OL 211 Module 2 Job Analysis Assignment Example

Reviewed by Portia Lambrick, MBA

This OL 211 Module 2 Job Analysis sample studies one job in detail and turns the findings into a job description and specification that hiring, training and pay can rely on. SNHU OL 211 (OL-211) has BS Human Resource Management students analyze a real position. The job is residential HVAC service technician at Granite State Mechanical, a composite New Hampshire contractor whose only description dates from 2009. Using ride-alongs, interviews, a task survey of 31 technicians and dispatch records, the paper finds that customer conversations fill a third of each call, writes a new description and specification and explains how it guarded against bias in the data.

CourseOL 211 Human Resource Management
ModuleModule 2
Paper typeundergraduate assignment conducting a job analysis and writing a job description and specification for one position
LengthAbout 1,070 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for OL 211 Module 2

1

What a Service Technician Really Does: A Job Analysis at Granite State Mechanical

[Student Name]

Southern New Hampshire University

OL 211: Human Resource Management

Job Analysis Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe technicians, survey results and dispatch data are fictional, invented for OL 211.
2

What a Service Technician Really Does: A Job Analysis at Granite State Mechanical

Introduction

Of the six positions Granite State Mechanical cannot fill, four are for residential HVAC service technicians. The job description the company uses in its ads dates from 2009. It lists eleven duties, the longest of which is "other duties as assigned," and it requires "a positive attitude" and "own tools." Before the company can hire, train or pay these technicians well, it needs to know what the job involves today. This paper analyzes the position, writes a new job description and specification and explains how the analysis guarded against common sources of error.

What this page is doingExplains why this job comes first.
3

Methods

Four sources were used. I rode along with four technicians, chosen to vary in experience from two to twenty-six years, for a full day each, observing 23 service calls. I interviewed the two service supervisors and the dispatch manager. I surveyed all 31 residential HVAC technicians, asking them to rate 42 tasks, drawn from the ride-alongs and interviews, for how often they perform them and how important each is to a successful call; 29 responded. And I reviewed 1,200 dispatch records from the past year, which show call types and times, and 300 online customer reviews that mention a technician.

What this page is doingDescribes how the data were gathered.
4

Guarding Against Error

Morgeson and Campion (1997) described how social pressures can bend job analysis data, such as respondents presenting their jobs as more demanding than they are or conforming to what a group says, and by cognitive limits, such as information overload and careless responding. Several steps addressed these. The survey was anonymous and asked about frequency in concrete terms ("about how many times in a typical week") rather than abstract ratings. Observation and dispatch records were used to check survey answers; when technicians rated a task as frequent but the records showed it was rare, the records were trusted. Supervisors and technicians were interviewed separately so neither group could shape the other's account.

What this page is doingApplies research on job analysis accuracy.
5

What the Job Involves

Highest-rated tasks (29 technicians; frequency in a typical week, importance on a 1 to 5 scale)

TaskFrequencyImportance
Diagnose heating or cooling failures using meters, gauges and controls18 to 25 times4.9
Explain the problem and options to the homeowner in plain language18 to 25 times4.6
Repair or replace components such as igniters, capacitors, motors and boards12 to 18 times4.7
Perform seasonal maintenance on furnaces, boilers and air conditioners8 to 15 times4.1
Present repair-or-replace options with written estimates4 to 8 times4.2
Handle refrigerant under EPA Section 608 rules4 to 10 times4.5
Complete digital work orders, photographs and invoices on a tablet18 to 25 times3.9
Work in attics, crawl spaces and on rooftops in heat and cold6 to 12 times4.0

The ride-alongs showed what the old description missed. On the 23 observed calls, technicians spent an average of 34 percent of their time talking with homeowners: listening to the complaint, explaining the cause, presenting options and answering questions about cost. Customer reviews confirm this matters: of 300 reviews naming a technician, 71 percent praised or criticized how the technician explained things, while only 22 percent mentioned the quality of the repair itself.

What this page is doingSummarizes tasks by frequency and importance.
6

Analyzing Work by Its Purpose

Sanchez and Levine (2012) argued that job analysis should focus less on documenting fixed lists of tasks and more on understanding work in terms of its purpose and consequences, so that results stay useful as jobs change. The purpose of this job is not only to fix equipment but to restore a family's heat or cooling safely and leave them confident in what was done and why. Seen this way, the communication tasks are not extras; they are part of the core work, and the new description treats them so. The analysis also anticipates change: heat pumps are a growing share of installations in New England, and technicians who cannot service them will be less useful within a few years.

What this page is doingApplies work analysis.
7

The New Job Description

Position: Residential HVAC Service Technician. Reports to: Service Supervisor. Summary: Diagnoses, repairs and maintains residential heating, cooling and ventilation systems, including furnaces, boilers, air conditioners and heat pumps, and explains findings and options so homeowners can make informed decisions.

Essential functions: diagnose system failures using electrical and refrigeration test equipment; repair or replace components; perform scheduled maintenance; explain problems and options in plain language and present written estimates; handle refrigerant in compliance with federal rules; document work on a tablet, including photographs; drive a company van to customer homes within a 60-mile radius; work in confined spaces, at heights and in temperatures from below freezing to above 100 degrees; lift and carry equipment up to 70 pounds with or without assistive devices.

Other duties: assist apprentices on joint calls; take part in an on-call rotation about one week in six.

What this page is doingStates what the job involves.
8

The Job Specification

Specification linked to essential functions

RequirementLinked to
EPA Section 608 Universal certificationRefrigerant handling
New Hampshire mechanical license (gas fitter or equivalent) or eligibility within 12 monthsGas appliance repair and maintenance
Two or more years of residential HVAC service, or completion of an apprenticeshipDiagnosis and repair
Ability to read wiring diagrams and use meters and gaugesDiagnosis
Ability to explain technical problems in plain languageCustomer communication; estimates
Valid driver's license and acceptable driving recordDriving to calls
Physical ability to work at heights, in confined spaces and lift up to 70 pounds, with reasonable accommodationWorking conditions

"Positive attitude" and "team player" were removed because they could not be linked to a task or measured. "Own tools" was replaced by a company tool allowance, which the market now expects.

What this page is doingStates what the job requires.
9

How the Results Will Be Used

The analysis feeds every other HR function in this course. For hiring, Schmidt and Hunter (1998) ranked hiring tools by how well they forecast later performance, and tests that mimic the work, along with interviews built on set questions, sat near the top; the specification points to a diagnostic work sample and interview questions about explaining problems to customers. For training, the communication tasks become part of the apprentice curriculum. For appraisal, customer reviews and callback rates can measure both technical and communication work. And for pay, the description provides a basis for comparing this job with similar jobs in the regional market.

What this page is doingConnects the analysis to HR practice.
10

Limits

The ride-alongs covered only four technicians in late fall, so summer cooling calls are underrepresented. Two technicians did not answer the survey. The company should rerun the analysis within two years, earlier if heat pump work grows faster than expected.

What this page is doingNotes what the analysis cannot show.
11

References

Morgeson, F. P., & Campion, M. A. (1997). Social and cognitive sources of potential inaccuracy in job analysis. Journal of Applied Psychology, 82(5), 627-655. https://doi.org/10.1037/0021-9010.82.5.627

Sanchez, J. I., & Levine, E. L. (2012). The rise and fall of job analysis and the future of work analysis. Annual Review of Psychology, 63, 397-425. https://doi.org/10.1146/annurev-psych-120710-100401

Schmidt, F. L., & Hunter, J. E. (1998). The validity and utility of selection methods in personnel psychology: Practical and theoretical implications of 85 years of research findings. Psychological Bulletin, 124(2), 262-274. https://doi.org/10.1037/0033-2909.124.2.262

What the OL 211 Module 2 instructions ask for

The Module 2 assignment in OL 211 usually asks you to conduct a job analysis for one position and produce a job description and job specification. Expect to explain the methods you used, such as observation, interviews, questionnaires or records, summarize the tasks, duties and working conditions and identify what a person must bring to the job, from knowledge and skills to licenses. Strong OL 211 job analyses draw on several sources, rank tasks by how often they occur and how much they matter, distinguish essential functions from marginal ones, note physical demands and working conditions accurately and explain how the analysis will be used in hiring, training, appraisal and pay. They also acknowledge the limits of the data, such as employees exaggerating difficult tasks.

How this OL 211 Module 2 job analysis assignment example is built

The sample analyzes the residential HVAC service technician position at Granite State Mechanical, a composite contractor in Manchester, New Hampshire, whose only description dates from 2009. The writer rode along with four technicians, interviewed two supervisors, surveyed 31 technicians on task frequency and importance and reviewed 1,200 dispatch records and 300 customer reviews. Customer communication and repair-or-replace conversations take about a third of each call but are missing from the old description. The paper writes a new description and specification, separates essential functions for legal purposes and uses Morgeson and Campion on sources of inaccuracy and Sanchez and Levine on analyzing work by its purpose to explain the method.

Where the OL 211 Module 2 rubric puts the points

Job analysis papers in OL 211 are generally graded on sound and varied methods, a complete and accurate list of tasks with frequency and importance, a job description that separates essential from marginal functions, a specification of required knowledge, skills and abilities linked to the tasks, attention to working conditions and legal considerations and clear explanation of how the results will be used. The best papers present task data in tables and show how each requirement in the specification traces back to a task. Papers lose marks for copying a generic description, relying on one source, listing qualities such as "team player" with no link to tasks or ignoring physical demands.

OL 211 Module 2 help: the mistakes that cost points

Choose one job and gather information from at least two or three sources: watch the work, interview people who do it and their supervisors and use records such as schedules or work orders. A short survey asking how often each task is done and how important it is helps you rank tasks. Look for tasks the current description misses. Write the description with a summary, essential functions, other duties and working conditions, including physical demands. Then write the specification: the knowledge, skills, abilities and credentials each essential task requires. Note where your data might be biased, and explain how hiring, training and pay will use the results.

Get OL 211 Module 2 written to your instructions

Share the OL 211 Module 2 directions and the job you are analyzing. We choose and combine job analysis methods, identify tasks with their frequency and importance, write a job description and specification that separate essential functions and explain how the method limits bias, with research behind each step. The first OL 211 job analysis is written free, typically within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 211 papers and related BS Human Resource Management samples

OL 211 Module 2 questions, answered

Where can I find a free OL 211 Module 2 job analysis sample?

This page includes the full OL 211 Module 2 job analysis of an HVAC service technician at a composite contractor, with a new job description and specification.

What is a job analysis?

A systematic study of a job's tasks, duties, working conditions and the knowledge, skills and abilities needed to perform it, used for hiring, training, appraisal and pay.

How does a job description differ from a job specification in OL 211?

The description covers the duties and conditions of the work; the specification lists what a person must bring to it, such as licenses, skills and abilities a person needs to do it well.

What are essential functions?

The fundamental duties of a position, as opposed to marginal tasks; under the Americans with Disabilities Act they help determine whether a person can perform the job with or without accommodation.

Why use more than one job analysis method?

Each method has blind spots; combining observation, interviews, surveys and records reduces bias and catches tasks a single source would miss.