HRM 360 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This HRM 360 Module 5 Milestone Two sample builds and tests a model that predicts which new employees will leave within a year. Module Five of SNHU HRM 360 (HRM-360) moves BS Human Resource Management students from description to modeling. For the composite Northstar Mutual Insurance, the paper explains the choice of a logistic regression, reports the association of each factor with first-year exits while holding the others constant, separates supervisor effects from schedule effects, validates the model on later hires, checks whether using it would affect protected groups unequally and concludes with how the model should and should not be used.

CourseHRM 360 People Analytics
ModuleModule 5
Paper typeundergraduate milestone presenting a predictive turnover model with validation and bias checks
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 360 Module 5

1

A Validated Model of First-Year Exits at Northstar Mutual Insurance

[Student Name]

Southern New Hampshire University

HRM 360: People Analytics

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingNorthstar Mutual Insurance, its data and all model results are an invented teaching case.
2

A Validated Model of First-Year Exits at Northstar Mutual Insurance

Introduction

Milestone One found three factors linked to early departures, rotating shifts, long drives to work and hiring through job boards, and found that they travel together. A logistic model separates each factor's pull from the others, so the rotating schedule is not credited for what the commute did, and it can be tried on hires it never saw. This milestone builds that model, validates it and decides how it should be used. Shmueli (2010) distinguishes models built to explain from models built to predict and warns that the two are judged by different standards; this model serves both aims, so it is judged on interpretable effects and on accuracy with new data.

What this page is doingFrom patterns to a model.
3

Data and Method

The model uses the 870 hires with full schedule records. The outcome is leaving within twelve months. Predictors are first schedule, commute group, recruiting source, prior call center experience and the standardized hiring assessment score. Logistic regression suits a yes or no outcome and reports each effect as an odds ratio. To test the model fairly, the 600 earliest hires were used to build it and the 270 most recent hires were held back for validation, which mimics how the model would be used: built on the past, applied to the future.

What this page is doingLogistic regression.
4

Results

Logistic regression of first-year exit, odds ratios with 95 percent confidence intervals

FactorComparisonOdds ratioConfidence interval
Rotating scheduleFixed day2.11.5 to 2.9
Fixed evening scheduleFixed day1.41.0 to 2.0
Commute over 30 minutesUnder 15 minutes1.81.2 to 2.6
Commute 15 to 30 minutesUnder 15 minutes1.20.9 to 1.7
Job board sourceEmployee referral1.91.3 to 2.8
Staffing agency conversionEmployee referral1.30.8 to 2.1
Prior call center experienceNone0.740.55 to 0.99
Assessment score, per standard deviation0.850.73 to 0.99

Holding the other factors constant, a rotating first schedule roughly doubles the odds of leaving within a year compared with a fixed day schedule. A commute over thirty minutes raises the odds by about 80 percent, and job board hiring by about 90 percent compared with referrals. Prior experience lowers the odds by about a quarter, and each standard deviation of assessment score lowers them by about 15 percent. In plainer terms, the model predicts a first-year exit rate of about 33 percent for a referred, experienced hire on a fixed day schedule with a short commute, and about 68 percent for a job board hire with no experience on a rotating schedule with a long commute.

What this page is doingWhat predicts first-year exits.
5

Supervisor Teams

A second model added indicators for the fourteen supervisor teams. Once schedule and the other factors were included, most of the apparent differences between teams shrank to sizes consistent with chance. Two teams remained higher than expected, with odds of exit about 1.8 times the average after adjustment; those supervisors will be offered coaching and their teams' exit conversations reviewed. The descriptive milestone's caution was justified: much of what looked like poor supervision was the shift pattern those teams run.

What this page is doingSeparating team from schedule.
6

Validation

Scored on the 270 held-back hires, it reached an AUC of 0.71: pick one representative who quit and one who stayed at random, and seven times in ten the quitter carried the higher score. That is useful but far from certain. Predicted and actual exit rates matched reasonably well across tenths of predicted risk, so the model is not systematically over- or under-predicting. If the company flagged the 28 percent of new hires with the highest predicted risk, about two-thirds of those flagged would leave, and about 40 percent of all leavers would be among those flagged.

What this page is doingDoes it work on new hires?
7

Adverse Impact

One possible use would be screening applicants: declining those with high predicted risk. Before anyone used the scores, the team ran the four-fifths comparison set out in the 1978 Uniform Guidelines. If applicants with a predicted risk above 60 percent had been screened out, the selection rate for Black applicants would have been 68 percent and for White applicants 86 percent, an impact ratio of 0.79, below the four-fifths threshold. The main reason is commute: distance from the Columbus center is related to where people live, which is related to race. Raghavan et al. (2020), examining vendors of algorithmic hiring tools, found that claims about removing bias were often vague and that predictors could act as proxies for protected characteristics, which is what happened here.

What this page is doingWould using it treat groups unequally?
8

How the Model Should Be Used

The model should not be used to screen applicants or to label individual representatives. It should be used to change the conditions it identifies. If new hires were placed on fixed schedules for their first six months and recruiting shifted toward referrals, the model predicts first-year exits would fall from about 48 to about 40 percent, roughly 29 fewer early exits a year, worth about $267,000. Dietvorst et al. (2015) found that people lose confidence in algorithms quickly after seeing them err, even when the algorithm outperforms human judgment, so the team will present the model's uncertainty openly and test the schedule change rather than ask leaders to trust a prediction.

What this page is doingConditions, not filters.
9

Sharing the Results

The vice president of service, the HR director and the workforce planning manager will receive the full results, including the odds ratios and the adverse impact check, in a short briefing. Supervisors will see the team-level findings, with the two teams whose exits remain high after adjustment discussed privately with those supervisors and their managers. No individual predictions will be produced for current employees, consistent with the rules set in the Module Four discussion. Representatives will learn through the newsletter that the analysis pointed to schedules and recruiting rather than to individuals.

What this page is doingWho sees what.
10

Limits

The model explains only part of who leaves; an area under the curve of 0.71 leaves much unexplained, including child care, health and other jobs. The 210 earliest hires lack schedule data. Associations are not causes: rotating schedules may go disproportionately to people who would have left anyway. A controlled trial, in which alternating training classes start on fixed or rotating patterns, is the way to learn whether changing schedules actually reduces exits.

What this page is doingWhat the model cannot do.
11

Conclusion

The model confirms that schedule, commute and recruiting source are strongly associated with first-year exits after accounting for overlap, and that most apparent supervisor differences reflect schedules. It predicts well enough to guide policy but not well enough to judge individuals, and using it to screen applicants would have adverse impact. Its value lies in pointing to conditions the company can change and test.

What this page is doingA careful model, used carefully.
12

References

Dietvorst, B. J., Simmons, J. P., & Massey, C. (2015). Algorithm aversion: People erroneously avoid algorithms after seeing them err. Journal of Experimental Psychology: General, 144(1), 114-126. https://doi.org/10.1037/xge0000033

Raghavan, M., Barocas, S., Kleinberg, J., & Levy, K. (2020). Mitigating bias in algorithmic hiring: Evaluating claims and practices. In Proceedings of the 2020 Conference on Fairness, Accountability, and Transparency (pp. 469-481). Association for Computing Machinery. https://doi.org/10.1145/3351095.3372828

Shmueli, G. (2010). To explain or to predict? Statistical Science, 25(3), 289-310. https://doi.org/10.1214/10-STS330

What the HRM 360 Module 5 instructions ask for

Milestone Two in HRM 360 usually asks you to build a predictive or explanatory model from workforce data and interpret it. Expect to choose an appropriate method, such as regression, explain your variables, report and interpret results, assess how well the model performs on data it was not built from and discuss limitations. Many versions ask about fairness or adverse impact. A strong milestone states whether the goal is explanation or prediction, reports effects with uncertainty, validates on held-out data, interprets results in business terms, tests whether using the model would affect protected groups unequally and recommends how the model should and should not be used.

How this HRM 360 Module 5 milestone two example is built

The sample fits a logistic regression to 870 Northstar hires with full records. Holding other factors constant, a rotating first schedule is associated with about double the odds of leaving within a year compared with a fixed day schedule, a commute over thirty minutes with about 1.8 times the odds and job board hiring with about 1.9 times the odds compared with referrals, while prior experience and higher assessment scores lower the odds. Once schedule is included, most of the spread among supervisor teams disappears. Tested on 270 later hires, the model's area under the curve is 0.71. A four-fifths check shows that screening applicants with it would have adverse impact, so the paper recommends using it to change conditions, not to filter people.

Where the HRM 360 Module 5 rubric puts the points

The milestone rubric commonly scores the choice and justification of method, the preparation of variables, the accuracy of results, interpretation in plain terms, validation, the treatment of fairness and adverse impact, and the recommendations for use. High-scoring milestones report odds ratios or effects with confidence intervals, validate on data not used to build the model, check calibration as well as accuracy, test for adverse impact and decide carefully how the model may be used. Points are lost for reporting only statistical significance without effect sizes, for testing on the same data used to build the model, for ignoring fairness and for recommending uses the evidence does not support.

HRM 360 Module 5 help: the mistakes that cost points

Decide first whether you are explaining or predicting, since the choice shapes how you judge the model. Use a method suited to the outcome, such as logistic regression when the result is stay or leave, and explain variables in plain language. Report effects with confidence intervals and translate them, for example as changes in the expected exit rate. Split your data so the model is tested on records it has not seen, ideally later ones. Check whether using the model to make decisions would screen out protected groups at different rates. Finish by saying how the model should be used, and how it should not.

Get HRM 360 Module 5 written to your instructions

Send the HRM 360 Milestone Two guidelines and your prepared data. We fit and explain the model, validate it on held-out records, check adverse impact with the four-fifths test and say how it should be used. Model write-ups of this kind are ready in roughly two days; we never bill a first milestone. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 360 papers and related BS Human Resource Management samples

HRM 360 Module 5 questions, answered

Where can I find a free HRM 360 Module 5 Milestone Two sample?

The full HRM 360 Module 5 milestone is on this page, with a validated model of first-year exits, an adverse impact check and a decision on its use.

Why use logistic regression for turnover?

Because the outcome is yes or no, leaving or staying, and logistic regression estimates how each factor changes the odds of that outcome while holding others constant.

What is an odds ratio?

A measure of how much a factor multiplies the odds of an outcome; an odds ratio of 2 means the odds are twice as high as in the comparison group.

How do you validate a predictive model?

Test it on data that were not used to build it, such as later hires, and check both how well it ranks people and whether its predicted rates match actual rates.

What is the four-fifths rule?

A guideline under which a selection rate for one group below 80 percent of the rate for the highest group is generally treated as evidence of adverse impact.