's importance and how often it is done. Mark essential functions, the ones the job exists to do, separately from marginal ones; this matters under disability law. Tie every requirement in the specification to a task, so you cannot be accused of asking for credentials the job does not need. Describe physical demands and hazards honestly. Finish by explaining how hiring, pay and training will use the results.

Get HRM 200 Module 2 written to your instructions

Upload the HRM 200 Module 2 instructions and the job you need to analyze. We describe the methods, list and rate the tasks, separate essential functions, set out the requirements and write the job description. About two days; the first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 200 papers and related BS Human Resource Management samples

HRM 200 Module 2 questions, answered

Where can I find a free HRM 200 Module 2 Job Analysis Assignment sample?

The full HRM 200 Module 2 assignment is on this page, with a job analysis and job description for a brewery canning line technician.

What is job analysis?

The systematic study of a job to identify its tasks, responsibilities, required knowledge, skills and abilities and working conditions.

What is the difference between a job description and a job specification?

A job description sets out what the job involves; a job specification sets out the qualifications a person needs to do it.

Why identify essential functions in a job description?

Because the Americans with Disabilities Act protects qualified people who can perform a job's essential functions with or without reasonable accommodation.

What methods are used in job analysis?

Common methods include interviews, direct observation, questionnaires or task checklists, work diaries and reviews of existing documents.