HRM 360 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This HRM 360 Module 3 Milestone One sample describes patterns in turnover data before any attempt to predict or explain them. SNHU HRM 360 (HRM-360) sets this first milestone in Module Three, where BS Human Resource Management students work with an organization's records. For the composite Northstar Mutual Insurance, the paper describes how the data set was built and cleaned, shows when new contact center representatives leave, compares first-year exit rates across schedules, commutes, recruiting sources, experience, assessment scores and supervisor teams, examines how factors overlap and draws cautious conclusions that set up the predictive model in the next milestone.

CourseHRM 360 People Analytics
ModuleModule 3
Paper typeundergraduate milestone presenting a descriptive analysis of turnover data
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 360 Module 3

1

Descriptive Analysis of First-Year Turnover Among Northstar Contact Center Representatives

[Student Name]

Southern New Hampshire University

HRM 360: People Analytics

Milestone One

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingNorthstar Mutual Insurance and its records are an invented teaching case; all rates are illustrative.
2

Descriptive Analysis of First-Year Turnover Among Northstar Contact Center Representatives

Introduction

The framing paper asked which factors are associated with first-year exits among Northstar Mutual's contact center representatives and which the company can change. Before building a model, the team needs to know what the data show plainly: how many leave, when, and how exit rates differ across the groups named in the hypotheses. This milestone presents that description and the cautions that come with it.

What this page is doingDescribing before explaining.
3

Building the Data Set

The data set joins records for every representative hired from three years ago through last year, 1,086 people in all. Six records were dropped: four were rehires whose original records could not be separated, and two were transfers from other departments. That leaves 1,080 hires. Termination dates and types come from the HR system, schedules from the scheduling system, recruiting source and assessment scores from applicant tracking and commute estimates from home ZIP codes. Recruiting source was corrected for 41 records using referral bonus payments. Schedule type is missing for the earliest 210 hires, whose schedule history had been deleted; those hires are included in all comparisons except schedule. Names were removed after joining.

What this page is doingPreparation and cleaning.
4

Overall Turnover and Timing

Of the 1,080 hires, 518, or about 48 percent, left within twelve months; 22 percent left within ninety days. About 78 percent of first-year exits were voluntary resignations and 22 percent were terminations, mostly for attendance. Exits are not spread evenly. A plot of exits by week of tenure shows a first peak in weeks seven to sixteen, right after the six-week classroom period and four-week nesting period end and representatives take calls alone, and a second, smaller peak around month six, when the company's practice has been to move representatives from their training schedule to whatever schedule the center needs. Rubenstein et al. (2018), in a meta-analysis of voluntary turnover predictors, found that job-related factors such as role stress and workload, together with attitudes and relationships at work, were among the most consistent predictors, which fits exits clustering at the points where the job becomes harder.

What this page is doingWhen people leave.
5

Exit Rates by Group

First-year exit rates by group

FactorGroupHiresLeft within a year
First scheduleFixed day38038 percent
First scheduleFixed evening29047 percent
First scheduleRotating41057 percent
CommuteUnder 15 minutes30040 percent
Commute15 to 30 minutes48046 percent
CommuteOver 30 minutes30058 percent
Recruiting sourceEmployee referral23034 percent
Recruiting sourceJob board56053 percent
Recruiting sourceStaffing agency conversion19041 percent
Recruiting sourceOther10060 percent
Prior call center experienceYes43041 percent
Prior call center experienceNo65052 percent
Assessment scoreTop quarter27041 percent
Assessment scoreBottom quarter27056 percent

Schedule counts cover the 870 hires with schedule records, reweighted to the full group for the table. Every hypothesis shows a difference in the expected direction. The largest gaps are for schedule, about 19 points between fixed day and rotating, commute, about 18 points, and recruiting source, about 19 points between referrals and job boards.

What this page is doingThe main comparisons.
6

Supervisor Teams

First-year exit rates across the fourteen supervisor teams range from 31 to 66 percent. That looks like a strong supervisor effect, but the three teams with the highest rates all run rotating evening shifts, and the two lowest run fixed day shifts. Team and schedule are tangled together, so the raw spread cannot be read as a measure of supervisor quality. Allen et al. (2014) argue that turnover analysis needs to consider how factors combine and interact over time rather than treating each in isolation, which is the reason the next milestone will model schedule and team together.

What this page is doingA wide spread, and a caution.
7

Overlapping Factors

Several factors overlap. Representatives with long commutes are more often on rotating schedules, because the evening and rotating openings are what remain when new classes start. Among hires with both a rotating schedule and a commute over thirty minutes, 69 percent left within a year, compared with 33 percent among those with a fixed day schedule and a commute under fifteen minutes. Referral hires are more likely to have prior experience, so part of the referral advantage may be experience. Survey evidence from large retail and food service chains (Schneider & Harknett, 2019) connects erratic, short-notice scheduling with psychological distress and poor sleep, which offers a plausible reason why rotating schedules combined with long commutes might push people out.

What this page is doingHow the drivers combine.
8

What the Description Shows

Three patterns stand out as most worth testing. First, schedule: rotating schedules are associated with far higher early exits, and the second exit peak lines up with the month-six schedule change. Second, commute, which seems to add to schedule strain. Third, recruiting source, with referrals clearly better. Prior experience and assessment scores show smaller but consistent differences. Supervisor effects may exist but cannot be judged until schedule is accounted for. None of these is yet a proven cause; each is an association that a model and, ideally, a test of a change can examine.

What this page is doingCautious conclusions.
9

Limits

Exit reasons are missing for most leavers, so the data show who leaves but not what they say. Schedule records are missing for the earliest hires. Commute is estimated from ZIP codes. And factors the data do not capture, such as child care or second jobs, may explain part of the schedule effect.

What this page is doingWhat the data cannot show.
10

Next Steps

The next milestone will fit a model that estimates the association of each factor with first-year exits while holding the others constant, validate it on hires it was not built from and check whether using it would treat any group unfairly. In parallel, the team will hold short conversations with twenty recent leavers to learn whether schedules are, as the data suggest, the main reason.

What this page is doingFrom description to prediction.
11

Conclusion

First-year exits at Northstar's contact center are concentrated right after training and at the month-six schedule change, and they are much higher for rotating schedules, long commutes and job board hires. Those patterns give the company promising places to act, once the model confirms which factors matter after accounting for their overlap.

What this page is doingClear patterns, careful claims.
12

References

Allen, D. G., Hancock, J. I., Vardaman, J. M., & McKee, D. N. (2014). Analytical mindsets in turnover research. Journal of Organizational Behavior, 35(S1), S61-S86. https://doi.org/10.1002/job.1912

Rubenstein, A. L., Eberly, M. B., Lee, T. W., & Mitchell, T. R. (2018). Surveying the forest: A meta-analysis, moderator investigation, and future-oriented discussion of the antecedents of voluntary employee turnover. Personnel Psychology, 71(1), 23-65. https://doi.org/10.1111/peps.12226

Schneider, D., & Harknett, K. (2019). Consequences of routine work-schedule instability for worker health and well-being. American Sociological Review, 84(1), 82-114. https://doi.org/10.1177/0003122418823184

What the HRM 360 Module 3 instructions ask for

Milestone One in HRM 360 usually asks you to explore and describe a workforce data set. Expect to explain how the data were prepared, report summary statistics, compare outcomes across groups using tables or charts, look at patterns over time and identify relationships worth testing further. Many versions ask you to discuss data quality and what the data cannot capture. A strong milestone documents cleaning decisions, chooses comparisons tied to the hypotheses, reports group sizes alongside rates, shows timing as well as totals, checks whether factors overlap before drawing conclusions and avoids claiming that a difference proves a cause, while still saying clearly which patterns matter most for the business question.

How this HRM 360 Module 3 milestone one example is built

The sample builds a data set of 1,080 representatives hired over three years, of whom about 48 percent left within twelve months. Exits bunch in weeks seven to sixteen, right after supervised nesting ends, and again around month six. First-year exit rates are 38 percent on fixed day schedules, 47 percent on fixed evenings and 57 percent on rotating schedules; 40 percent for commutes under fifteen minutes and 58 percent for those over thirty; 34 percent for referrals and 53 percent for job board hires. Fourteen supervisor teams range from 31 to 66 percent, but the three worst teams all run rotating evening shifts, so the paper treats team effects cautiously and sets up a model to separate them.

Where the HRM 360 Module 3 rubric puts the points

The milestone rubric commonly scores data preparation and documentation, the accuracy of descriptive statistics, the choice and clarity of comparisons and visuals, attention to timing, the analysis of overlapping factors, the interpretation of patterns and the link to the business question. High-scoring milestones show group sizes, use rates rather than raw counts, explain every cleaning step, examine when exits happen, test whether apparent effects are confounded and state conclusions with appropriate caution. Points are lost for undocumented cleaning, for charts without numbers or group sizes, for treating every difference as meaningful regardless of group size and for causal claims from descriptive data.

HRM 360 Module 3 help: the mistakes that cost points

Document what you did to the data, because readers will ask: which records were dropped, how missing values were handled, how variables were grouped. Then answer the simple questions first: how many left, when and in which groups, always with group sizes. Show timing, not just annual rates, since when people leave often says more than whether they leave. Before concluding that one factor matters, check whether it overlaps with another, using a simple cross-table; a supervisor's poor numbers may simply reflect the shifts the team works. Finish with the patterns most worth testing in a model, stated as cautious associations rather than causes, and list the limits of the data.

Get HRM 360 Module 3 written to your instructions

Upload the HRM 360 Milestone One guidelines and the data you were given. We build and clean the data set, describe exit timing and rates by group, check how factors overlap and state what the patterns can and cannot show. About two days; first milestones are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 360 papers and related BS Human Resource Management samples

HRM 360 Module 3 questions, answered

Where can I find a free HRM 360 Module 3 Milestone One sample?

The full HRM 360 Module 3 milestone is on this page, describing contact center turnover by schedule, commute, source, team and timing.

What is descriptive analytics in HR?

Summarizing workforce data to show what happened, such as turnover rates by group or over time, before testing explanations or making predictions.

Why report group sizes with turnover rates?

Because rates from small groups swing widely by chance, so a large difference between two small groups may mean little.

What is confounding in workforce data?

When two factors move together, such as a supervisor's team and the shift it works, so a difference attributed to one may actually come from the other.

Why look at when employees leave, not just whether they leave?

Timing points to causes; exits clustered after training or at a schedule change suggest where in the employee's experience problems arise.